City of Charlottesville Capital Project Report

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: 250 Bypass Shared Use Path
Description: Construct paved shared use path between Hydraulic Road and Meadowbrook Heights along north side of 250 bypass, including under the Dairy Road bridge
Location: 250 Bypass
Budget: 900000
Start Date: 06/01/19
Project Manager: Chris Gensic
Status: Archived CIP
Comments: Project re-started with CMU wall and expected completion Feb 2020

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Avon - Hinton
Description: Add Bike lanes and curb ramps
Location: Avon St at Belmont Bridge to Hinton Ave
Budget: $76,100
Start Date: 04/02/18
Project Manager: Tim Motsch
Status: Archived CIP
Comments: Survey has begun; Design complete November; Construction as a “betterment” with Belmont Bridge

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Cabell Avenue Sidewalk
Description: Sidewalk improvement PROJECT CANCELED DUE TO DESIGN AND FUNCTION ISSUES.
Location: Cabell Ave from Burnley Ave to 823 Cabell Ave.
Budget:
Start Date: 11/01/17
Project Manager: Tim Motsch
Status: Archived CIP
Comments: Design 95% complete. Easement acquisition in progress. Bid early 2020; Construction summer 2020. PROJECT CANCELED DUE TO DESIGN AND FUNCTION ISSUES.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Citywide ADA Curb Ramps
Description: Curb ramps will be upgraded throughout the city at various locations in the 10th and Page Neighborhood, as well as the intersection of Belmont Avenue/Rialto Street, Belmont Ave/Church St.
Location: Various locations 10th and Page Neighborhood, Belmont Avenue/Rialto Street, Belmont Ave/Church St.
Budget: 158000
Start Date: 09/01/18
Project Manager: Amanda Poncy
Status: Archived CIP
Comments: Ongoing Construction

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Covenant School Sidewalk - Tim
Description: Install sidewalk
Location: Covenant School
Budget: 325000
Start Date: 11/11/11
Project Manager: Tim Motsch
Status: Archived CIP
Comments: 95% design complete. ROW acquisition near complete. Bid November 2019. Construction early 2020.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Emmet Street Bicycle and Pedestrian Feasbility
Description: Feasibility study for bicycle and pedestrian connections along and across Emmet Street between Arlington Blvd and Morton Drive.
Location: Arlington Blvd to Morton Drive
Budget: 38485
Start Date: 01/16/19
Project Manager: Amanda Poncy
Status: Archived CIP
Comments:

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Franklin Street Sidewalk 2
Description: Install new sidewalk
Location: Franklin Street from Nassau Street to Moores Creel Lane
Budget: 204263
Start Date: 02/01/19
Project Manager: Tim Motsch
Status: Archived CIP
Comments: 90% design complete. ROW acquisition to start. Bid anticipated early 2020.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Greenbrier Park Multiuse Trail and Boardwalk
Description: Construct stone dust trail and boardwalk along north side of Meadow Creek in accordance with park master plan
Location: Greenbrier Park
Budget: 270000
Start Date: 11/11/11
Project Manager: Chris Gensic
Status: Archived CIP
Comments: Construction 90% complete. Punch list items remain.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Harris Road Improvement
Description: 850 ft of new sidewalk. Also includes bike lane.
Location: Harris Rd from Moseley Dr to Jefferson Park Ave.
Budget:
Start Date: 11/11/21
Project Manager: Tim Motsch
Status: Archived CIP
Comments: 95% plans (SW and BMP) complete. ROW acquisition starting. Bundle Rose Hill Sidewalk, Harris Street Sidewalk, and Harris Road Sidewalk, advertise for construction Spring 2020, construction second half 2020.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Harris Street Sidewalk
Description: Sidewalk improvement
Location: Harris Street between Rivanna Avenue and McIntire Road
Budget: $285,000
Start Date: 02/06/18
Project Manager: Tim Motsch
Status: Archived CIP
Comments: Right of way acquisition in progress; Design at 95%; Construction Late 2018/early 2019

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Hillcrest Sidewalk / Trail Connection
Description: New sidewalk with upgraded ADA ramps, crosswalks, and trail connection.
Location: Along Hillcrest Rd.
Budget: 1124148
Start Date: 04/01/12
Project Manager: Jeanette Janiczek
Status: Archived CIP
Comments: Appropriation and project agreement executed. Bid package submitted to the VDOT for advertisement for Summer 2021.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: JPA Pedestrian Crossing Improvements
Description: The proposed changes include curb extensions at crosswalks, median refuge islands and a pedestrian activated rapid flashing beacon and crosswalk across Jefferson Park Avenue from Robertson/Stribling to Cleveland/Sunset. The preliminary concepts were first presented at the Fry’s Spring Neighborhood Association meeting on October 9, 2013. Preliminary Engineering is underway.
Location: Jefferson Park Avenue
Budget: 42889
Start Date: 12/01/18
Project Manager: NDS
Status: Archived CIP
Comments: Preliminary Engineering is currently underway. Attended FSNA Meetings in Jan. + Feb. 2019 to solicit feedback. www.charlottesville.org/JPACrossings

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: McIntire Park Railroad Bicycle Pedestrian Bridge
Description: Construct Bicycle and Pedestrian Bridge over Norfolk Southern Railroad to connect park and support 250 bypass trail
Location: McIntire Park
Budget: CIP and VDOT grant
Start Date: 05/01/18
Project Manager: Gensic, Chris
Status: Archived CIP
Comments: Bridge is under construction. 85% complete. Anticipate completion December 2018.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Meadow Creek Trail and Bridge
Description: Construct stone dust path and bike/ped bridge for trail from Brandywine Drive upstream and over Meadow Creek
Location: Meadow Creek Valley at Brandywine Drive
Budget: $175,000
Start Date: 05/01/18
Project Manager: Chris Gensic
Status: Archived CIP
Comments: DCR Recreational Trails grant funded project to consturct new bridge over creek. Seperate project will install stone dust path to Brandywine Drive/Greenbrier Park. Bid anticipated January 2019

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Monticello Avenue Bicycle and Pedestrian Improvements
Description: The project involves bicycle and pedestrian improvements at Monticello Ave/Ridge Street and Monticello Ave/2nd Street, including curb extensions, curb ramps and crossing improvements and bicycle pavement markings in keeping with the SIA Plan
Location: Ridge and 2nd Street
Budget: 547730
Start Date: 01/01/19
Project Manager: NDS
Status: Archived CIP
Comments: A citizen information meeting was held on 4/17/19. Preliminary Engineering is underway - 90% design.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Monticello Avenue Bicycle and Pedestrian Improvements
Description: The project involves bicycle and pedestrian improvements at Monticello Ave/Ridge Street and Monticello Ave/2nd Street, including curb extensions, curb ramps and crossing improvements and bicycle pavement markings in keeping with the SIA Plan
Location: Ridge and 2nd Street
Budget: 547730
Start Date: 01/01/19
Project Manager: NDS
Status: Archived CIP
Comments: A citizen information meeting was held on 4/17/19. Preliminary Engineering is underway - 90% design.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Monticello Avenue Bicycle and Pedestrian Improvements
Description: The project involves bicycle and pedestrian improvements at Monticello Ave/Ridge Street and Monticello Ave/2nd Street, including curb extensions, curb ramps and crossing improvements and bicycle pavement markings in keeping with the SIA Plan
Location: Ridge and 2nd Street
Budget: 547730
Start Date: 01/01/19
Project Manager: NDS
Status: Archived CIP
Comments: A citizen information meeting was held on 4/17/19. Preliminary Engineering is underway - 90% design.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Montrose Avenue Sidewalk
Description: Sidewalk improvement
Location: Montrose Ave from Monticello Ave to Monticello Rd.
Budget:
Start Date: 07/10/18
Project Manager: Tim Motsch
Status: Archived CIP
Comments: Complete.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Multi-Use Path Hillcrest - Jeanette
Description: Sidewalk project.
Location: Hillcrest Rd and Edgehill Rd
Budget: 0
Start Date: 07/01/20
Project Manager: Jeanette Janiczek
Status: Archived CIP
Comments:

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: New Sidewalks (Citywide)
Description: 100 ft of new sidewalk in front of 1430 Kenwood Lane.
Location: Kenwood Ln near Concord Dr.
Budget:
Start Date: 11/27/21
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: New Sidewalks (Citywide)
Description: 150 ft of new sidewalk on E High Street.
Location: 1430 E High St.
Budget: $20,000
Start Date: 11/11/21
Project Manager: Marty Silman
Status: Archived CIP
Comments: In review.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: New Sidewalks (Citywide)
Description: 550+ ft of new sidewalk.
Location: Belleview Ave and River Rd.
Budget:
Start Date: 11/11/21
Project Manager: Hugh Blake
Status: Archived CIP
Comments: On hold: SUP application recently withdrawn. Working to include sidewalk for site redevelopment as part of plan approval.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: New Sidewalks (Citywide)
Description: 300 ft of new sidewalk.
Location: Albemarle St from Page to West St.
Budget:
Start Date:
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: New Sidewalks (Citywide)
Description: New sidewalks from the sidewalk priority list.
Location: Citywide.
Budget: $285,000/yr
Start Date: 07/01/11
Project Manager: Marty Silman / Hugh Blake
Status: Archived CIP
Comments: Ongoing construction.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Ped Improvements Monticello Ave and 2nd St - Tim
Description: Ped improvements.
Location: Monticello Ave and 2nd St Intersection
Budget: 485000
Start Date: 02/03/20
Project Manager: Tim Motsch
Status: Archived CIP
Comments:

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Preston Ave and Harris St Intersection - Jerry
Description: Install ADA compliant curb ramps, pedestrian refuge, and crosswalk markings to improve accessibility and safety at this site.
Location: 38°02'06.3"N 78°29'08.2"W
Budget: 245725
Start Date: 09/24/21
Project Manager: Project Manager
Status: Completed CIP
Comments: A request for pay rates and overhead has been requested of the selected offeror. Afterwhich, the City and VDOT will review the rates before awarding the contract and issuing a Notice To Proceed (NTP).

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Rose Hill / Rugby Sidewalk
Description: Sidewalk and intersection improvement. Separate projects for sidewalk ($380,500) and signal ($535,000).
Location: Sidewalk on Rose Hill Drive, Madison to Rugby; Rose Hill/Rugby Intersection Improvements
Budget:
Start Date: 03/06/18
Project Manager: Tim Motsch
Status: Archived CIP
Comments: Public meeting late September; Design completion late 2019; Bundle Rose Hill Sidewalk, Harris Street Sidewalk, and Harris Road Sidewalk, advertise for construction Spring 2020, construction second half 2020.

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Rugby Avenue Shared Use Path
Description: Create multi use trail at Rugby Avenue entry to McIntire Park to complement railroad bridge into East McIntire. Parking lot in future phase.
Location: Rugby Avenue and 250 bypass
Budget:
Start Date: 05/01/15
Project Manager: Chris Gensic
Status: Archived CIP
Comments: Parking lot portion on hold. VDOT Grant awarded for Rugby Avenue Trail. Project redesign to provide more buffer, greenspace and trail width. Federal dollars Rescinded Oct 1 to be re-awarded December (TBA)Anticipated construction early 2020 if funding is restored

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: South McIntire Park Trail
Description: Construct shared use ADA compliant trail from Vietnam Memorial to new pedestrian bridge in East McIntire Park
Location: Vietnam Memorial to Pedestrian Bridge
Budget: 0
Start Date: 12/03/18
Project Manager: Danny McClung
Status: Archived CIP
Comments: Construction underway, 10% complete

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Test Simpson
Description: Test Simpson
Location: Test Simpson
Budget: 55
Start Date: 04/11/23
Project Manager: Test Simpson
Status: Archived CIP
Comments: Test Simpson

Project Type: BICYCLE, PEDESTRIAN, AND TRAILS PROJECTS
Project Name: Water Street Shared Use Path
Description: 8 foot wide paved multi-use trail with trees and fence along railroad
Location: Water Street between Belmont Bridge and 10th Street/Coal Tower Trail
Budget:
Start Date: 12/01/14
Project Manager: Chris Gensic
Status: Archived CIP
Comments: Bid awarded, work to begin October 14. Completion by April 2020

Project Type: ENVIRONMENTAL
Project Name: Energize!Charlottesville
Description: Energize!Charlottesville (energizecharlottesville.org) - our community campaign to save energy.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Susan Elliott
Status: Archived CIP
Comments: Per 2017 Global Covenant of Mayors commitment: GHG inventory based on 2016 data published (phase 1), new emission reduction goals have been been adopted (45% by 2030 and carbon neutrality by 2050) (phase 2), moving into climate action planning (phase 3 - to be completed in 2020). ClimateActionTogether.com is the collaborative effort with County and UVA on this topic.

Project Type: ENVIRONMENTAL
Project Name: Green Infrastructure Program
Description: Inventory, assess, and establish assets and strategies regarding the use of natural systems to support, protect, and enhance the quality of water, air and habitat; compile locally relevant data, tools, and resources for external and internal reference.
Location: Citywide
Budget:
Start Date: 02/01/14
Project Manager: Kristel Riddervold
Status: Archived CIP
Comments: Ongoing; online mapping tool (www.charlottesville.org/CityGreenMap) launched; technical assistance (mapping, analysis, evaluation) from GIC. Refined Possible Planting Area Map Books completed (filter, exclusions, criteria) with City-wide and neighborhood scale versions; project report/guidebook (GreenPrint) being finalized.

Project Type: ENVIRONMENTAL
Project Name: Meadowcreek Restoration
Description: Stream restoration maintenance
Location: Meadowcreek
Budget: 0
Start Date: 10/07/19
Project Manager: The Nature Conservancy
Status: Archived CIP
Comments:

Project Type: ENVIRONMENTAL
Project Name: Moores Creek Dam Removal
Description: Partial removal of a small breached dam to reduce streambank erosion and improve aquatic habitat. Dam and pump house foundation are associated with Fry's Spring Historic District and mitigation measures include leaving portions of the structure and related features and developing/installing interpretive signage. Partners include FWS, DGIF, RCA, RWSA and historic agencies/orgs.
Location: Moores Creek (Near the End of McElroy Drive)
Budget: 28
Start Date: 05/01/17
Project Manager: DGIF
Status: Archived CIP
Comments: Removal complete. Interpretive signage completed and installed

Project Type: ENVIRONMENTAL
Project Name: Pollocks Branch Walkable Watershed
Description: Collaboration between 3 localities to promote green infrastructure through capacity building, education events, "walkable watershed" planning process, and installation of a capstone green infrastructure project. Emphasis is on connecting the neighborhood to natural resources, walk/bikeability, water quality, resident engagement/education. Focus area is the lower Pollocks Branch Watershed and is aligned with SIA initiative.`
Location: Area between Ridge St, Monticello Ave, and Avon St
Budget: Grant Supported
Start Date: 05/01/14
Project Manager: Dan Frisbee
Status: Archived CIP
Comments: 2016 focus = community outreach & art installations. 2017 = Opportunities to improve walkability & water quality explored/evaluated. 2018 project: rainwater harvesting system at CRHA S 1st St site to support new urban farm. Upcoming project: Pollock Branch Bridge between S 1st St and Rockland Ave.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: By-Pass Firehouse Redevelopment
Description: Design and construction of a replacement for Station 1 (By-Pass Station).
Location: McIntire Park - West
Budget: 5917885
Start Date: 07/15/19
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Design has begun. Programming is nearly complete and early site selection and conceptual design is underway.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: CATEC - Parking Lot Re-paving
Description: Mill and re-pave large section of the CATEC parking lot and travel lanes. Re-stripe.
Location: 1000 Rio Road
Budget: 150000
Start Date: 06/10/19
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Work is complete.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Central Library Chiller Replament
Description: Replacement of aging chiller serving the Library.
Location: 201 East Market Street
Budget: 275000
Start Date: 01/27/20
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: Project bid date was 12/12/19, four contractors bid on project, the low bid was $47,650 over budget. Working with County to identify additional funding,

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Central Library Restroom Renovations (Phase 2)
Description: Remodel upper level restrooms to include: two single general neutral ADA restrooms, a men's restroom, a women's restroom and a staff restroom.
Location: 201 East Market Street
Budget: 275000
Start Date: 05/01/19
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: This is a City/County joint project. Design is complete and ready for bidding. Bidding to occur in January. Construction to begin 4/1/20.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Circuit Court Renovation & Addition
Description: Major interior renovation and addition to accommodate current security, court operations, and ADA needs and requirements. The new work will include: new restrooms; a new second courtroom & associated court-related functions on the lower level; an elevator; and a new secure sally-port w/ adjacent holding cells (in a new building addition).
Location: 315 East High Street
Budget: 5357000
Start Date: 01/07/19
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Demolition is complete. Environmental and shoring work is complete. Interior framing is complete. Rough-in of MEP & Fire protection is underway. Sally port addition and site utilities are underway. Project is about two weeks behind schedule due to masonry sub-contractor issues.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: City Hall Reconfiguration
Description: Renovate former MMM Design space in MSPG and move Assessor's Office to there; renovate former Assessor's space and move Finance to there; renovate former Finance space and move HR to there; renovate former HR space and move certain exec/council staff there. Renovate NDS open work area to accommodate more staff. When complete, modify the interior way finding signage in the City Hall Complex. Update CM's office.
Location: 605 East Main Street
Budget: 369000
Start Date: 07/02/18
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Assessor's space is complete and they've moved in. Finance space is complete and they've moved in. NDS space is complete and they've moved in. HR space is under construction with move in scheduled for end of January. Exec/council space is in design.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: City Warehouse Restroom Upgrades
Description: Construct new and/or additional Women's restrooms in the center main level of the warehouse building.
Location: 325 4th Street NW
Budget: 100000
Start Date: 01/01/19
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Design has begun, but, is now on hold.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: City Yard Warehouse HVAC Upgrade
Description: Upgrade of all HVAC equipment for Facilities Development, Police, Traffic, Gas & Water offices located in the west end of the Warehouse.
Location: 325 4th. Street NW
Budget: 245000
Start Date: 03/18/19
Project Manager: Facility Maintenance
Status: Archived CIP
Comments: Work is complete.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Facilities Development AC Replace
Description: Replacement of the HVAC equipment and ductwork serving the Facilities Development offices
Location: City Yard Warehouse
Budget: 267000
Start Date: 03/04/19
Project Manager: Gerry Martin
Status: Archived CIP
Comments:

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Fontaine & Ridge Fire Station De-Con Showers
Description: Construct decontamination showers at both Fontaine and Ridge stations.
Location: multiple
Budget: 46000
Start Date: 03/01/19
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Design is complete. Project has been bid and awarded. Construction is Substantially Complete.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Gordon Avenue Library Restrooms and Children's Area
Description: Renovate restrooms for ADA accesibility and make significant upgrades to the Children's Section to include a forest theme.
Location: 1500 Gordon Avenue
Budget: 375000
Start Date: 11/11/11
Project Manager: Michael Goddard
Status: Archived CIP
Comments: Forest theme in Children's Section to include acoustic "leaves" in ceiling and "vines" at windows and area threshold. Project is complete with the exception of an outstanding furniture order and a minor lighting adjustment..

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Health Department ADA Restrooms and WIC Counter
Description: Renovate two restrooms and a WIC counter to allow for ADA access while upgrading finishes.
Location: 1138 Rose Hill Drive #108
Budget:
Start Date: 11/11/11
Project Manager: Michael Goddard
Status: Archived CIP
Comments: Project is complete.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Health Department Exterior Upgrades
Description: Exterior building improvements; concrete curbs & flatwork; ADA curb cuts & parking upgrades; repaving and restriping of parking lot; building envelope work.
Location: 1138 Rose Hill Drive
Budget: 315000
Start Date: 03/23/20
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: This is a City/County joint project. Design work is complete; Site drawings complete and reviewed by NDS and health department; IFB has been issued and awarded (low bid was within target beget). Construction to begin in March 2020.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Joint General District Courts
Description: Albemarle County and the City of Charlottesville have agreed to jointly construct a new General District Court facility. The project will provide new space for the General District Courts of both jurisdictions...including courtrooms, clerk's space, Albemarle Commonwealth Attorney, and other key elements. The project will be built on the existing Levy property and will retain the 'old opera house' as part of the project.
Location: 350 Park Street
Budget: 6838028
Start Date: 07/01/19
Project Manager: Albemarle County
Status: Active CIP
Comments: This is a City/County joint project. Establishment of coordination protocols is complete. Architecture firm has been selected and contract is wrapping up (held by AlbCo) Dates shown are very preliminary estimates.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: McIntire Building Roof Replacement
Description: The existing roof was installed in 1994, and it is now beyond the end of its useful life. This project will replace the EPDM roof with a new TPO roof.
Location: 200 2ND Street NE
Budget:
Start Date: 11/11/11
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: This project is complete.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Police & City Hall Main Electrical Switch Gear
Description: Replace aging main electrical switchgear.
Location: 606 East Market Street
Budget: 70000
Start Date: 01/17/19
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Design is underway.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Preston-Morris Building
Description: Upfit of the existing lower level "shell space" to create a new conference room for the J&DR Court Services Unit. The work will also include upgrades to select interior finishes throughout the building; primarily carpet, paint & lighting.
Location: 407 E High Street
Budget: 166
Start Date: 08/13/18
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: This project is complete. Albemarle County is a 50% financial partner on this project.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Procurement - New Offices
Description: To accommodate additional staff, this project will add two new offices, to be located adjacent to Purchasing's existing office suite, in the City Warehouse.
Location: 325 4TH Street NW
Budget:
Start Date: 11/11/11
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: This project is complete

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Public Works Salt Barn Replacement
Description: The City's only salt storage facility, which is located on the lower bench of the Avon Street Yard, was constructed in the early 1980’s. The building consists of one large 48’x60’ enclosed volume for salt storage. A July 2016 structural assessment revealed that the structural integrity of the building has been compromised due to many years of age, coupled with the strain of containing 1,200 tons of bulk salt.
Location: 1545 Avon Street Extended
Budget: 760000
Start Date: 11/01/19
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: The new replacement salt storage facility would have a storage capacity of 1,500 tons. Albemarle County has indicated that a site plan Letter of Revision will be required for this project. No ARB review will be necessary, as this location is not visible from the Entry Corridor. Design is complete; costing is complete. Some funding is in hand, additional funding request in FY 2021 CIP forthcoming.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Public Works Training Room Renovation
Description: Renovate Training Room; provide for more uses and flexibility; provide for emergency command operations.
Location: 305 4th Street NW
Budget: 80000
Start Date: 07/01/19
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Scope definition is beginning. Design in the fall; construction in winter 2020.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Public Works/Fleet Shop Renovation
Description: Replace lighting; re-painting; remove in-ground lift; installation of a new by door.
Location: 325 4th Street NW
Budget: 225000
Start Date: 03/01/19
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Work has been awarded and begins on site in September.

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Smith Recreation Center
Description: Smith Recreation Center IAQ
Location: 1000 A Cherry Ave
Budget: 0
Start Date: 01/17/19
Project Manager: Mark Zavicar
Status: Archived CIP
Comments: Updates regarding process to identify and provide recommendations to solve IAQ issues. TLC Consultant will be onsite 01.17.19 @ 8AM to inspect facility. Face to face with selected facility stakeholders are being scheduled now. Consultant tasked with developing scope of services to be contracted to our selected MEP. Agreed to timetable for completion of this by January 31, 2019

Project Type: FACILITY CONSTRUCTION/RENOVATION-CITY GOVERNMENT
Project Name: Smith Recreation IAQ
Description: Smith Recreation Design and Specification project to address historic IAQ concerns.
Location: 1000 Cherry Ave
Budget: 185000
Start Date: 04/18/19
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: PO Issued to LPA on April 18. LPA / City Project Planning meeting held on December 19, 2019 Attached on City Ops Viewer is the Project Planner and Deliverable Time Lines. Virginia A&E has been selected to perform CA for this facility. Expect scope proposal by January 15 with an anticipated delivery of the CA report by March 3, 2020. CA report will drive interior rehabilitation work to begin after the facility closing on May 3.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Auditorium Seating Renovations (Burnley-Moran & Johnson Elementary Schools)
Description: This project will replace all of the outdated & worn seating in the auditoriums of Burnley-Moran and Johnson. The project will also include new floor finishes.
Location: 1300 Long Street
Budget:
Start Date: 06/25/18
Project Manager: Mike Mollica
Status: Archived CIP
Comments: Construction began immediately after the last day of school. Demolition was completed and then the seating supplier went out of business. A new seating supplier was sourced and installation was completed in early November. Some warranty work remains, but, this project is essentially complete.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Buford Exterior Envelope Improvements
Description: Exterior Envelope Restoration including masonry repairs, sealant replacement, concrete repairs, steel structure repairs, and exterior painting.
Location: 1000 Cherry Avenue
Budget: 450
Start Date: 06/10/19
Project Manager: Mike Goddard
Status: Archived CIP
Comments: Construction is complete.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Burnley Moran Modernization
Description: Third in the series of elementary school modernization projects focused on renovating learning spaces, adding new technology and furniture.
Location: Burnley Moran Elementary
Budget: 1250000
Start Date: 06/08/20
Project Manager: Michael Goddard
Status: Archived CIP
Comments: Project is in design

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: CATEC BAS Upgrade
Description: Upgrade of 30 year old NOVAR building automation system.
Location: 1000 East Rio Road
Budget: 190000
Start Date: 06/08/20
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: In the process of getting an engineer onboard and IFB document

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: CCS Central Office Conference Room
Description: This is an interior renovation project that will relocate a few cubicle offices, to allow for the construction of a new conference room for CCS. The new conference room will be sized to seat 14 at the table, and the room will include new finishes (flooring, ceiling, lighting, A/V, etc.).
Location: 1562 Dairy Road
Budget:
Start Date: 11/11/11
Project Manager: Mike Mollica
Status: Archived CIP
Comments: This project is complete.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: CCS Modualr Classrooms
Description: Site plan approval and implementation of installing modular classroom at select CCS campuses
Location: 1562 Dairy Road
Budget: 100000
Start Date: 01/09/18
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Obtain site plan approval for installation of modular classrooms at Burnley-Moran, Johnson, Venable, Jackson-Via, and Walker. Development of site plans is underway with the goal of obtaining approval from NDS by late April 2019. CCS to advise if, and where, any modular classrooms are desired by 5/1/19.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: CCS Modular Classroom Additions
Description: Obtain Site Plan approval and have installed modular classrooms at select CCS campuses
Location: 1562 Dairy Rd
Budget: 100000
Start Date: 01/09/18
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Develop and get approved site plans at Burnley-Moran, Johnson, Venable, Jackson-Via, and Walker. Greenbrier was exempted by NDS and one unit is installed and operational with another to follow this week. Site plans are scheduled to be completed by April and CCS is to advise by 5/1/19 if, and where, any additional units may need to be installed.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: CCS Realignment Planning and Design
Description: Planning in design for a project to support realignment of grade transitions at the elementary and middle school levels.
Location: Multiple
Budget: 3000000
Start Date: 09/09/19
Project Manager: Michael Goddard
Status: Archived CIP
Comments: RFP for A&E services is on the street, due back January 30.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Central Office 2, IT Air Conditioning
Description: Replacment of existing AC unit and installation of 2nd. unit to provide redundancy.
Location: Charlottesville High School
Budget: 60000
Start Date: 07/01/19
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: Lawrence Perry and Associated have begun the engineering process, anticipate work to be done this winter.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Central Office II, IT Redundant AC Upgrade
Description: Replacement of existing AC with a redundant system.
Location: 1400 Melbourne Road
Budget: 60000
Start Date: 03/02/20
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: Anticipate having 95% plans and specifications on 2/3/20

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: CHS Signage
Description: Replacing and updating signage in CHS main parking area.
Location: Charlottesville High School
Budget: 40000
Start Date: 11/11/19
Project Manager: Michael Goddard
Status: Archived CIP
Comments: Project is in design phase.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: CHS Stadium Fieldhouse Renovation
Description: Renovate fieldhouse building including teamrooms, spectator restrooms and concessions area, to include new roof, gutters and concessions overhang.
Location: 1400 Melbourne Road
Budget:
Start Date: 11/11/11
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Project is complete.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: CHS Track
Description: Redevelopment of the existing track at CHS from a 6-lane track to an 8-lane VHSL-compliant track and all new field equipment. The design project includes a new restroom/storage building, bleacher seating, ADA-compliant parking, and site lighting.
Location: 1400 Melbourne Road
Budget:
Start Date: 06/06/18
Project Manager: Mike Goddard
Status: Archived CIP
Comments: Work is complete with the exception of a few punch items on the irrigation system.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Clark Elementary Classroom Modernization
Description: Modernize classrooms with a focus on 4th grade spaces. All classrooms to receive furniture and technology upgrades, as well as paint
Location: 1000 Belmont AVE
Budget:
Start Date: 11/11/11
Project Manager: Michael Goddard
Status: Archived CIP
Comments: Project is complete aside from addressing a couple minor issues.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Clark Fencing
Description: Replacing old chain link fencing with new.
Location: Clark Elementary
Budget: 20000
Start Date: 01/02/20
Project Manager: Susan Dyer
Status: Archived CIP
Comments: Project should take about two days

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Clark Fencing
Description: Replacing old chain link fencing with new.
Location: Clark Elementary
Budget: 20000
Start Date: 09/09/19
Project Manager: Susan Dyer
Status: Archived CIP
Comments: Project should take about two days

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Clark Perimeter Heat Boiler Replacement
Description: Replacement of Clark Elementary perimeter boiler.
Location: 1000 Belmont Ave Charlottesville, Va. 22902
Budget: 40000
Start Date: 06/10/19
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: RFQ in progress. Work to be completed over Christmas Break.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Clark Restroom Renovation
Description: Multiple occupancy restrooms throughout school will be updated and ADA clearances adjusted.
Location: Clark Elementary
Budget: 350000
Start Date: 06/08/20
Project Manager: Michael Goddard
Status: Archived CIP
Comments: Design expected at end of January for review.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Greenbrier Elementary Interior Lighting
Description: Poorly performing interior lighting to be upgraded.
Location: Greenbrier
Budget: 300000
Start Date: 06/10/19
Project Manager: Mike Goddard
Status: Archived CIP
Comments: Interior lights to be upgraded to LED fixtures, Natural light to be added potentially as second phase.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Greenbrier Lighting
Description: Replacing underperforming lighting fixtures with brighter, more efficient LED fixtures
Location: Greenbrier Elementary
Budget: 30000
Start Date: 06/17/19
Project Manager: NA
Status: Archived CIP
Comments: Work will begin upon delivery of new lights (expected in next two weeks) and should have duration of about one week.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Jackson Via Interior Graphics
Description: Graphics package as conclusion to Jackson Via Modernization. Wayfinding and classroom identification signage.
Location: Jackson Via Elementary
Budget: 40000
Start Date: 10/21/19
Project Manager: Michael Goddard
Status: Archived CIP
Comments: Project complete pending punch list.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Jackson Via Modernization
Description: Modernization of learning spaces at Jackson Via, with specific focus on downstairs spaces.
Location: 508 Harris Rd.
Budget: 1000000
Start Date: 11/05/18
Project Manager: Michael Goddard
Status: Archived CIP
Comments: Project includes new furniture and technology throughout the school, as well as a more intensive modernization of the downstairs classrooms and commons. VMDO Architects has completed construction documentation and the project was bid and awarded to Daniel & Co. Project is complete, with the exception of interior graphics.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Johnson Elementary BAS Replacement
Description: Replacement of antiquated Building Automation System from the 1970s
Location: 1645 Cherry Ave
Budget: 125000
Start Date: 06/10/19
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: Work is complete.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Performing Arts Center Chiller Replacement
Description: Replacement of 19 year old Chiller.
Location: 1400 Melbourne Road
Budget: 220000
Start Date: 04/13/20
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: Revised drawings just completed, work on IFB has begun.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Venable BAS Replacement
Description: Replacement of 30 year old NOVAR building automation system
Location: 406 14th. Street NW
Budget: 150000
Start Date: 06/08/20
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: Working on getting engineering firm on board as well as IFB documents.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Walker Auditorium, Gym & Cafeteria RTU replacement (Units 1, 4 & 5)
Description: Replacement of 18 year old R-22 rooftop units serving the Auditorium, Gym and Cafeteria.
Location: 1564 Dairy Road
Budget: 300000
Start Date: 06/08/20
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: As of this year R22 refrigerant cannot be produced or imported, many of our RTU use R-22, we are making a push to replace these units as soon as possible. As the units are replaced we are recovering the refrigerant to use in our remaining systems. Engineer anticipates getting us the drawings this week, working on IFB documents.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Walker Rooftop Heat Pump Replacements (Units 2&3)
Description: Replacement of RHP-2 Auditorium and RHP-3 Gym. 19 year old R-22 HVAC units.
Location: 1564 Dairy Road
Budget: 185000
Start Date: 08/05/19
Project Manager: Facilities Maintenance
Status: Archived CIP
Comments: Work performed over Christmas break and is complete, equipment is operational, punch list items remain.

Project Type: FACILITY CONSTRUCTION/RENOVATION-SCHOOLS
Project Name: Walker Upper Elementary North Atrium Enclosure
Description: Enclose outside area between main school building and auxilliary classroom units with a permanent roof and storefront.
Location: 1564 Dairy Road
Budget:
Start Date: 11/11/11
Project Manager: Scott Hendrix
Status: Archived CIP
Comments: Project is complete.

Project Type: GAS MAIN INSTALLATION
Project Name: 1) Lochlyn Hills Gas Main Installation
Description: Main has been installed and installing services as requested.
Location: Lochlyn Hills Subdivision
Budget: 50000
Start Date: 11/01/18
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: GAS MAIN INSTALLATION
Project Name: 2) Paynes Mill Gas Main Installation
Description: Installing natural gas service to the Paynes Mill subdivision.
Location: Paynes Mill
Budget: 50000
Start Date: 01/01/20
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: GAS MAIN INSTALLATION
Project Name: 3) Belmont Point Gas Main Installation
Description: Installing natural gas service for the Belmont Point subdivision.
Location: Belmont Point
Budget: 50000
Start Date: 01/01/20
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: GAS MAIN INSTALLATION
Project Name: Abnormal Operating Conditions Contract
Description: Project to correct any abnormal operating conditions on the natural gas system. No work will be performed 11/1/2021-3/31/2022.
Location: Johnson Village
Budget: 1775875
Start Date: 06/01/21
Project Manager: Christian Chirico
Status: Archived CIP
Comments:

Project Type: GAS MAIN INSTALLATION
Project Name: Ivy Corridor Gas Main Relocation
Description: Relocation of 8" steel natural gas main to accommodate the UVA's Ivy Corridor project.
Location: Emmet Street
Budget: 300000
Start Date: 06/28/21
Project Manager: Christian Chirico
Status: Archived CIP
Comments:

Project Type: GAS MAIN INSTALLATION
Project Name: New Business Installation Contract
Description: A contractor is used to supplement City crews in the installation of gas mains and services, as needed.
Location: Entire Service Area
Budget: 771140
Start Date: 11/19/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: GAS MAIN INSTALLATION
Project Name: Paynes Mill Gas Installation
Description: Installation of new 2 inch gas main for the Paynes Mill Subdivision construction.
Location: Paynes Mill Subdivision
Budget: 20000
Start Date: 07/01/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: NEIGHBORHOOD DRAINAGE
Project Name: 1319 Kenwood Lane
Description: New curb and driveway entrance
Location: 1319 Kenwood Ln.
Budget: 12,000
Start Date: 11/11/21
Project Manager: Chris Sibold
Status: Archived CIP
Comments: Contruction in October 2018

Project Type: NEIGHBORHOOD DRAINAGE
Project Name: 1617 St. Annes
Description: New curb and gutter and driveway entrance along property frontage.
Location: 1617 St. Annes Rd
Budget: 21000
Start Date: 04/08/19
Project Manager: Chris Sibold
Status: Archived CIP
Comments:

Project Type: NEIGHBORHOOD DRAINAGE
Project Name: NDP Ochs
Description: New Curb and Gutter
Location: 6117 St Anne's Rd
Budget: 21000
Start Date: 04/01/19
Project Manager: Chris Sibold
Status: Archived CIP
Comments: Project complete.

Project Type: PARK RENOVATIONS
Project Name: 8th Street Park Creation
Description: Construct new park on city owned land near Westhaven Community Center. City has purchased railroad property and is in design phase. Project is funded with CDBG funds through Neighborhood Development Services. Construction spring 2020
Location: 8th, Page and Albemarle
Budget: 350000
Start Date: 09/01/18
Project Manager: Missy Creasy
Status: Archived CIP
Comments:

Project Type: PARK RENOVATIONS
Project Name: Greenleaf Park Playground Replacement
Description: Replace playground structure at Greenleaf
Location: Greenleaf Park
Budget: 0
Start Date: 01/06/20
Project Manager: Danny McClung
Status: Archived CIP
Comments: Public Input meeting was held in November

Project Type: PARK RENOVATIONS
Project Name: Maplewood cemetery wall repairs
Description: Repair to brick wall sections which have failed, and replacement of individual bricks which have degraded.
Location: Lexington Avenue
Budget: 5000
Start Date: 07/01/17
Project Manager: Danny McClung
Status: Archived CIP
Comments: Phase 1 interior wall repairs compete. Phase 2 repointing and minor repair of exterior wall section from Maple and 8th to cemetery entrance in progress. 30% complete.

Project Type: PARK RENOVATIONS
Project Name: Oakwood cemetery wall repair
Description: Repair failing sections of perimeter wall along south First street
Location: South First Street
Budget: 5000
Start Date: 07/01/17
Project Manager: Danny McClung
Status: Archived CIP
Comments: Contract awarded, work in progress

Project Type: PARK RENOVATIONS
Project Name: Pen Park Tennis Court Renovation
Description: Renovation and/or replacement of 8 tennis courts and fencing surrounds
Location: Pen Park
Budget: 260000
Start Date: 07/15/17
Project Manager: Danny McClung
Status: Archived CIP
Comments: Contract awarded for renovation of all 8 courts and ADA parking and access. Project is complete

Project Type: PARK RENOVATIONS
Project Name: Skate Park
Description: Construct new concrete skate park and associated restrooms and staff areas
Location: East McIntire Park
Budget: 1500000
Start Date: 05/01/18
Project Manager: Vic Garber
Status: Archived CIP
Comments: Skate area is complete. Other items to be completed include fence, connecting trails, court area. Opening expected in March 2019. Fundraising for lighting underway.

Project Type: PARK RENOVATIONS
Project Name: Washington Park Basketball Court Renovation
Description: Resurface courts and install new backboards and nets. Bid is being negotiated.
Location: Washington Park
Budget: 0
Start Date: 07/01/19
Project Manager: Danny McClung
Status: Archived CIP
Comments:

Project Type: SANITARY SEWER UTILITY IMPROVEMENT
Project Name: 1) FY21 Sanitary Sewer Rehabilitation Project
Description: Sanitary Sewer Evaluation Survey (SSES) focused on Basin 13 (area between 5th St SW and Cherry Ave).
Location: City-wide
Budget: 4592393
Start Date: 11/01/21
Project Manager: Jason McIlwee
Status: Archived CIP
Comments:

Project Type: SANITARY SEWER UTILITY IMPROVEMENT
Project Name: 2) Kenwood Lane Sanitary Sewer Replacement
Description: Replacement of 600' of sanitary sewer. New material is 8" SDR-26 PVC and is replacing 8" terra cotta.
Location: Kenwood Lane
Budget: 150000
Start Date: 02/08/21
Project Manager: Jason McIlwee
Status: Archived CIP
Comments:

Project Type: SANITARY SEWER UTILITY IMPROVEMENT
Project Name: Basin 13 Sanitary Sewer Rehabilitation
Description: System-wide sanitary sewer rehabilitation including point repairs, complete replacements, manhole rehabilitation, and cured-in-place-pipe (CIPP) lining.
Location: Citywide
Budget: 1000000
Start Date: 04/12/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: SANITARY SEWER UTILITY IMPROVEMENT
Project Name: Basin 21 Sanitary Sewer Rehabilitation
Description: System-wide sanitary sewer rehabilitation including point repairs, complete replacements, manhole rehabilitation, and cured-in-place-pipe (CIPP) lining.
Location: Citywide
Budget: 1900000
Start Date: 04/12/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: SANITARY SEWER UTILITY IMPROVEMENT
Project Name: Cameron Lane
Description: Replacing 440' of sanitary sewer main with 8" SDR 26 PVC in order to remediate a storm sewer crossing that is on reverse slope and failing. In order to replace the storm sewer with an appropriately sized pipe to provide capacity on proper grade, the gas and water mains will have to be relocated, as well.
Location: Cameron Lane
Budget: 150000
Start Date: 10/14/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: SANITARY SEWER UTILITY IMPROVEMENT
Project Name: Sanitary Rehabilitation Contract
Description: Repairing and CIPP Lining numerous pipes finishing out basins 12 and 21 and moving to Basin 7 (McIntire Rd Area)
Location: Basin 12 (Belmont/Carlton) and Basin 21 (Ridge St/Belmont Area) Basin 7 (McIntire Rd)
Budget: CIP Fund
Start Date: 04/01/18
Project Manager: Jason McIlwee
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: 8th St NW
Description: Sidewalk Improvements
Location: Preston Ave to Anderson St
Budget: 28998.23
Start Date: 06/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Albermarle St
Description: Sidewalk Improvements
Location: Preston Ave to 8th St NW
Budget: 20710.00
Start Date: 05/23/19
Project Manager: Marty Silman
Status: Archived CIP
Comments: NONE

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Albermarle St
Description: Sidewalk Improvements
Location: Preston Ave to 8th St NW
Budget: 20710.00
Start Date: 05/23/19
Project Manager: Marty Silman
Status: Archived CIP
Comments: NONE

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Albermarle St
Description: Sidewalk Improvements
Location: Preston Ave to 8th St NW
Budget: 20710.00
Start Date: 05/23/19
Project Manager: Marty Silman
Status: Archived CIP
Comments: NONE

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Carrollton Terrace Sidewalk Improvement
Description: Sidewalk Improvement
Location: JPA to Dead End
Budget: 7953
Start Date: 04/11/19
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Clark Ct. Sidewalk Improvement
Description: Sidewalk Improvement
Location: Maury Ave. to Dead End
Budget: 0
Start Date: 09/10/18
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Cutler Ln. Sidewalk Improvements
Description: Sidewalk improvement
Location: Wilder Dr. to Rio Rd.
Budget: 18678
Start Date: 03/07/19
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Cutler Ln. Sidewalk Improvements
Description: Sidewalk improvement
Location: Wilder Dr. to Rio Rd.
Budget: 18678
Start Date: 03/07/19
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Cutler Ln. Sidewalk Improvements
Description: Sidewalk improvement
Location: Wilder Dr. to Rio Rd.
Budget: 18678
Start Date: 03/07/19
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Cutler Ln. Sidewalk Improvements
Description: Sidewalk improvement
Location: Wilder Dr. to Rio Rd.
Budget: 18678
Start Date: 03/07/19
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: HARMON ST
Description: SIDEWALK IMPROVEMENTS
Location: STADIUM RD TO JPA
Budget: 103159
Start Date: 05/23/19
Project Manager: MARTY SILMAN
Status: Archived CIP
Comments: NONE

Project Type: SIDEWALK HAZARD REPAIR
Project Name: HINTON AVE
Description: SIDEWALK IMPROVEMENTS
Location: AVON ST TO MONTICELLO RD
Budget: 36695.00
Start Date: 05/23/19
Project Manager: MARTY SILMAN
Status: Archived CIP
Comments: NONE

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Keystone Pl
Description: SIDEWALK IMPROVEMENTS
Location: LINDEN ST TO CUL-DE-SAC
Budget: 30397
Start Date: 07/15/19
Project Manager: MARTY SILMAN
Status: Archived CIP
Comments: NONE

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Lewis Mountain Sidewalk Improvements
Description: Sidewalk improvement
Location: Alderman rd. to Emmet St.
Budget: 0
Start Date: 10/01/18
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Marshall St.
Description: Sidewalk Improvement
Location: Watson Ave. to Dead End
Budget: 54174.25
Start Date: 05/23/19
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Monticello Avenue Sidewalk Improvements
Description: Sidewalk improvements
Location: Druid Ave. to City Limits
Budget: 14000
Start Date: 05/06/19
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Smith St
Description: Sidewalk Improvements
Location: River Rd to West to Dead End
Budget: 17049
Start Date: 07/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Smith St
Description: Sidewalk Improvements
Location: River Rd to West to Dead End
Budget: 17049
Start Date: 07/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Smith St
Description: Sidewalk Improvements
Location: River Rd to West to Dead End
Budget: 17049
Start Date: 07/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Smith St
Description: Sidewalk Improvements
Location: River Rd to West to Dead End
Budget: 17049
Start Date: 07/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Smith St
Description: Sidewalk Improvements
Location: River Rd to West to Dead End
Budget: 17049
Start Date: 07/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: St Clair Ave
Description: Sidewalk Improvements
Location: ST Clair Ave
Budget: 0
Start Date: 07/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: St George Ave
Description: Sidewalk Improvements
Location: St George Ave
Budget: 0
Start Date: 07/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: St James Circle
Description: Sidewalk Improvements
Location: Mowbray Pl to Dead End
Budget: 6505.67
Start Date: 07/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Trailridge Sidewalk Improvements
Description: Sidewalk improvements along Trailridge from Shamrock to Highland.
Location: Trailridge
Budget: 50000
Start Date: 01/21/19
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Trailridge Sidewalk Improvements
Description: Sidewalk improvements along Trailridge from Shamrock to Highland
Location: Trailridge Rd.
Budget: 50000
Start Date: 01/21/19
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Trailridge Sidewalk Repairs
Description: Repairs and ADA upgrades along Trailridge from Shamrock to Highland.
Location: Trailridge Rd.
Budget: 50000
Start Date: 01/21/19
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Valley View Circle
Description: Sidewalk Improvements
Location: Hazel St to Dead End
Budget: 25024.77
Start Date: 07/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK HAZARD REPAIR
Project Name: Ward Ave
Description: Sidewalk improvements
Location: Hazel St to Grace St
Budget: 0
Start Date: 07/01/19
Project Manager: Public Works
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: 8th Street NW
Description: Sidewalk improvements
Location: 8th Street NW
Budget: 27111
Start Date: 06/10/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: ADA Ramps
Description: ADA Ramp Installation
Location: Carter Ln
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Ramp work performed on streets scheduled for paving (meets federal requirement for altered streets)

Project Type: SIDEWALK IMPROVEMENT
Project Name: ADA Ramps
Description: ADA Ramp Installation
Location: University Ave from Rugby Rd to Emmet St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: ADA Ramps
Description: ADA Ramp Installation
Location: Ivy Road
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Ramp work performed on streets scheduled for paving (meets federal requirement for altered streets)

Project Type: SIDEWALK IMPROVEMENT
Project Name: ADA Ramps
Description: ADA Ramp Installation
Location: Wertland St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Ramp work performed on streets scheduled for paving (meets federal requirement for altered streets)

Project Type: SIDEWALK IMPROVEMENT
Project Name: ADA Ramps
Description: ADA Ramp Installation
Location: 14th St NW
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Ramp work performed on streets scheduled for paving (meets federal requirement for altered streets)

Project Type: SIDEWALK IMPROVEMENT
Project Name: ADA Ramps
Description: ADA Ramp Installation
Location: E Jefferson St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Ramp work performed on streets scheduled for paving (meets federal requirement for altered streets)

Project Type: SIDEWALK IMPROVEMENT
Project Name: ADA Ramps
Description: ADA Ramp Installation
Location: Park St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Ramp work performed on streets scheduled for paving (meets federal requirement for altered streets)

Project Type: SIDEWALK IMPROVEMENT
Project Name: ADA Ramps
Description: ADA Ramp Installation
Location: Baker St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Ramp work performed on streets scheduled for paving (meets federal requirement for altered streets)

Project Type: SIDEWALK IMPROVEMENT
Project Name: ADA Ramps
Description: ADA Ramp Installation
Location: Carter Ln
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Ramp work performed on streets scheduled for paving (meets federal requirement for altered streets)

Project Type: SIDEWALK IMPROVEMENT
Project Name: Albermarle Street
Description: Sidewalk improvements
Location: Albermarle Street
Budget: 30457
Start Date: 07/29/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Carrollton Terrace
Description: Sidewalk improvements
Location: Carrollton Terrace
Budget: 7953
Start Date: 04/15/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Cutler Lane
Description: Sidewalk upgrades
Location: Cutler Lane
Budget: 18678
Start Date: 03/01/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: CUTLER LN
Description: UPGRADE SIDEWALKS
Location: CUTLER LN
Budget: 18678
Start Date: 02/25/19
Project Manager: PUBLIC SERVICE
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: CUTLER LN
Description: UPGRADE SIDEWALKS
Location: CUTLER LN
Budget: 18678
Start Date: 02/25/19
Project Manager: PUBLIC SERVICE
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Cutler Rd
Description: Sidewalk Improvements
Location: Cutler Rd
Budget: 18678
Start Date: 02/25/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Emmet St.
Description: Concrete repairs in advance of repaving efforts in the spring to include upgrade of ADA ramps.
Location: JPA to Ivy
Budget: 131500
Start Date: 03/02/20
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Gillespie Ave.
Description: Concrete repairs along Gillespie Ave between Grace St. and High St. in advance of repaving efforts in spring.
Location: Grace St. to High St.
Budget: 50000
Start Date: 01/13/20
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Harmon Street
Description: Sidewalk improvements
Location: Harmon Street
Budget: 96431
Start Date: 05/13/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Hinton Avenue
Description: Sidewalk improvements
Location: Hinton Avenue
Budget: 36933
Start Date: 09/09/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Keystone Place
Description: Sidewalk improvements
Location: Keystone Place
Budget: 27530
Start Date: 08/05/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Leonard St.
Description: Sidewalk improvements
Location: Leonard St.
Budget: 54934
Start Date: 07/22/19
Project Manager: MARTY SILMAN
Status: Archived CIP
Comments: NONE

Project Type: SIDEWALK IMPROVEMENT
Project Name: Marshall Street
Description: Sidewalk improvements
Location: Marshall Street
Budget: 56959
Start Date: 07/01/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Monticello Ave.
Description: Concrete repairs in advance of repaving efforts in the spring to include upgrade of ADA ramps.
Location: Druid Ave. to Avon St.
Budget: 127800
Start Date: 03/02/20
Project Manager: Marty Silman
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: Carter Ln
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: Thomas Dr
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: 14th Street NW from Grady Ave to Main St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: 1st Street N from W High St to Downtown Mall
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: E Jefferson St from Meade Ave to 2nd Street NW
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: Ivy Road
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: High St from 9th St to Stewart St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: Market St from 9th St to Meade Ave
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: Preston from 10th St to Rugby Ave
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: Ridge/ McIntire NBL from W Main to Preston
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: Altamont at dead end
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: 11th St NW from Page St to West St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: 7th St at City Hall
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: 11th St NE at Corner of High St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair sidewalks
Location: Marshall St at the corner of Davis
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair sidewalks
Location: University Ave from Rugby Rd to Emmet St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Hazard Repairs (Citywide)
Description: Repair Sidewalks
Location: Carter Ln
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Sidewalk Repair
Description: Repair Sidewalks
Location: Elliott Ave from Ridge St to 1st St
Budget: Sidewalk Hazards CIP (SS012)
Start Date:
Project Manager: Steve Lawson
Status: Archived CIP
Comments: Sidewalk Hazard Repair

Project Type: SIDEWALK IMPROVEMENT
Project Name: Smith Street
Description: Sidewalk improvements
Location: Smith Street
Budget: 16927
Start Date: 07/15/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: St. James Circle
Description: Sidewalk improvements
Location: St. James Circle
Budget: 6755
Start Date: 07/22/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: TRAILRIDGE RD
Description: UPGRADE SIDEWALKS
Location: TRAILRIDGE RD
Budget: 101816
Start Date: 02/11/19
Project Manager: PUBLIC SERVICE
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: TRAILRIDGE RD
Description: UPGRADE SIDEWALKS
Location: TRAILRIDGE RD
Budget: 101816
Start Date: 02/11/19
Project Manager: PUBLIC SERVICE
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: TRAILRIDGE RD
Description: UPGRADE SIDEWALKS
Location: TRAILRIDGE RD
Budget: 101816
Start Date: 02/11/19
Project Manager: PUBLIC SERVICE
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: TRAILRIDGE RD
Description: UPGRADE SIDEWALKS
Location: TRAILRIDGE RD
Budget: 101816
Start Date: 02/11/19
Project Manager: PUBLIC SERVICE
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: TRAILRIDGE RD
Description: UPGRADE SIDEWALKS
Location: TRAILRIDGE RD
Budget: 101816
Start Date: 02/11/19
Project Manager: PUBLIC SERVICE
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Trailridge Road
Description: Sidewalk upgrades
Location: Trailridge Road
Budget: 101816
Start Date: 02/18/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Valley View Circle
Description: Sidewalk improvements
Location: Valley View Circle
Budget: 25120
Start Date: 07/29/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: SIDEWALK IMPROVEMENT
Project Name: Washington Avenue
Description: Sidewalk improvements
Location: Washington Avenue
Budget: 29340
Start Date: 05/01/19
Project Manager: Public Service
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 1.) Water Resources Master Plan: CIP 1 Water Quality
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget:
Start Date: 11/11/11
Project Manager: Melissa Stephens
Status: Archived CIP
Comments:

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Stormwater Conveyance System Rehabilitation Program
Description: The work encompasses the rehabilitation, replacement, and repair of VC and CMP pipes and associated structures located in the City right of way and on City-owned parcels. The City has utilized the Rehabilitation Program contractors to rehabilitate storm conveyance infrastructure, both under easement to the City and privately owned, on a limited number of private parcels to address deteriorating stormwater infrastructure and drainage issues.
Location: Citywide
Budget: 1099997
Start Date: 10/15/20
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Efforts are primarily focused on the Fry Springs and Belmont Neighborhood.

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STORMWATER UTILITY IMPROVEMENT
Project Name: 2.) Water Resources Master Plan: CIP 2 Drainage Improvement
Description: Water Resources Master Planning to identify and prioritize drainage and water quality projects throughout the City.
Location: Citywide
Budget: 0
Start Date: 10/14/19
Project Manager: Jason McIlwee
Status: Archived CIP
Comments: Projects under construction include: Edgewood Lane to Wayside Place pipe replacement Kenwood Lane pipe replacement Cedar Hill pipe replacement

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: 4 parking space closures
Location:
Budget:
Start Date: 08/01/18
Project Manager: BJ Pendleton
Status: Archived Closure
Comments: August 1,4-5,10-11,17-18,24-26,31

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: 7 parking space closures
Location:
Budget:
Start Date: 08/02/18
Project Manager: Robert Benjamin
Status: Archived Closure
Comments: August 2-9,17-19

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: 2 parking spots
Location:
Budget:
Start Date: 08/08/18
Project Manager: Joe Rice
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: event parking
Location:
Budget:
Start Date: 09/07/18
Project Manager: Teri Brandon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: The Southern Event Request
Location:
Budget:
Start Date: 09/05/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: September 5-14,18-19,21-22,25-29

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Construction truck parking space closure
Location:
Budget:
Start Date: 09/17/18
Project Manager: Matther Arey
Status: Archived Closure
Comments: Monday - Thursday

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Sequential lane closures for top of deck evaluation
Location:
Budget:
Start Date: 09/20/18
Project Manager: Tom Vogt
Status: Archived Closure
Comments: date change

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: parking closure for dumpster
Location:
Budget:
Start Date: 09/28/18
Project Manager: Stephen Johnson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Sprint Pavilion Event parking closures
Location: City Hall Lot
Budget:
Start Date: 10/13/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments: October 13

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Sprint Pavilion Event parking closures
Location: City Hall Annex Lot
Budget:
Start Date: 10/13/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments: October 13

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Sprint Pavilion Event parking closures
Location:
Budget:
Start Date: 10/05/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments: October 5-7, 14,18

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Sprint Pavilion Event parking closures
Location:
Budget:
Start Date: 10/05/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments: October 5-7,14,18

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Trailer parking space closure
Location:
Budget:
Start Date: 10/06/18
Project Manager: Mike Baldouf
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: 2 parking spot closures. Dig test pit for gas, fire, storm drain
Location:
Budget:
Start Date: 10/08/18
Project Manager: Quinn Durnien
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Election day parking, 7 parking space closure
Location: Parking Lot between City Hall Annex and Key Rec Center
Budget:
Start Date: 11/06/18
Project Manager: Joyce McKenney - Asst Registrar
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Sidewalk closure on corner of Gordon Ave and Ackley Lane for installation of handicap ramp
Location:
Budget:
Start Date: 10/23/18
Project Manager: Rob Brugh
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: 1 parking space closure for moving truck
Location: 300 block
Budget:
Start Date: 10/25/18
Project Manager: Jehu Martin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: 14 parking spaces in city hall lot closure
Location:
Budget:
Start Date: 10/27/18
Project Manager: Rosanna Bencoach
Status: Archived Closure
Comments: October 27

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Absentee Voting. 14 parking space closures
Location:
Budget:
Start Date: 11/03/18
Project Manager: Rosanna Bencoach
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Parking space closure for Ivy Open Cut project
Location:
Budget:
Start Date: 10/23/18
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name:
Description: Dumpster parking spot closure
Location:
Budget:
Start Date: 11/02/18
Project Manager: Deren Bader- Owner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (1049 - 1089) E Water St - Shelter assoc.
Description: Gutter downspout repairs
Location:
Budget:
Start Date: 09/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (1512 - 1510) Antoinette Ave - Public Works
Description: Sidewalk restoration.
Location:
Budget:
Start Date: 09/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (2303 - 2307) Jefferson Park Ave - Public Works
Description:
Location: (2303 - 2307) Westmost sidewalk
Budget:
Start Date: 08/21/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (2303 2307) Jefferson Park Ave x Stribling Ave - Public Works
Description: Temporary ADA through-way created by PW for safety. Residence stone retaining wall structural integrity diminished due to erosion.
Location: Westmost sidewalk along JPA between addresses 2303 - 2307
Budget:
Start Date: 08/01/23
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (2312 - 2316) Fontaine Ave
Description: Temporary Sidewalk repair.
Location: Southernmost sidewalk between Montpelier St & Lewis St
Budget:
Start Date: 09/22/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (250 - 403) Emmet St S - Hourigan Co.
Description: Bridge railing welding.
Location: Emmet Street South between Ivy St & JPA
Budget:
Start Date: 09/28/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (400-402) E Market St - IOOF
Description: Painting renovations.
Location: E Market St x 4th St NE
Budget:
Start Date: 09/10/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (400-402) E Market St - IOOF
Description: Painting renovations.
Location: E Market St x 4th St NE
Budget:
Start Date: 09/10/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (400-402) E Market St - IOOF
Description: Painting renovations.
Location: E Market St x 4th St NE
Budget:
Start Date: 09/10/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (401-407) E Main St - Downtown Mall - York
Description: Awning Installation.
Location:
Budget:
Start Date: 10/02/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (404 - 406) 13th St NE - Linco
Description: Sidewalk removal/replacement.
Location:
Budget:
Start Date: 12/18/23
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (418-500) Hanover St - Rocktown
Description: Street Cut and Sewer extension
Location:
Budget:
Start Date: 09/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: (706-708) Shamrock Rd - Tri-State
Description: Manhole rehab.
Location:
Budget:
Start Date: 08/30/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 0 Court Sq - RB Painting
Description: Painting Renovations
Location: Southernmost sidewalk of East Jefferson St between 7th St & Park St
Budget:
Start Date: 11/20/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1 St S
Description: POD
Location: 1st St S 700 Block
Budget:
Start Date: 07/13/19
Project Manager: Kelsey Pukelis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1/2 Dice St
Description:
Location: 412 1/2 Dice St - Monarch Concrete
Budget:
Start Date: 11/30/20
Project Manager: Mike Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10 1/2 St
Description:
Location: Corner od West St - BGF
Budget:
Start Date: 04/09/21
Project Manager: Kathy Garstang
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 100 Meadowbrook Ct - Linco
Description: Water Main Replacement. Road Closed - Local Thru traffic Only.
Location:
Budget:
Start Date: 11/27/23
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1000 E Market St - WG Carpentry
Description: Facade restoration with scaffolding.
Location:
Budget:
Start Date: 09/06/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 101 E Jefferson St
Description:
Location: 101 E Jefferson St - First United Methodist
Budget:
Start Date: 07/15/20
Project Manager: Gary Heaton
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 101 E Market Street
Description:
Location: Sidewalk around Market Street Park on North, East and West sides
Budget:
Start Date: 07/10/21
Project Manager: City of Charlottesville
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 101, 212, 414 E. Main St - Downtown Mall - Virginia Pacific
Description: Painting Renovations
Location: 101, 212, 414
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1013 Cherry Ave - Building Goodness Foundation
Description: Construction Demo
Location:
Budget:
Start Date: 03/29/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1016 Long St x St. Clair - Tri-State
Description: Line Tap. .5 of EB Lane closed.
Location:
Budget:
Start Date: 03/25/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1038 St Charles Ave - Tri-State
Description: Directional Drill of Sanitary Line into property from street.
Location:
Budget:
Start Date: 10/23/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 106 10th St NW - Public Utilities
Description: Gas line x Storm drain
Location:
Budget:
Start Date: 11/08/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 106 10th St NW - Public Utilities
Description: Gas line repair
Location: Eastmost sidewalk and NB traffic lane
Budget:
Start Date: 12/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 109 2nd St SE - Virginia Pacific
Description: Hydraulic Lift storage for facade restoration.
Location: Alleyway - Downtown Mall
Budget:
Start Date: 08/21/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th - Hourigan
Description:
Location:
Budget:
Start Date: 01/01/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th - Hourigan
Description: Sidewalk Closure
Location: 920 E. High St
Budget:
Start Date: 10/01/22
Project Manager: Hourigan
Status: Archived Closure
Comments: N/A

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St - Piedmont Conc.
Description:
Location:
Budget:
Start Date: 02/09/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St - Scotts Backhoe
Description:
Location: 10th Street between Werland and West Main
Budget:
Start Date: 01/18/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE
Description:
Location:
Budget:
Start Date: 06/29/21
Project Manager: Robin Moriarty
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE
Description:
Location: Between E High and Little High - FCC
Budget:
Start Date: 12/05/21
Project Manager: Robin Moriarty
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 100, 210, 316
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 100, 210, 316
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 100, 210, 316
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE - Digs Inc.
Description: Water Line installation
Location: 308 10th St NE, Little High St x, between E High St and E Jefferson St
Budget:
Start Date: 08/10/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE - Digs Inc.
Description: Sidewalk removal and creation.
Location: Eastmost sidewalk between E Jefferson St & Little High St at or around 308
Budget:
Start Date: 11/20/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE - Falcouner
Description: Utilities/Sidewalk restoration. Traffic was not advised of project to take place.
Location: West sidewalk of 10th St NE between E Jefferson St & E High St
Budget:
Start Date: 09/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE - Richardson Weyland
Description: Left turn lane closure. Saw cutting and reveals.
Location:
Budget:
Start Date: 10/23/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE - S.L. Williamson
Description: Correct asphalt reveal along Sentara's 10th St Parking Garage Entrance.
Location:
Budget:
Start Date: 10/20/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE - Scott's Backhoe
Description: Advance warning signs, Flagging, and One Lane Road, channelizing devices moving cars around the work activity area.
Location: 10th x Little High
Budget:
Start Date: 07/31/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NE between E High St & Little High St-Lumos
Description: This is a sidewalk closure not in excess of 48 hours
Location: 10th St NE between E High St & Little High St
Budget:
Start Date: 04/25/22
Project Manager: Dean Scheidt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description:
Location: NB Lane on 10th St NW - KBS
Budget:
Start Date: 12/03/21
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description: Road closed at night with a detour to West St and Grady Ave
Location: Between West and Grady Ave - SPDG
Budget:
Start Date: 08/10/21
Project Manager: Joshua Batman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description: This is a sidewalk closure not in excess of 48 hours.
Location: 10th St NW at Grady Ave - Momentum
Budget:
Start Date: 04/08/21
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description:
Location: Between Grady Ave and West St - Momentum
Budget:
Start Date: 07/22/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description: This closure is not in excess of 48 hours.
Location: South of Grady Ave intersection - MVT
Budget:
Start Date: 07/14/20
Project Manager: Trevor Keller
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description:
Location: East sidewalk between Grady Ave and West St - KBS
Budget:
Start Date: 06/02/20
Project Manager: Jackson Spivey
Status: Archived Closure
Comments: 121 SW Closure

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description:
Location: Between Grady Ave and West St - KBS
Budget:
Start Date: 10/19/20
Project Manager: Jackson Spivey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description:
Location: 202 10th St NW - Linco
Budget:
Start Date: 11/09/20
Project Manager: Linco
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description:
Location: 10th St NW at Grady Ave - Momentum
Budget:
Start Date: 08/24/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description:
Location: 10th St NW at Grady Ave - Momentum
Budget:
Start Date: 08/07/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description: Pulling primary cable through conduit.
Location: 416 10th St NW - Dominion
Budget:
Start Date: 10/28/19
Project Manager: Ann Knight
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description:
Location: Between West St and Grady Ave - Dominion
Budget:
Start Date: 11/13/19
Project Manager: Ann Marie Knight
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description:
Location: 10th St NW - Momentum
Budget:
Start Date: 02/18/20
Project Manager: Mark Wagner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description:
Location: Between West St and Grady Ave - Momentum
Budget:
Start Date: 02/29/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description: Street, sidewalk, and parking closure. The southbound lane will be closed with flaggers stationed at Grady Ave and West St.
Location: Between West St and Grady Ave - Stony Point
Budget:
Start Date: 04/16/20
Project Manager: Joshua Batman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description: Repairing concrete entrance. Lane closure on 10th St NW for about one hour some time between 11:00am and 1:00pm.
Location: 114 10th St NW Pelotin Restaurant
Budget:
Start Date: 07/24/19
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description: Installation of storm drain and sidewalk.
Location: Between Grady Ave and West St
Budget:
Start Date: 10/21/19
Project Manager: Mark Wagner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description: Night work, road closure from 8pm - 6am. Detour will direct drivers from Main St to 14th St NW and onto Grady Ave. The only block closed off during the listed hours is between West St and Grady Ave.
Location: Between Grady Ave and West St
Budget:
Start Date: 09/09/19
Project Manager: Mark Warner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St NW
Description: Sewer and water line repair. This are will have a flagging operation while one lane is closed. The area will be closed on 8/15, 8/16, and 8/19.
Location: 10th St NW between Wertland St and W Main St
Budget:
Start Date: 08/15/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St SW
Description: This is a street and sidewalk closure not in excess of 48 hours. The work will be conducted at night between the hours of 8pm and 6am, October 1-2. Grady Ave and Preston Ave will be the alternate routes.
Location: Between Grady Ave and West St
Budget:
Start Date: 10/01/19
Project Manager: Mark Wagner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St SW
Description:
Location: 10th St SW at West St - Momentum
Budget:
Start Date: 02/18/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th St SW
Description: Sewer Line, Water tap install.
Location: Full street between Grove St and King St
Budget:
Start Date: 08/23/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 10th Street NW - Momentum
Description:
Location: 10th Street NW Northbound
Budget:
Start Date: 05/22/23
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1122 Park St - Van Yahres Tree Co.
Description: Tree/Brush cutting. Lane Merge Taper w/ cones and Advance Warning.
Location:
Budget:
Start Date: 09/16/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1136 E. Market St - Tri-State
Description: Street closure, camera in sewer and removal of Grease buildup
Location:
Budget:
Start Date: 12/15/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 119 Cleveland Ave - PennLine (Dominion)
Description: Tree Trimming for power lines.
Location: Hammond Street (119 Cleveland Ave) to Woodland Dr
Budget:
Start Date: 04/15/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 400 block of 11th
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St NE
Description:
Location: Between E High and Little High - Linco
Budget:
Start Date: 08/24/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St NE
Description: Sidewalk repair.
Location: Ready Kids - MCS
Budget:
Start Date: 09/23/20
Project Manager: Robert Burgh
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St NE
Description:
Location: Between High St and Little High St - Linco
Budget:
Start Date: 07/08/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St NE
Description: 4 day closure between March and June.
Location:
Budget:
Start Date: 03/31/21
Project Manager: Dominion Energy
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St NE
Description:
Location: 319 11th St NE - Scotts Backhoe
Budget:
Start Date: 02/28/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St NE
Description:
Location: 11th St NE - Momentum
Budget:
Start Date: 11/13/19
Project Manager: Bruce Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St NE
Description: Parking spot.
Location: 11th St NE
Budget:
Start Date: 09/25/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St NE
Description: One lane of travel will be closed on 11th St NE between Little High St and E Jefferson St. A flagging operation will be in place.
Location: 319 11th St NE
Budget:
Start Date: 08/15/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St NE
Description: New entrance, storm drain work, and new sidewalk.
Location: 11th St NE
Budget:
Start Date: 08/27/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St NW - Linco
Description: Water main Replacement
Location: 11th St. NW between Rosser Ave E & Grady Ave
Budget:
Start Date: 09/05/23
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St SE
Description: Sidewalk closure. To paint the sidewalk drainage flume plate
Location:
Budget:
Start Date: 10/15/18
Project Manager: Ron Roher - Contract Administrator
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St SW
Description: Street closure with flaggers at night. The dates provided are a window for this closure. Work should be completed within one day when started.
Location: 1106 W Main St at 11th St SW - Lumos
Budget:
Start Date: 10/18/21
Project Manager: Dean Scheidt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th St SW
Description:
Location: 118 11th St SW - City of Charlottesville
Budget:
Start Date: 11/05/20
Project Manager: Roy Nester
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 11th Street NE - ReadyKids
Description:
Location: 406 11th Street NE
Budget:
Start Date: 04/29/23
Project Manager: Bill Barefoot
Status: Archived Closure
Comments: Sidewalks unaffected

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 12 1/2 St NW
Description: Vehicles will be detoured down Wertland St and 13th St NW.
Location: 12 1/2 St NW between W Main St and Wertland St - Spectrum Paint
Budget:
Start Date: 04/15/20
Project Manager: Bill Kennedy
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 12 1/2 St NW
Description:
Location:
Budget:
Start Date: 06/07/21
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1204 W Main St - UVA
Description: Wastewater to storm drain pump.
Location:
Budget:
Start Date: 03/21/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 123 E Main St - Valcourt
Description: Exterior Window Cleaning
Location:
Budget:
Start Date: 04/12/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 123 E Water St
Description:
Location: 123 E Water St - Advanced Plumbing
Budget:
Start Date: 01/06/21
Project Manager: Leslie Napier
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1252 Emmet St N - Scott's
Description: Sidewalk redo.
Location:
Budget:
Start Date: 09/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1252 Emmet St N - Scott's
Description: Sidewalk installation.
Location:
Budget:
Start Date: 09/25/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 12th St NW
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: Between W Main St and Wertland St
Budget:
Start Date: 06/01/20
Project Manager: Tony Casey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 12th St NW
Description: This is a sidewalk closure not in excess of 48 hours. The street and sidewalk closure will only be in effect from 7am to 9am.
Location: Between W Main St and Wertland St - Colonial Webb
Budget:
Start Date: 04/03/20
Project Manager: Tony Casey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 12th St NW- Digs
Description: Water and Sanitary Sewer Lateral install
Location: 403/405 12th St NW
Budget:
Start Date: 05/03/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 12th St NW- Digs
Description:
Location: 403 12th St NW
Budget:
Start Date: 05/24/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 13 St NW
Description: POD
Location: 400 block of 13th St NW
Budget:
Start Date: 07/12/19
Project Manager: Emma Kurtz
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 13.5 ST NW - Lynchburg Co.
Description: Craning material for communications equipment repair.
Location:
Budget:
Start Date: 03/23/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1301 E High St - Public Works
Description: Temporary Lane closure. Paving after Water Line/Sewer Utility Work.
Location:
Budget:
Start Date: 09/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1301 Wertland St - Scotts
Description: Potholing Gas & Water
Location:
Budget:
Start Date: 10/11/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1315 Long St x E High St - Digs
Description: Asphalt Overlay.
Location: Rte. 250 (Long St.)
Budget:
Start Date: 02/13/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1315 Long St x E High St - Digs
Description: Asphalt overlay.
Location: Rte. 250 (Long St.)
Budget:
Start Date: 02/13/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1315 Long St x E High St - Digs
Description: Asphalt Overlay.
Location: Rte. 250 (Long St.)
Budget:
Start Date: 02/13/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1328 Long St (250) x River Rd x E High St - Digs
Description: Water line tie-in.
Location:
Budget:
Start Date: 12/18/23
Project Manager:
Status: Archived Closure
Comments: Postponed from 12/10 to a later date.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1328 Long St (250) x River Rd x E High St - Digs
Description: Water line tie-in.
Location:
Budget:
Start Date: 12/18/23
Project Manager:
Status: Archived Closure
Comments: Postponed from 12/10 to a later date.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1328 Long St (250) x River Rd x E High St - Digs
Description: Water line tie-in.
Location:
Budget:
Start Date: 12/18/23
Project Manager:
Status: Archived Closure
Comments: Postponed from 12/10 to a later date.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 13th St
Description: Parking spot.
Location: 324 13th St
Budget:
Start Date: 09/18/19
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 13th St
Description: Parking spot.
Location: 324 13th St
Budget:
Start Date: 09/18/19
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 13th St NW
Description: Repairs to the Graduate Hotel facade
Location:
Budget:
Start Date: 09/03/18
Project Manager: Adam Goodrich
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 13th St NW
Description: Installing new water meter for City
Location:
Budget:
Start Date: 08/13/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments: Street and parking closure

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 13th St NW
Description: New water meter for city
Location:
Budget:
Start Date: 08/01/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 13th St NW
Description:
Location: 13th St NW - Lumos
Budget:
Start Date: 12/06/21
Project Manager: Jared Morris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1415 University Ave
Description: Replacing rooftop air conditioner units.
Location: 1415 University Ave
Budget:
Start Date: 06/01/19
Project Manager: Christopher Burke
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1419 Cherry Ave - Tri-State
Description: Manhole rehab
Location:
Budget:
Start Date: 10/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1430 E High St - Linco
Description: City of Charlottesville sidewalk project.
Location:
Budget:
Start Date: 11/06/23
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 14th St NW
Description:
Location:
Budget:
Start Date: 08/18/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 14th St NW
Description:
Location: From Wertland St to Sadler St - Linco
Budget:
Start Date: 07/13/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 14th St NW
Description: Flagging operation on 14th St NW near the intersection of Gordon Ave.
Location: 14th St NW at Gordon Ave
Budget:
Start Date: 05/20/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 14th St NW
Description: Water and sewer operation.
Location: 14th St NW between Gordon and Grady
Budget:
Start Date: 06/17/19
Project Manager: Lane Bonner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 14th St NW
Description: New water meter for city. 314 14th St
Location:
Budget:
Start Date: 09/05/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1518 E High St - Scott's
Description: Water line replacement.
Location:
Budget:
Start Date: 08/21/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1521 Cherry Ave - Tri-State
Description: Manhole rehab. Modified TTC 28.2, Lane merging taper, no flaggers needed.
Location:
Budget:
Start Date: 09/13/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1521 Rugby Rd - Staunton Tree
Description: Tree removal by crane Flaggers TTC 23.2
Location:
Budget:
Start Date: 11/06/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 15th St and 14th St
Description: Sanitary sewer work for the city.
Location: 300 block 15th St NW and 14th St NW between Sadler ST and John St
Budget:
Start Date: 05/15/19
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 15th St NW
Description: Parking
Location: 336 15th St NW
Budget:
Start Date: 06/24/19
Project Manager: Jeff Jeffers
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 15th St NW
Description: Water Main Installation. Road Open to Local Traffic Only.
Location: Dead end section of 15th St NW - Linco
Budget:
Start Date: 11/12/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 15th St NW
Description:
Location: 336 15th St NW - Big O Tree
Budget:
Start Date: 12/10/20
Project Manager: John Jeffers
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 15th Street NW
Description: Install new water main
Location: From 14th St NW to Sadler St.
Budget:
Start Date: 06/04/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments: Install new water main

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1618 Gordon Ave - Ace
Description: Emergency Water Line Repair
Location: 1618 Gordon Ave
Budget:
Start Date: 03/18/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1637 Brandywine Dr - Scott's
Description: Sewer Lateral Repair
Location:
Budget:
Start Date: 02/26/24
Project Manager:
Status: Archived Closure
Comments: TTC 23.2 w/ flaggers. Modified for residential.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1637 Brandywine Dr - Scott's Backhoe
Description: Sewer lateral repair
Location:
Budget:
Start Date: 02/26/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 16th St NW
Description:
Location: Between Gordon Ave and Grady Ave - Linco
Budget:
Start Date: 08/02/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 17th St NW
Description: Paving operation.
Location: 17th St NW - SL Williamson
Budget:
Start Date: 10/11/20
Project Manager: Andrew Owens
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 17th St NW
Description:
Location: Between Grady Ave and Virginia Ave - Linco
Budget:
Start Date: 08/14/20
Project Manager: Renee Roberst
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 17th St NW
Description: Moving Trucks
Location:
Budget:
Start Date: 08/14/18
Project Manager: Hannah Hellman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1901 Emmet St - Tri-State
Description: Storm Structure Repair
Location:
Budget:
Start Date: 10/17/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1901 Emmet St - Tri-State
Description: Storm Structure rebuild.
Location: Westmost sidewalk along Emmet St x Hydraulic Rd
Budget:
Start Date: 10/17/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st S
Description: Sanitary CIPP rehab for city
Location:
Budget:
Start Date: 08/28/18
Project Manager: Jonathan Thomas - Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St N
Description: Parking space closure for POD
Location:
Budget:
Start Date: 10/22/18
Project Manager: John Wiley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St N
Description: Sidewalk closure less than 48 hours. Truck in driveway to install insulation (3-5 hours).
Location: 430 1st St N
Budget:
Start Date: 09/19/19
Project Manager: Jon Simpson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St N
Description: Moving van
Location: 400 block of 1st St N
Budget:
Start Date: 09/06/19
Project Manager: Julia Dauer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St N
Description:
Location: Between E High St and Hedge St - Linco
Budget:
Start Date: 12/06/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St N
Description: Painting building.
Location: Between E Market St and Pedestrian Mall
Budget:
Start Date: 09/28/20
Project Manager: Chris Virgilio
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St N - First United Youth Ministry
Description: Rise Against Hunger Service Project
Location:
Budget:
Start Date: 03/16/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St N - Hurt & Proffitt
Description: Geotechnical engineering
Location: 1st St N. between High Street and Hedge Street
Budget:
Start Date: 04/09/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St N - RGM HVAC
Description: HVAC replacement
Location: Between Jefferson & High
Budget:
Start Date: 12/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St NW
Description: 1 parking space closure for moving
Location: 100 block
Budget:
Start Date: 04/25/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St NW
Description: 1 parking space closure for ceremony
Location: 100 block
Budget:
Start Date: 06/01/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St S
Description: The Southern Event Parking Closure
Location: 100 block
Budget:
Start Date: 12/01/18
Project Manager: NDS
Status: Archived Closure
Comments: December 1, 6-9,13-17,19-22,28-31

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st st s
Description: sanitary and storm CIPP rehab for city
Location:
Budget:
Start Date: 08/23/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St S
Description: 1 parking space closure
Location:
Budget:
Start Date: 08/01/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: August 1,3,9,11,13-18,23-24,30-31

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St S
Description: 1 parking spot closure
Location:
Budget:
Start Date: 07/06/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: July 6-7, 10-14,17-21,25-28,31 & August 1

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St S
Description: Moving
Location: 100 block of 1st St S
Budget:
Start Date: 10/28/19
Project Manager: Alexa Andrews
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St S
Description: This is a closure not in excess of 48 hours.
Location: 1st St S at the Ped Mall - Vitae Spirits
Budget:
Start Date: 12/04/21
Project Manager: Ian Glomski
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St S
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: 1000 1st St S - Digs. Inc
Budget:
Start Date: 12/13/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St S
Description:
Location:
Budget:
Start Date: 10/26/20
Project Manager: Chris Virgilio
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St S
Description: Road closure and sidewalk closure.
Location: Between South St and Garrett St - Woodard Properties
Budget:
Start Date: 11/05/20
Project Manager: Chris Virgilio
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St S
Description: Drive thru CoViD-19 testing
Location: 1st St S - UVA Health
Budget:
Start Date: 12/22/20
Project Manager: Dawn Niles
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st St S
Description:
Location: Between Lankford Ave and Elliott Ave - Linco
Budget:
Start Date: 06/10/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st Street N
Description: 2 parking space closure for POD placement
Location: 423
Budget:
Start Date: 01/07/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st Street N
Description: Sidewalk closed for emergency roof repair
Location: Between Jefferson St & High St
Budget:
Start Date: 03/18/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st Street S
Description: January event parking space closure
Location:
Budget:
Start Date: 01/04/19
Project Manager:
Status: Archived Closure
Comments: Closure dates: Jan 4-6 , 12-19, 22-27, 30

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st Street South-Woodard
Description: 1st Street South between South Street West and Railroad Track and 1 side of sidewalk will be closed. Use 2nd St for access.
Location: 1st Street South between South Street West and Railroad Track and 1 side of sidewalk
Budget:
Start Date: 05/04/22
Project Manager: C
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 1st Street South-Woodard
Description: 1st Street South between South Street West and Railroad Track and 1 side of sidewalk will be closed. Use 2nd St for access.
Location: 1st Street South between South Street West and Railroad Track and 1 side of sidewalk
Budget:
Start Date: 05/04/22
Project Manager: C
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 200 W.Main/ Downtown
Description: Grease trap cleaning
Location: Downtown pedestrian mall, infront of Cinema
Budget:
Start Date: 02/12/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2029 Ivy Rd - Public Utilities
Description: Gas utility work
Location:
Budget:
Start Date: 11/15/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 203 Hartman's Mill Rd - Backhoe Bob's
Description: Water / Sewer taps
Location:
Budget:
Start Date: 02/05/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 212 E. Main St - Citizen Burger Bar - Virginia Pacific
Description: Painting Renovations
Location: 212
Budget:
Start Date: 08/24/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 215 E Main St - Paramount
Description:
Location: Downtown Mall at the Paramount
Budget:
Start Date: 05/20/21
Project Manager: Mathew Simon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2201-2205 Fontaine Ave
Description: Power Line Pole removal and installation.
Location: 2201-2205 Fontaine Ave
Budget:
Start Date: 08/16/23
Project Manager: Dominion
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 227 Hartmans Mill Rd - Backhoe Bobs
Description: Water and Sewer Taps
Location: 200 block Hartman's Mill Rd (between Ridge St. & 1st St)
Budget:
Start Date: 10/17/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 250 - Kokosing
Description:
Location: 250 at Rugby Road
Budget:
Start Date: 02/28/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 250 - Linco
Description:
Location: 250 between McIntire Park Drive and CFD Station 1
Budget:
Start Date: 07/16/23
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 250 Bypass - Cville Parks & Rec
Description: Tree Cut on Watson Ave, on-ramp from Locust Ave
Location: Watson Ave, between St. Charles and Marshall
Budget:
Start Date: 08/08/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 250 Bypass - Cville Parks & Rec
Description: Tree Cut on Watson Ave, on-ramp from Locust Ave
Location: Watson Ave, between St. Charles and Marshall
Budget:
Start Date: 08/08/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 250 Bypass - Cville Parks & Rec
Description: Tree Cut on Watson Ave, on-ramp from Locust Ave
Location: Watson Ave, between St. Charles and Marshall
Budget:
Start Date: 08/08/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 250 Bypass - Cville Parks & Rec
Description: Tree Cut on Watson Ave, on-ramp from Locust Ave
Location: Watson Ave, between St. Charles and Marshall
Budget:
Start Date: 08/08/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 250 Bypass - Cville Parks & Rec
Description: Tree Cut on Watson Ave, on-ramp from Locust Ave
Location: Watson Ave, between St. Charles and Marshall
Budget:
Start Date: 08/08/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 250B - Southern Traffic
Description:
Location: US 250B near Gentry Lane
Budget:
Start Date: 05/20/23
Project Manager: Kevin Morgan
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2522 - 2526 Willard Dr - Davison Builders
Description: Crane for roof repair
Location:
Budget:
Start Date: 12/13/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St
Description:
Location: 455 2nd St
Budget:
Start Date: 04/23/20
Project Manager: Joe Chiocca
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NE
Description:
Location: 101 2nd St NE - Quilts Unlimited
Budget:
Start Date: 01/27/20
Project Manager: Joan Fenton
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NE
Description: Parking.
Location: 2nd St NE - VMDO Architects
Budget:
Start Date: 11/15/19
Project Manager: Susan Mills
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NE
Description: Moving truck.
Location: 300 block of 2nd St NE
Budget:
Start Date: 07/15/19
Project Manager: Laurence Mann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NE
Description: Parking spaces for roof repairs.
Location: 2nd St NE and E Jefferson
Budget:
Start Date: 05/06/19
Project Manager: John Epperly
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NE
Description: Attach fiber cable to existing poles
Location:
Budget:
Start Date: 10/16/18
Project Manager: Bryan McDearmon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NE
Description:
Location: 2nd St NE - Valley Boiler
Budget:
Start Date: 12/05/20
Project Manager: Ed Ponce
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NE
Description: POD
Location: 413 2nd St NE - POD
Budget:
Start Date: 01/04/21
Project Manager: Aaron Marcus
Status: Archived Closure
Comments: POD

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW
Description:
Location: 2nd St NW - Moving Truck
Budget:
Start Date: 02/26/21
Project Manager: Larry Engle
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW
Description: Church is using a crane on this road to install bells.
Location: 2nd St NW between High St and E Jefferson St.
Budget:
Start Date: 04/29/19
Project Manager: Proal Heartwell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW
Description: 2 parking space closure for moving truck
Location: 100 block
Budget:
Start Date: 12/10/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW
Description:
Location:
Budget:
Start Date: 06/05/19
Project Manager: Dennis Bodenstein
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW
Description: Parking.
Location: 100 2nd ST NW near pedestrian mall
Budget:
Start Date: 09/19/19
Project Manager: Joe Cacciotti
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW
Description: This is a sidewalk closure not in excess of 48 hours for the removal of debris.
Location: Corner of 2nd St NW and E Market St
Budget:
Start Date: 10/17/19
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW
Description: 2nd St NW between Market St and W Main St closure for sewer work.
Location: 113 2nd St NW - Scotts Backhoe
Budget:
Start Date: 11/13/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW - Frank Saul Co
Description: Construction equipment parking weekdays only.
Location: 120 High Street
Budget:
Start Date: 05/10/21
Project Manager: Ashley Weisenborn
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW - Real Property Inc.
Description: Painting Project w/ lift.
Location: 200 block
Budget:
Start Date: 04/15/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW - Strumlauf Stone
Description: Stonemasonry work.
Location: 120 W High St
Budget:
Start Date: 11/06/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St NW - Strumlauf Stone
Description: Stonemasonry work.
Location: 120 W High St
Budget:
Start Date: 11/06/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description: This is a sidewalk and parking spot closure not in excess of 48 hours.
Location: SW corner of Monticello Ave and 2nd St SE - Whitley Roofing
Budget:
Start Date: 06/30/21
Project Manager: Andy Pearcy
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description:
Location: 400 block of 2nd St SE - Morin and Barkley
Budget:
Start Date: 06/11/20
Project Manager: Kim Ferguson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description:
Location: Between E Water St and Garrett St - AG Dillard
Budget:
Start Date: 04/21/20
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description:
Location: Between Garrett St and RR tracks - Commonwealth Excavating
Budget:
Start Date: 06/26/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description:
Location: Between the Railroad tracks and Garrett St - Batson-Cook
Budget:
Start Date: 07/01/20
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description:
Location: Between Water St and Ped Mall - Albemarle Heating
Budget:
Start Date: 11/17/20
Project Manager: Mark Livingston
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description: Moving
Location: 455 2nd St SE - Investure
Budget:
Start Date: 11/11/20
Project Manager: Erica Watson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description: This street and sidewalk closure is not in excess of 48 hours.
Location: Between Garrett St and Railroad crossing on 2nd St SE
Budget:
Start Date: 09/23/20
Project Manager: David Hamilton
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description: Moving.
Location: 400 2nd St SE
Budget:
Start Date: 11/12/19
Project Manager: Tammy Dorcas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description:
Location: Between Garrett St and Railroad
Budget:
Start Date: 03/11/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description: Sidewalk repair.
Location: 2nd St SE between Monticello Ave and Water St
Budget:
Start Date: 10/07/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description: Shoulder operation, installing new water meter for City
Location:
Budget:
Start Date: 11/26/18
Project Manager: Brian Estess
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description: sidewalk closure for unloading of scaffolding
Location:
Budget:
Start Date: 04/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description: Sidewalk closure for installment of new water meter for the City
Location: 900 block
Budget:
Start Date: 04/08/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE
Description: Better Business Challenge Awards
Location: 2nd St SE Mall Area
Budget:
Start Date: 06/20/19
Project Manager: Teri Kent
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SE - Friends of Cville
Description: To operate scissor lift w painter
Location: Downtown Mall
Budget:
Start Date: 08/24/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SW
Description:
Location: Between South St and Water St - Faulconer
Budget:
Start Date: 08/11/21
Project Manager: Robin Moriarty
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SW
Description: Emergency line repair
Location: Downtown Pedestrian Mall Crossing
Budget:
Start Date: 12/12/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SW
Description: 4 Parking space closures for moving truck
Location:
Budget:
Start Date: 09/21/18
Project Manager: Eliza Dilello - Book keeper
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SW
Description: Painting a mural.
Location: 100 block of 2nd St SW adjacent to the Violet Crown
Budget:
Start Date: 10/14/19
Project Manager: Alan Goffinski
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SW
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: 2nd St Sw adjacent to the Violet Crown
Budget:
Start Date: 09/30/19
Project Manager: Alan Goffinski
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SW
Description:
Location: 2nd St SW
Budget:
Start Date: 08/19/19
Project Manager: Joseph Bolasky
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SW - Tri-State
Description: Abandon Storm pipe and Structure/Restoration
Location: 2nd St SW between Downtown Mall & Water St (9/6) 2nd St SW between Water St & South St (9/7)
Budget:
Start Date: 09/06/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SW - Tri-State
Description: Abandon Storm pipe and Structure/Restoration
Location: 2nd St SW between Downtown Mall & Water St (9/6) 2nd St SW between Water St & South St (9/7)
Budget:
Start Date: 09/08/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd St SW - Tri-State
Description: Storm pipe clean.
Location: 2nd St SW between W Water St x South Street West
Budget:
Start Date: 08/28/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd Street NE
Description: Parking closure, moving truck
Location:
Budget:
Start Date: 10/18/18
Project Manager: Karen Parks
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd Street NE - JMRL
Description:
Location: 2nd Street NE between Market and Jefferson
Budget:
Start Date: 06/10/23
Project Manager: Krista Farrell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd Street NW
Description:
Location: asdf
Budget:
Start Date: 12/30/99
Project Manager: Proal Heartwell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 2nd Street SE
Description: Street and parking closure for sanitary manhole work.
Location: 900 block
Budget:
Start Date: 04/23/19
Project Manager:
Status: Archived Closure
Comments: Detour through 6th Street SE

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 300 - 312 Harris Rd - PennLine (Dominion)
Description: Tree trimming for power lines.
Location:
Budget:
Start Date: 04/22/24
Project Manager:
Status: Future Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 300 block Carlton Rd - Tri-State
Description: Storm Drain Work
Location:
Budget:
Start Date: 03/05/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 300 Market St
Description: Parking Space Closure
Location: 300 Market St
Budget:
Start Date: 04/26/19
Project Manager: Denise Postleweight
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 304 Riverside Ave - Backhoe Bob's
Description: Sewer/Water Tap
Location:
Budget:
Start Date: 04/08/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 304 Riverside Ave - Backhoe Bob's
Description: Sewer/Water Tap
Location:
Budget:
Start Date: 04/15/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 312 Chestnut St - Scotts
Description: Street closure w/ detour
Location:
Budget:
Start Date: 01/03/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 314 Monte Vista Ave
Description: POD
Location:
Budget:
Start Date: 09/28/20
Project Manager: Bruce Quinn
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 317 East Water Street
Description: sidewalk needs to be removed on control joint removing 36" wide area installing drain in the center of this section, drain can not be installed adjacent to control joint
Location: 317 East Water Street
Budget:
Start Date: 10/14/22
Project Manager: Angela Martin-Whatley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd St NE
Description: A detour installed for thru traffic. Local traffic may gain access.
Location: Between Headge St and High St - Linco
Budget:
Start Date: 12/13/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd St NE
Description: 3 parking spaces
Location: 3rd St NE between Jefferson and High St
Budget:
Start Date: 05/16/19
Project Manager: Geraldine Moohr
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd St NE
Description: Sanitary CIPP rehab for city
Location:
Budget:
Start Date: 08/14/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd St NE
Description: POD
Location: 400 Block 3rd St NE
Budget:
Start Date: 07/03/19
Project Manager: Julia Montuith
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd St NE
Description: Pole removal.
Location: 3rd St NE near E Market St
Budget:
Start Date: 08/06/19
Project Manager: Theresa Bryant
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd St NE
Description:
Location: 3rd St NE by the Paramount Theater
Budget:
Start Date: 11/04/19
Project Manager: Darrell Jackson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd St NE - Hittle
Description:
Location: 200 Block 3rd St NE
Budget:
Start Date: 10/01/21
Project Manager: Nathan Hittle
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd St NE - Martin Horn
Description:
Location: 3rd St NE just north of E Jefferson
Budget:
Start Date: 01/24/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd St NE - Paramount Theater
Description: Partial closure of sidewalk for roofing work. Hydraulic lift will be used. Type 2 barricades will surround the work area. Full-time safety persons will be present monitoring activity area.
Location: Downtown Mall - West side of 3rd St NE between E. Main St. and E. Market St.
Budget:
Start Date: 08/30/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd St NE - Scotts Backhoe
Description:
Location: 440 3rd St NE
Budget:
Start Date: 07/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd Street NE - Lumos Segra
Description:
Location: 3rd Street NE between E Jefferson Street and E Market Street; shoulder closure at 3rd & E Market
Budget:
Start Date: 07/19/23
Project Manager: Dean Scheidt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd Street NE - Lumos Segra
Description:
Location: 3rd Street NE between E Jefferson Street and E Market Street; shoulder closure at 3rd & E Market
Budget:
Start Date: 07/19/23
Project Manager: Dean Scheidt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 3rd Street SE - Monarch
Description:
Location: 101 3rd Street SE
Budget:
Start Date: 06/26/23
Project Manager: Michael Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 400 block E High St x Park St x 4th St - Segra
Description: Fiber Optic re-lashing.
Location:
Budget:
Start Date: 10/16/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 400 block E Water St - GIC
Description: Moving Van. Unloading.
Location:
Budget:
Start Date: 01/30/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 400 E Main St - Downtown Mall
Description: Fire to the building. Utilities restoration.
Location:
Budget:
Start Date: 08/01/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 401-407 E Main St - York Property
Description: Awning removal by ladder.
Location: North sidewalk downtown mall at 4th St NE intersection
Budget:
Start Date: 08/28/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 402-420 Park St - Van Yahres Tree Co
Description:
Location: 400 block of Park
Budget:
Start Date: 12/21/23
Project Manager:
Status: Archived Closure
Comments: Tree removal, with 3rd party contracted Traffic Control, Detours for motorists.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 403 Emmet St S - Hourigan
Description: Lane Shift Taper
Location:
Budget:
Start Date: 02/08/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 405 Avon St - Elliot
Description: Sidewalk installation.
Location:
Budget:
Start Date: 10/04/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 405 E Hight St
Description:
Location: Eastern Sidewalk along 4th St NE between E Jefferson and E High St
Budget:
Start Date: 07/10/21
Project Manager: City of Charlottesville
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 406 E Main St - Dolce Downtown
Description: Painting Renovations
Location: Partial southernmost sidewalk
Budget:
Start Date: 10/24/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 410 Hanover St - Kingma Development
Description: Replace curb and sidewalk with driveway.
Location:
Budget:
Start Date: 08/28/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 411 E High St - Tri-State - 10.3.2023
Description: Manhole Rehab
Location:
Budget:
Start Date: 11/06/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 412 E Main St - Maru
Description: Commercial kitchen hood steam cleaning.
Location: Downtown Mall
Budget:
Start Date: 08/23/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 412 E Main St - Maru
Description: Commercial kitchen hood steam cleaning.
Location: Downtown Mall
Budget:
Start Date: 08/23/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 414 E. Main St - Downtown Mall - Virginia Pacific
Description: Painting Renovations
Location: 414
Budget:
Start Date: 08/30/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 423 E Main St - DNA Softwash
Description: Graffiti removal. Power washing.
Location: Downtown Mall
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description:
Location: 4th St NE at Courthouse - SBH
Budget:
Start Date: 12/27/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description:
Location:
Budget:
Start Date: 08/16/21
Project Manager: Charles Lewis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description:
Location: 104 4th St NE
Budget:
Start Date: 12/28/20
Project Manager: Hadley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th st NE
Description:
Location: Between Hedge St and E High St
Budget:
Start Date: 04/17/20
Project Manager: Michael Price
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description: Dates closure is effective: 12/9 - 12/10 and 12/16 - 12/17.
Location: Hedge St to E High St - Linco
Budget:
Start Date: 01/06/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description:
Location: Between E Market St and E Jefferson St - Linco
Budget:
Start Date: 01/08/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description: Crane.
Location: 116 4th St NE
Budget:
Start Date: 08/06/19
Project Manager: Emily Dunn
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description:
Location: 400 Block of 4th St NE
Budget:
Start Date: 06/12/19
Project Manager: David Cathcart
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description: Crane operation for one and a half hours.
Location: 116 4th St NE
Budget:
Start Date: 08/15/19
Project Manager: Emily Dunn
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description:
Location: Between High St and Hedge St
Budget:
Start Date: 09/09/19
Project Manager: Michael Price
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description: 1 parking space closure for moving truck
Location:
Budget:
Start Date: 12/01/18
Project Manager: Christa Albano
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE
Description: Moving, 6 parking space closure
Location: along 310 4th St length of building
Budget:
Start Date: 02/22/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE - Heather Heyer Way
Description:
Location: Between 4th St Alley and Water St - Martin Horn
Budget:
Start Date: 07/06/20
Project Manager: Barbara Regester
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE - Heather Heyer Way
Description:
Location: Between E Market St and Water St - Martin Horn
Budget:
Start Date: 07/13/20
Project Manager: Barbara Regester
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NE - Rooftop Services
Description:
Location: 108 4th Street between the mall and Market
Budget:
Start Date: 05/24/21
Project Manager: John Epperly
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NW
Description:
Location: 305 4th St NW - Commonwealth Excavating
Budget:
Start Date: 06/25/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NW
Description:
Location: 355 4th St NW - City of Charlottesville
Budget:
Start Date: 08/10/20
Project Manager: Susan Dyer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St NW
Description: This is a sidewalk closure not in excess of 48 hours.
Location: 305 4th St NW - Lumos
Budget:
Start Date: 07/19/23
Project Manager: Dean Scheidt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description:
Location: From Market St to 108 4th St SE - Albemarle Heating
Budget:
Start Date: 09/01/20
Project Manager: Mark Livingston
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description: Closure for delivery of steel. 4/18 and 4/20
Location: Between Garrett St and E Water St - Martin Horn
Budget:
Start Date: 04/18/20
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description: Lane closure with lane weave to install new water meter for City
Location:
Budget:
Start Date: 12/05/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description:
Location:
Budget:
Start Date: 11/14/18
Project Manager: Mike Carrico
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description: Street and sidewalk closure for crane set up.
Location: Garrett St to Water St
Budget:
Start Date: 05/10/19
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description: Boom lift to move supplies from 7am - 9am.
Location: 4th St SE between Water St and Main St Pedestrian Mall
Budget:
Start Date: 08/16/19
Project Manager: Stuart Walton
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description: Removal of hazardous materials for the City.
Location: 4th St SE under the railroad bridge between Water and Garrett
Budget:
Start Date: 07/11/19
Project Manager: Brad Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description: 4th St Closure for crane operation with detour in place.
Location: 4th St SE - Batson Cook
Budget:
Start Date: 11/15/19
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description: Crane removal operation.
Location: Between Garrett St and Railroad Crossing - Batson-Cook
Budget:
Start Date: 04/04/20
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description: Due to public safety after crane incident.
Location: 4th St From Water St to Garrett St
Budget:
Start Date: 01/06/20
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE
Description: Crane operation. Sidewalk closure is not in excess of 48 hours.
Location: Between E Main St and E Water St - WO Grubb Crane
Budget:
Start Date: 02/27/20
Project Manager: Andrew Hill
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St SE and Garrett St
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: 4th St SE and Garrett St from 2nd St SE - MH
Budget:
Start Date: 09/22/21
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th St. NE
Description: Paving, Striping and Signage improvements.
Location: 4th St NE between Market and Water
Budget:
Start Date: 10/30/19
Project Manager: PW
Status: Archived Closure
Comments: Closure only during the daytime.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th Street & Mall
Description: Crane placement for setting of rooftop units. 4th Street from Market St to Water St closure from 6:30 am - 9:30am. Sidewalk and Parking closure all day.
Location: 4th Street between Water St and Market St
Budget:
Start Date: 03/20/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4th Street NW - Lumos Segra
Description:
Location: 305 4th Street NW
Budget:
Start Date: 06/26/23
Project Manager: Dean Scheidt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 4the St NE
Description: Moving truck.
Location: 4th St NE
Budget:
Start Date: 08/16/19
Project Manager: Sarah Fwoley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 500 - 610 West Main St
Description: Sanitary sewer utility connection.
Location: 510 - 600 West Main St EB lane sidewalk
Budget:
Start Date: 06/03/19
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 501-511 Ridge St - PennLine (Dominion)
Description: Tree Trimming for Power Lines.
Location: Ridge St x Oak St
Budget:
Start Date: 04/15/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 505 Garrett St - Momentum
Description: Sewer Tap
Location:
Budget:
Start Date: 10/04/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 511 E Water St - Uhler & Co
Description: Craning material into unit 5C
Location:
Budget:
Start Date: 02/12/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 511 E Water St - Uhler & Co
Description: Crane set-up. Insulation Unit 5C
Location:
Budget:
Start Date: 01/25/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 511 E Water St - Uhler & Co
Description: Insulating Holsinger Unit 5C
Location:
Budget:
Start Date: 12/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 511 E Water St - Uhler & Co
Description: Craning material into Unit 5C
Location:
Budget:
Start Date: 03/26/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 512 13th St NW
Description: Parking spot closure storage container use.
Location: 512 13th St NW
Budget:
Start Date: 04/29/19
Project Manager: Dennis Woodriff
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 515 E Water St - Monarch
Description: Remove and Replace sidewalk for plumbing repair.
Location: North most sidewalk on E Water at or around 515 address
Budget:
Start Date: 11/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St
Description:
Location: Between 5th St Station and Avon St - Mid-Atlantic
Budget:
Start Date: 12/12/20
Project Manager: Thomas DeGaetano
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St
Description: Moving Truck
Location: 5th St
Budget:
Start Date: 06/06/19
Project Manager: Seth Rajosta
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE
Description: Construction Equipment
Location: 200 Block of 5th St NE
Budget:
Start Date: 06/24/19
Project Manager: Matt Lindeman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE
Description: Sanitary CIPP rehab for city
Location:
Budget:
Start Date: 08/15/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE
Description: VBS van
Location:
Budget:
Start Date: 08/09/18
Project Manager: Jamie Valencia
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE
Description: This is a sidewalk closure not in excess of 48 hours.
Location: 209 5th St NE - HUB
Budget:
Start Date: 04/05/21
Project Manager: Quinton Harrell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE
Description:
Location: Between Ped Mall and E Market St - Fiber NS
Budget:
Start Date: 10/15/21
Project Manager: Jeff Williams
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE - Southern Air
Description: Air Unit removal/installation with crane.
Location: 5th St NE between E Market St & Court Sq
Budget:
Start Date: 08/30/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE - Teel painting
Description: Painting Renovations taking place on building 206.
Location: 206 5th St NE
Budget:
Start Date: 08/17/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE and Main
Description: Removal of Film Festival elevator banner
Location: Corner of 5th St NE and Main (on pedestrian mall), in front of Market Street Garage elevator
Budget:
Start Date: 11/30/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE and Main St
Description: Installation of a banner.
Location: Corner of 5th St NE and E Main St
Budget:
Start Date: 08/19/19
Project Manager: Ben Campbell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE and Mall
Description: Utility Van on 5th Street NE, Bucket Truck on corner of Garage on mall
Location:
Budget:
Start Date: 08/07/18
Project Manager: Ben Campbell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE and Mall
Description: Installation of Film Festival elevator banner on mall
Location: Corner of 5th St SE and Mall infront garage elevator
Budget:
Start Date: 09/20/18
Project Manager: Ben Campbell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NE Downtown Mall
Description: This closure will allow the removal of the TomTom festival elevator banner.
Location: Corner of 5th St NE and Main St, in front of elevator of the Market St Garage.
Budget:
Start Date: 04/29/19
Project Manager: Ben Campbell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St NW
Description: 2 Parking spot closure for pick up truck
Location: in front of 203
Budget:
Start Date: 06/18/18
Project Manager: Frank Walker/ Teresa Price
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description: Moving trucks
Location:
Budget:
Start Date: 08/10/18
Project Manager: David Goldstein
Status: Archived Closure
Comments: Knows to be out before cville closure

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description: Moving truck
Location: 100 5th St SE
Budget:
Start Date: 06/30/19
Project Manager: Zach Hutcheson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description:
Location: 5th St SE
Budget:
Start Date: 06/12/19
Project Manager: Chris Dowdy
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description: Moving
Location: 5th St SE at Water St W
Budget:
Start Date: 07/25/19
Project Manager: April Wimberley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description:
Location: 100 5th St SE - Private
Budget:
Start Date: 03/29/20
Project Manager: Angela Amin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description:
Location: Water St near 5th St SE
Budget:
Start Date: 05/07/20
Project Manager: Joe Chiocca
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description:
Location: Northwest corner of 5th St SE/E Water St intersection
Budget:
Start Date: 09/27/21
Project Manager: Will Clark
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description:
Location: 112 5t St SE - Parking
Budget:
Start Date: 07/20/21
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description:
Location: 112 5th St SE - POD
Budget:
Start Date: 07/08/21
Project Manager: James Gorman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description:
Location: 107 5th St SE - Virtex
Budget:
Start Date: 03/10/21
Project Manager: Douglas Moore
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE
Description: Moving truck parking.
Location: 100 block of 5th St SE - Siddall
Budget:
Start Date: 07/07/20
Project Manager: Michael Siddall
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE - Virginia Pacific
Description: Hydraulic Lift Storage for removal
Location: Downtown Mall
Budget:
Start Date: 09/01/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SE and Water St
Description:
Location: 107 5th St SE - Sun Tribe Solar
Budget:
Start Date: 08/24/21
Project Manager: Will Clark
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St Station Parkway - Contour Construction
Description: Wawa project utilities installation
Location:
Budget:
Start Date: 11/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St Station Parkway - Contour Construction
Description: Westbound lane shift closure. Driveway creation.
Location:
Budget:
Start Date: 02/19/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW
Description:
Location: Dice St to Cherry Ave - TriState
Budget:
Start Date: 12/20/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW
Description:
Location: From Cleveland Ave to 1185 5th St SW - TriState
Budget:
Start Date: 08/31/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW
Description:
Location: Northbound outside lane before Harris Rd - Dominion
Budget:
Start Date: 10/08/21
Project Manager: Pam Johnson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW
Description:
Location: Ridge St to Barksdale St - TriState
Budget:
Start Date: 05/05/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW
Description:
Location: Right turn lane near Bent Creek Rd. - Digs, Inc.
Budget:
Start Date: 05/11/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW
Description:
Location: 601 5th St SW Northbound right lane - Digs, Inc
Budget:
Start Date: 06/08/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW
Description:
Location: Bent Creek Rd and Harris Rd - Tri State Utilities
Budget:
Start Date: 03/04/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW
Description:
Location: 800 5th ST SW inside lane closure - Linco
Budget:
Start Date: 03/26/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW
Description: Water main work.
Location: Between Old 5th St and Crossover- Linco
Budget:
Start Date: 02/10/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW
Description: Road closure to thru traffic for manhole work.
Location: 5th St SW - Century Link
Budget:
Start Date: 01/30/20
Project Manager: Curtis Bradby
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW - Contour
Description: Driveway creation, sidewalk creation.
Location:
Budget:
Start Date: 03/07/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW - Contour
Description: Water/Utility Tie In
Location:
Budget:
Start Date: 01/07/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW - Dominion
Description:
Location: At Harris St
Budget:
Start Date: 02/07/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW - Pennline (Dominion)
Description: Tree pruning on behalf of Dominion.
Location:
Budget:
Start Date: 03/25/24
Project Manager:
Status: Archived Closure
Comments: No Permit.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW - Pennline (Dominion)
Description: Tree Trimming (Power Lines)
Location: (between 5th St Station & Harris Rd)
Budget:
Start Date: 04/10/24
Project Manager:
Status: Completed Closure
Comments: Weather Permitting

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW - Pennline (Dominion)
Description: Tree trimming for Power Lines
Location: Intersection of 5th St SW & Brookwood Dr to Old 5th St Cir (1st entrance)
Budget:
Start Date: 04/08/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th St SW - Pennline (Dominion)
Description: Tree trimming for power lines.
Location: Intersection of 5th St SW & Old 5th St Cir (1st entrance) to Berring St
Budget:
Start Date: 04/10/24
Project Manager:
Status: Completed Closure
Comments: Non-peak traffic hours

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th Street
Description: Sidewalk closure. City request erosion control
Location:
Budget:
Start Date: 10/10/18
Project Manager: Quinn Durnien
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th Street
Description: 1 parking space closure for moving
Location: 200 block
Budget:
Start Date: 04/25/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th Street
Description: Access existing manhole for utility work.
Location: South Bound turning lane
Budget:
Start Date: 10/23/18
Project Manager: Theresa Bryant
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th Street - Lynch
Description:
Location: 5ht Street Between Market and E. Jefferson - E. Jefferson from 5th to Park
Budget:
Start Date: 04/29/21
Project Manager: RG Kitchen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th Street NE
Description: 2 parking space closure for dumpster placement
Location: 500 block
Budget:
Start Date: 01/07/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th Street NE
Description: 1 parking space closure for ceremony
Location: 200 block
Budget:
Start Date: 06/01/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th Street NE - Southern Air
Description:
Location: 5th Street NE between E Market Street and E Jefferson Street
Budget:
Start Date: 06/30/23
Project Manager: Ray Spivey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 5th Street SE
Description: Crane to lift units on and off of rooftop at 115 5th St SE
Location: 115 5th Street & Downtown Pedestrian Mall
Budget:
Start Date: 01/21/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 600 - 610 E Water St - Caton
Description: Belmont Bridge Restoration project.
Location:
Budget:
Start Date: 04/01/23
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 600 - 610 E Water St - Caton
Description: Belmont Bridge Restoration project.
Location:
Budget:
Start Date: 04/01/23
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 600 - 610 E Water St - Caton
Description: Belmont Bridge Restoration project.
Location:
Budget:
Start Date: 04/01/23
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 601 Locust Ave
Description: Moving.
Location: Corner of Locust Ave and Sycamore St
Budget:
Start Date: 08/05/19
Project Manager: Debbie Seusy
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 612 E. Jefferson St - Public Works
Description: Sidewalk removal and installation.
Location: Southernmost sidewalk between Court Sq & 7th St NE
Budget:
Start Date: 12/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 614 E High St - M.Wilton Co.
Description: Sewer/Water Line excavation process. Traffic Control provided by P.D. Brooks - Lane Merge taper w/ flaggers on stand-by.
Location: Between Park St & 7th St NE
Budget:
Start Date: 09/13/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 633 Rose Hill Dr - Chad's Excavating
Description: Installation of Sewer Lateral
Location:
Budget:
Start Date: 02/29/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 64 University Way - Cornerstone
Description: Utility Connection for renovations.
Location:
Budget:
Start Date: 01/04/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St NE
Description: This closure is scheduled for 3 days only; 6/24, 6/26, and 7/2.
Location: 6th St NE - Abrhamse
Budget:
Start Date: 06/24/20
Project Manager: Kyle Detuncq
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St NE
Description: Red Cross
Location: 6th St NE between garage and City Hall
Budget:
Start Date: 09/20/19
Project Manager: Jaime Valencia
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St NE
Description: Parking spots.
Location: 6th St NE
Budget:
Start Date: 10/11/19
Project Manager: Jamie Valencia
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St NE
Description: Red Cross Parking
Location: 6th St NE - City/Red Cross
Budget:
Start Date: 01/16/20
Project Manager: Jamie Valencia
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St NE
Description: Dumpster
Location: 6th St NE near Ped Mall - Alexander Nicholson
Budget:
Start Date: 01/27/20
Project Manager: Stuart Squire
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St NE
Description: Parking construction truck.
Location: 7th St NE - CW1924
Budget:
Start Date: 01/22/20
Project Manager: Jimmy Atkinson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St NE
Description:
Location: 6th St NE at Court Square - Alexander Nicholson
Budget:
Start Date: 12/24/19
Project Manager: Jeff Testerman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE
Description: Sanitary Sewer Repair
Location: Montrose to Blenheim St
Budget:
Start Date: 10/05/18
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE
Description: New water meter for city, street closure
Location:
Budget:
Start Date: 11/13/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments: One way detour into South St E and Avon St

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE
Description:
Location: At Rougemont Ave - Linco
Budget:
Start Date: 06/15/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE
Description: UVA COVID Testing site.
Location: Between Garrett St and Monticello Ave - UVA COVID Testing
Budget:
Start Date: 07/25/20
Project Manager: UVA
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE
Description: Ribbon-cutting ceremony
Location: Between Monticello Ave & Belmont Ave
Budget:
Start Date: 08/19/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1015, Blenheim Ave, Monticello Ave, 504, Ferguson Supply
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1015, Blenheim Ave, Monticello Ave, 504, Ferguson Supply
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1015, Blenheim Ave, Monticello Ave, 504, Ferguson Supply
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1015, Blenheim Ave, Monticello Ave, 504, Ferguson Supply
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1015, Blenheim Ave, Monticello Ave, 504, Ferguson Supply
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE - Momentum Earthworks
Description: Asphalt Patching.
Location:
Budget:
Start Date: 12/04/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE - Momentum Earthworks
Description: Sanitary tap
Location: 6th St SE between Hinton Ave & Garret St
Budget:
Start Date: 11/01/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE - Momentum Earthworks
Description: Sewer Tap
Location:
Budget:
Start Date: 11/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 6th St SE - Scotts Backhoe
Description: Disconnecting Water & Sewer
Location: 600 Altavista Ave (Corner House)
Budget:
Start Date: 04/08/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7 1/2 St SW
Description:
Location: Between Pine St and Prospect Ave - Scotts Backhoe
Budget:
Start Date: 01/02/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 712 West St
Description:
Location: 712 West St - POD
Budget:
Start Date: 06/24/20
Project Manager: Barrett Duncan
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 722 Park St - Element Co.
Description: Driveway Installation.
Location:
Budget:
Start Date: 03/20/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th and 8th St at City Hall Annex
Description: This is a partial sidewalk closure not in excess of 48 hours.
Location: Behind the City Hall Annex - City of Charlottesville
Budget:
Start Date: 03/14/20
Project Manager: Jason Davis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St and W Water
Description: Sanitary and storm work for City of Charlottesville. Night work.
Location: 7th St NE between E market and Jefferson & W Water between 1st and 2nd St
Budget:
Start Date: 05/16/19
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St and W Water
Description: Sanitary and storm work for City of Charlottesville. Night work.
Location: 7th St NE between E market and Jefferson & W Water between 1st and 2nd St
Budget:
Start Date: 05/16/19
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: 1 parking space closure
Location: 200th block
Budget:
Start Date: 11/27/18
Project Manager: Dennis Schmidt
Status: Archived Closure
Comments: closed 4 days a week, Monday-Thursday

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: Loading zone closure for UVA Mobile Mammography Bus
Location:
Budget:
Start Date: 11/27/18
Project Manager: Christopher Baudo
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: UVA Mobile Mammography Bus
Location: Loading Zone
Budget:
Start Date: 11/15/18
Project Manager: Jamie Valencia
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: UVA Biometric Screening Van
Location: Loading Zone
Budget:
Start Date: 10/04/18
Project Manager: Jamie Valencia
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: UVA Flu Clinic
Location: Loading Zone
Budget:
Start Date: 10/24/18
Project Manager: Jamie Valencia
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: Sanitary and storm CIPP for city
Location:
Budget:
Start Date: 08/30/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description:
Location: Between E Market St and E Jefferson St
Budget:
Start Date: 01/20/20
Project Manager: Bobby Grubbs
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: Voter parking.
Location: 7th St NE and Key Rec Center - Office of Voter Registrar
Budget:
Start Date: 03/03/20
Project Manager: Jeff Mash
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: Funeral Parking
Location: 300 Block of 7th St NE - Hill and Wood Funeral Home
Budget:
Start Date: 11/16/19
Project Manager: Stephen Christianson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: Voting
Location: 7th St NE
Budget:
Start Date: 11/05/19
Project Manager: Martin Mash
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: Painting windows.
Location: 7th St NE at E Market St
Budget:
Start Date: 08/06/19
Project Manager: John Rafter
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description:
Location: 7th St NE behind teh First Presbyterian Church
Budget:
Start Date: 06/26/19
Project Manager: Michael Kelly
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: Weekdays Only
Location: 7th St NE near City Hall
Budget:
Start Date: 05/08/20
Project Manager: Martin Mash
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE
Description: 9/17 to 10/29 M, W, F 8:30 am to 4:30 pm and Tr 8:30 am to 7:00 pm 10/23 and 10/30 Sat 8:30 am to 5:00 pm
Location: 7th St NE Loop at City Hall
Budget:
Start Date: 09/17/21
Project Manager: Taylor Yowell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NE - Fix It Co.
Description: Window Replacement
Location:
Budget:
Start Date: 12/11/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St Northeast
Description:
Location: 7th St NE at S&P Global
Budget:
Start Date: 05/28/19
Project Manager: Bryant Musante
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NW
Description: Due to a water main break and damage caused, there will be a closure on 7th St NW between 8th St NW and Page St. The sidewalk on the west side of 7th St NW will also be closed.
Location: 7th St NW between 8th St NW and Page St
Budget:
Start Date: 03/22/19
Project Manager: Department of Utilities
Status: Archived Closure
Comments: ADA Alternate Route Description- Due to the sidewalk closure on 7th St NW, pedestrians will need to take 8th St NW to Anderson St. Anderson St sidewalks can be used to access 7th St NW.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St NW
Description:
Location:
Budget:
Start Date: 11/17/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St SW
Description:
Location: 7th St SW side entrance to church
Budget:
Start Date: 08/26/19
Project Manager: Charles Allen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th St SW - Tri-State
Description: Sanitary sewer rehab
Location:
Budget:
Start Date: 04/15/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th Street
Description: 1 parking space closure
Location: 200 block
Budget:
Start Date: 01/02/19
Project Manager:
Status: Archived Closure
Comments: Closure dates: Jan 2-3,7-17,21-24,28-31 Feb 4-7

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 7th Street NE
Description: Election Day parking, 2 parking space closure
Location: Between City Hall and Annex
Budget:
Start Date: 11/06/18
Project Manager: Joyce McKenney - Assistant Registrar
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8 th St NE
Description: Parking space and sidewalk closure.
Location: 212 8th St NE - Gilbane
Budget:
Start Date: 07/10/19
Project Manager: Rob Grubbs
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 805 Nalle St
Description:
Location: 805 Nalle St - Dominion
Budget:
Start Date: 02/11/21
Project Manager: Dominion
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 810 E High St - Roof Top Services
Description: Roof Replacement
Location:
Budget:
Start Date: 04/01/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 814 Ridge St - Scotts
Description: Water and Sewer installation.
Location:
Budget:
Start Date: 09/21/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 815, 827 Cherry Ave - Tri-State
Description: Manhole rehab
Location: Middle Turn Lane
Budget:
Start Date: 09/13/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 824 Valley View Cir
Description: Sewer tap
Location:
Budget:
Start Date: 12/04/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 839 Ridge St - Scotts
Description: Sidewalk creation
Location:
Budget:
Start Date: 10/02/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 839 Ridge St - Scotts
Description: Driveway installation
Location:
Budget:
Start Date: 10/02/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St
Description: Parking spot.
Location: Behind Gilbanes stair tower on 8th St at S&P Global.
Budget:
Start Date: 10/07/19
Project Manager: Brett Larson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St at S&P Global
Description: Parking spot.
Location: 8th St at S&P - Whitley Roofing
Budget:
Start Date: 11/04/19
Project Manager: Brett Larson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE
Description: Parking Spot
Location: 8th St NE - Riddleberger
Budget:
Start Date: 10/30/19
Project Manager: Matthew Avery
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE
Description:
Location: 8th St NE between Maple St and Farish St
Budget:
Start Date: 09/04/19
Project Manager: Joseph Williams
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE
Description: POD
Location: 500 Blcok 8th St NE
Budget:
Start Date: 06/28/19
Project Manager: Carol Guarnieri
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE
Description: removal of trees
Location:
Budget:
Start Date: 09/11/18
Project Manager: Flor L Kelly
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE
Description: Construction renovation on 4th floor S&p Global
Location:
Budget:
Start Date: 08/21/18
Project Manager: Bobby Grubbs - Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE - Harrisonburg Co.
Description: Replacing Retaining Wall - Stonemasonry
Location: 507 - 513 8th St NE
Budget:
Start Date: 03/08/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE - Lee Building Co
Description: Renovation of building.
Location:
Budget:
Start Date: 09/05/23
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE - Lee Building Co
Description: Housing Renovations
Location:
Budget:
Start Date: 09/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE - Linco
Description: Sidewalk removal and creation.
Location:
Budget:
Start Date: 01/29/24
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE - Linco
Description: Sidewalk removal and creation.
Location:
Budget:
Start Date: 01/29/24
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE - Linco
Description: Sidewalk removal and creation.
Location:
Budget:
Start Date: 01/29/24
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th St NE - Linco
Description: Sidewalk removal and creation.
Location:
Budget:
Start Date: 01/29/24
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th Street
Description: Dumpster and construction parking space closure
Location: 212
Budget:
Start Date: 03/02/19
Project Manager:
Status: Archived Closure
Comments: March-May Extension

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 8th Street NE
Description: Sidewalk and parking space closure in front of 212 8th St for construction renovation
Location: 200 block
Budget:
Start Date: 12/18/18
Project Manager:
Status: Archived Closure
Comments: Extension til March 1

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 9 1/2 St NE
Description:
Location: 920 9 1/2 St NE - Linco
Budget:
Start Date: 07/20/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 900 Block E Market St - Caton Construction
Description: Emergency Sewer Repair
Location:
Budget:
Start Date: 10/12/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 901 E Market St - Elliot
Description: Repair previous utility work
Location:
Budget:
Start Date: 11/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 913 Elliott Ave
Description: POD
Location: 913 Ellitott Ave - POD
Budget:
Start Date: 04/20/20
Project Manager: Leigh Mazzone
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 916 E High St - Faulconer
Description: Completion of repaving.
Location: 900 block E High St
Budget:
Start Date: 10/09/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 946 Grady Ave - Dairy Market
Description: Martha's Market
Location:
Budget:
Start Date: 10/28/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 9th St NE - Dominion
Description: Utility pole replacement.
Location:
Budget:
Start Date: 10/17/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 9th St NE x E Market St (Northwest sidewalk corner)
Description: Belmont bridge utilities excavation.
Location:
Budget:
Start Date: 11/09/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 9th St NW
Description:
Location: 419 9th St NW
Budget:
Start Date: 12/17/19
Project Manager: Mike Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 9th St NW
Description: 9th St NW will be closed to thru traffic between Paoli and Anderson St. Traffic will be detoured onto Paoli and Anderson St.
Location: 9th St NW between Paoli and Anderson St
Budget:
Start Date: 07/08/19
Project Manager: Michael Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 9th St SW
Description: New water main install.
Location: 9th St SW off of W Main St
Budget:
Start Date: 10/28/19
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: 9th St SW - Whitley
Description: Closure to facilitate roof work and safety of pedestrians below.
Location: 9th Street just south of West Main beside the Flats Apartments
Budget:
Start Date: 05/04/21
Project Manager: Brett Larson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Agnese St
Description: POD
Location: 1208 Agnese St
Budget:
Start Date: 07/05/19
Project Manager: Miles Morin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Albemarle
Description: Road Closed at the intersection of 7th St NW and 8th Ln N. Traffic will be detoured to 8th St NW from 7am to 5pm.
Location: Albemarle St at 7th St and Page St
Budget:
Start Date: 07/29/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Albemarle St
Description: Sidewalk repairs.
Location: 200, 500, and 700 block of Albemarle St
Budget:
Start Date: 06/03/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Alderman Rd
Description: Replace utility pole. This is a sidewalk closure not in excess of 48 hours.
Location: Between Thompson Rd and Pratt Dr
Budget:
Start Date: 11/12/19
Project Manager: Carl Pilat
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Alderman Rd
Description: Utility work.
Location: Alderman Rd between Ivy Rd and Morris St
Budget:
Start Date: 05/29/19
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Alderman Rd
Description:
Location: 401 Alderman Rd - Alexander Nicholson
Budget:
Start Date: 05/01/20
Project Manager: Calvin Johnson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Alderman Rd
Description:
Location: From Ivy Rd to Stadium Rd - Lumos
Budget:
Start Date: 05/28/20
Project Manager: Jared Morris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Aldermand Rd
Description: Monday through Friday Only
Location: Near Kent Rd - Linco
Budget:
Start Date: 11/08/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Alta Vista Ave
Description: 800 and 900 block of Alta Vista Ave
Location: Altavista Ave
Budget:
Start Date: 05/21/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Alta Vista, Blenheim Ave, Elliot Ave, 6th St SE, Bolling Ave, Monticello Ave, and Belmont Ave.
Description: Short duration stops for manhole coating and inspection. The longest delay will be a turn lane closure at the intersection of Monticello Ave and Avon St for 40 minutes.
Location:
Budget:
Start Date: 09/23/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Altamont Cir
Description:
Location: Altamont Cir - Rooftop Services
Budget:
Start Date: 12/10/20
Project Manager: John Epper
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Altamont Circle
Description: Moving truck.
Location: 400 block of Altamont Circle
Budget:
Start Date: 09/14/19
Project Manager: Jenna Hummer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Altamont Circle
Description: POD
Location: 11 Altamont Cir
Budget:
Start Date: 08/14/19
Project Manager: Sam Somerville
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Altamont St
Description: Tree removal.
Location: 409 Altamont St
Budget:
Start Date: 10/07/19
Project Manager: James Walker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Altavista
Description:
Location: Altavista Ave between Meridian St and Monticello Ave
Budget:
Start Date: 09/19/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Altavista Ave
Description:
Location: 1105 Altavista Ave - Scotts Backhoe
Budget:
Start Date: 12/11/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Altavista Ave - Scotts Backhoe
Description: Disconnecting Water & Sewer.
Location: 600 Altavista Ave (Corner House)
Budget:
Start Date: 04/16/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Amherst - Momentum
Description:
Location:
Budget:
Start Date: 01/17/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Amherst St
Description:
Location: Amherst St - Momentum
Budget:
Start Date: 01/10/22
Project Manager: Scott Kiser
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Amherst St
Description:
Location: Meadow St to Rose Hill Dr - Linco
Budget:
Start Date: 01/14/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Amherst St
Description:
Location: Amherst St
Budget:
Start Date: 03/15/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Amherst St
Description: Sidewalk repair work.
Location: 1600 Block of Amherst St - Linco
Budget:
Start Date: 08/30/21
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Amherst St
Description:
Location: Between Augusta St and Rose Hill Dr - Lee Bldg Co
Budget:
Start Date: 10/11/21
Project Manager: Mike Kelly
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Amherst St
Description: Installing water meters.
Location: Amherst St near Amherst Commons and Greenway Rd
Budget:
Start Date: 09/02/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Amherst St
Description: Installation of new water lines for the City residents. Residents will have access to their homes throughout the duration of the project. Area impacted is from Greenway to Amherst Commons.
Location: Amherst St
Budget:
Start Date: 05/13/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Amherst St - S.L. Williamson
Description: Milling and Paving
Location:
Budget:
Start Date: 10/13/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Amherst Street
Description: WB lane, sidewalk, parking closure to trim tress on the greenleaf site on Amherst.
Location: Between Augusta St and Rose Hill Drive
Budget:
Start Date: 02/13/19
Project Manager:
Status: Archived Closure
Comments: Flagging operation to maintain lane closure.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Anderson St
Description:
Location: 809 Anderson St
Budget:
Start Date: 07/25/19
Project Manager: Mike Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Angus Rd
Description: Water line repair.
Location: 2100 Angus Rd.
Budget:
Start Date: 06/02/19
Project Manager: Mike Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Angus Rd
Description: Partial closure for sewer and water line installation.
Location: 2305 Angus Rd
Budget:
Start Date: 08/12/19
Project Manager: Ron Rohr
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Angus Rd
Description: This is a sidewalk closure that is not in excess of 48 hours.
Location: Angus Rd - Digs, Inc
Budget:
Start Date: 10/19/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Antoinette Ct - Linco
Description: FY21 San Sewer Replacement
Location: NE side of Antoinette Ct
Budget:
Start Date: 05/17/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Antoinette St
Description:
Location: At the Shamrok Rd intersection - Linco
Budget:
Start Date: 08/02/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Apple Tree Rd
Description: Milling and paving operation.
Location: 107 Apple Tree Rd - SL Williamson
Budget:
Start Date: 11/04/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Apple Tree Rd
Description: Sidewalk repairs.
Location:
Budget:
Start Date: 09/24/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Appletree Rd
Description: Paving
Location: Between Fontaine Ave and Stadium Rd
Budget:
Start Date: 10/05/20
Project Manager: Andrew Owens
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Arlington Blvd
Description: Street closure with flaggers. Parking spaces reserved along the westbound lane of Arlington Blvd between Milmont St and Emmet St. Sidewalk closure in excess of 48 hours.
Location: Between Milmont St and Emmet St - Linco
Budget:
Start Date: 05/06/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Arlington Blvd
Description:
Location: Between Milmont St and Emmet St - Linco
Budget:
Start Date: 05/11/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Arlington Blvd
Description:
Location: 1924 Arlington Blvd - Linco
Budget:
Start Date: 06/22/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Arlington Blvd
Description: POD
Location: 2401 Arlington Blvd
Budget:
Start Date: 07/24/19
Project Manager: Michael Haden
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Arlington Blvd
Description: POD
Location: 2401 Arlington Blvd. - POD
Budget:
Start Date: 02/07/20
Project Manager: Katharine Harbury
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Arlington Blvd - SL Williamson
Description: Asphalt repair
Location:
Budget:
Start Date: 11/29/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St
Description:
Location: At Bolling Ave - Linco
Budget:
Start Date: 06/12/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St
Description:
Location: Hinton Ave to Levy - TriState
Budget:
Start Date: 04/21/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St
Description:
Location:
Budget:
Start Date: 07/14/21
Project Manager: Rachel Setear
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St
Description: POD
Location: 500 block of Avon St - Private
Budget:
Start Date: 01/31/20
Project Manager: Carla Mangine
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St
Description:
Location: Monticello Ave to Montrose Ave - Linco
Budget:
Start Date: 03/30/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St
Description:
Location: In front of Fox's Cafe - Avon St - Digs, Inc.
Budget:
Start Date: 11/11/19
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St
Description: This is a sidewalk closure not in excess of 48 hours.
Location: Between Hinton Ave and Levy Ave
Budget:
Start Date: 10/24/19
Project Manager: Grethen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St
Description: Flagging operation for sewer repair.
Location: Avon St between Belmont and Hinton
Budget:
Start Date: 09/03/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St
Description: Center of Avon between Belmont and Hinton will be coned off for work in the manhole.
Location: Avon St between Belmont and Hinton
Budget:
Start Date: 09/13/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 110 Avon
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Avon St, Church St, and Emmet St
Description: Avon St and Church St Shoulder Closure 3/25 to 3/26 Emmet St Outside Lane Closure 3/27
Location: Avon and Church between Levy and Belmont; Emmet St near JPA - TriState Utilities
Budget:
Start Date: 03/25/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Azalea Dr
Description:
Location: 100 Azalea Dr - POD
Budget:
Start Date: 07/20/20
Project Manager: Thankful Cromartie
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barbour Dr
Description: Paving operation.
Location: Barbour Dr to Dead End - SL Williamson
Budget:
Start Date: 07/06/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks and Emmet Intersection
Description: Surveying intersection.
Location: Intersection of Emmet St and Barracks Rd.
Budget:
Start Date: 07/01/19
Project Manager: Joseph Wallace
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd
Description: Barracks Rd will be closed between Hessian Rd and Meadowbrook from 10pm - 1 am for paving. There will be alternating lane closures with no detour.
Location: On Barracks Rd between Hessian Rd and Meadowbrook Rd.
Budget:
Start Date: 07/31/19
Project Manager: Grethcen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd
Description: Barracks Rd will be closed between Hessian Rd and Meadowbrook from 10pm on Tuesday until 6am on Wednesday morning. Vehicles accessing Barracks Rd south of Emmett St will be detoured to Rte 250 and Dairy Rd to Rugby Rd. North bound vehicles on Barracks Rd needing to access Emmet St will be detoured to Rugby Rd and Dairy Rd to Rte 250. This will be night shift work in an attempt to mitigate traffic delays in the area.
Location: Corner of Barracks Rd at Emmet St on the CVS side.
Budget:
Start Date: 09/03/19
Project Manager: Calvin Dawson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd
Description: Flagging operation to patch roadway.
Location: Barrakcs Rd between Hessian Rd and Meadowbrooks Rd.
Budget:
Start Date: 08/11/19
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd
Description: Road closure either on 2/5 or 2/6 from 11pm to 6am. Detour will be through Emmet St and Dairy Rd/ Rugby Rd.
Location: Between Hessian Rd and Meadowbrook Rd
Budget:
Start Date: 02/05/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd
Description: connecting new sewer
Location: Emmet St & Barracks Intersection
Budget:
Start Date: 01/22/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd
Description: Road closure either on 2/5 or 2/6 from 11pm to 6am. Detour will be through Emmet St and Dairy Rd/ Rugby Rd.
Location: Between Hessian Rd and Meadowbrook Rd
Budget:
Start Date: 02/05/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd
Description: Cut in Stoplight loops
Location:
Budget:
Start Date: 10/24/18
Project Manager: Carlton Ayers
Status: Archived Closure
Comments: Night work

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd
Description: Mobile operation occupying one lane at a time.
Location: Between Meadowbrook Rd and Buckingham Rd - InfraMap
Budget:
Start Date: 06/22/20
Project Manager: Joseph Robinson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd
Description: Water main installation. Barracks Rd between Hessian Rd and Blue Ridge Rd will be close from Sunday evening at 9 PM to Friday at 5am from 11/30/2020 to 12/23/2020. Northbound drivers on Barracks Rd will be directed to detour using Hilltop Rd. Southbound drivers on Barracks Rd will be directed to detour using Meadowbrook Rd.
Location: Between Hessian Rd and Blue Ridge Rd - Linco
Budget:
Start Date: 11/30/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd - Ting Internet
Description: Fiber Installation
Location:
Budget:
Start Date: 04/10/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd and Emmitt St
Description: There will be a lane shift on Barracks Rd at the new CVS to enable construction on the CVS turn lane and entrance.
Location: On Barracks Rd between Hessian Rd and Meadowbrook Rd.
Budget:
Start Date: 08/01/19
Project Manager: Wayne Shaffer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd, Emmet St N, Meadowbrook Rd
Description: Sidewalk closures on NW and SE sides of Emmet St N and Barracks Rd intersection. Meadowbrook road closure off of Barracks Rd.
Location:
Budget:
Start Date: 11/04/18
Project Manager: Cary Bowman
Status: Archived Closure
Comments: Periodic overhead work.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barracks Rd.
Description: Shoulder of NB lane closed for water line work.
Location: Between Hessian Rd and Meadowbrook Rd
Budget:
Start Date: 01/31/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Barrakcs Rd
Description: Right turn lane east bound on Barracks Rd into the CVS store will be temporarily closed.
Location: Right lane east bound on Barracks Rd.
Budget:
Start Date: 07/15/19
Project Manager: Wayne Shafer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Baylor Ln
Description:
Location: 146 Baylor Ln - Snow's Nursery
Budget:
Start Date: 12/02/20
Project Manager: Tammy Judge
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belleview Ave
Description: 2 of 5 days worth of permitting used. 3 days available due to inclement weather.
Location:
Budget:
Start Date: 02/04/21
Project Manager: Jim McGennis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belleview Ave and River Rd
Description: Installing a sidewalk.
Location: 1324 Belleview Ave - LS Carolinas
Budget:
Start Date: 11/08/21
Project Manager: Christine Vaughn
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belmont Ave
Description:
Location: 759 Belmont Ave
Budget:
Start Date: 09/13/20
Project Manager: Elaine Oakey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belmont Ave
Description: Home repairs.
Location: 909 Belmont Ave
Budget:
Start Date: 06/10/19
Project Manager: Jesse Roach
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belmont Ave
Description: Dumpster.
Location: 800 block of Belmont Ave
Budget:
Start Date: 09/09/19
Project Manager: Joseph Celentano
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belmont Ave
Description: POD, parking space closure
Location:
Budget:
Start Date: 10/19/18
Project Manager: Amy Gardner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belmont Ave & Rialto St
Description: Sidewalk corner ADA ramp removal and replacement. sidewalk closure.
Location: NE corner of Belmont Ave and Rialto St
Budget:
Start Date: 03/19/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belmont Ave/Church St
Description: Placing two sanitary sewer manholes using a flagging operation for traffic control.
Location: Belmont Ave and Church St
Budget:
Start Date: 08/19/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belmont Avenue
Description: 1 parking spot closure in front of school for dumpster
Location:
Budget:
Start Date: 06/13/18
Project Manager: Jalil Ershadi
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belmont Bridge Project Pedestrian Tunnel
Description: The existing pedestrian tunnel to/from the Downtown Mall via the Ting Pavilion on Water Street will be closed until late September 2022. The detour route will be along the southern sidewalk on Water Street to the existing crosswalk at the Downtown Transit Station. A ramp and a staircase is located west of the Downtown Transit Station which connects to the Downtown Mall.
Location: The existing pedestrian tunnel to/from the Downtown Mall via the Ting Pavilion on Water Street
Budget:
Start Date: 08/23/22
Project Manager: City Of Charlottesville
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Belmont Bridge Replacement
Description:
Location: Avon/Garret/Levey/Market/Water Streets
Budget:
Start Date: 12/01/21
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Birdwood Rd
Description:
Location: 1005 Birdwood Rd - Backhoe Bobs
Budget:
Start Date: 10/25/21
Project Manager: Darrin Duvalois
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Blenheim Ave
Description: POD Unit
Location: 700 Block of Blenheim Ave
Budget:
Start Date: 05/04/19
Project Manager: Tyler Chappel
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Blenheim Ave
Description: Parking
Location: 1000 block Blenheim Ave
Budget:
Start Date: 06/27/19
Project Manager: Kathryn Boudouris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Blue Ridge Rd
Description:
Location: 1919 Blue Ridge Rd - Monarch Concrete
Budget:
Start Date: 04/14/20
Project Manager: Mike Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Bolling Ave
Description: The street closure will be closed to thru traffic and a detour will be provided to Meridian St and Rialto St.
Location: Between Rialto St and Castalia St - Linco
Budget:
Start Date: 08/17/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Bolling Ave
Description: This street and parking spot closure is approved for Monday through Friday 7a to 5pm.
Location: Meridian to Monticello Ave - Linco
Budget:
Start Date: 01/25/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Bolling Ave
Description: Street closed to thru traffic for water meter installation.
Location: Bolling Ave - Linco
Budget:
Start Date: 01/20/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Bolling Ave
Description:
Location:
Budget:
Start Date: 08/29/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments: Sanitary CIPP rehab for city

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Booker St
Description: This is a sidewalk and parking spot closure not in excess of 48 hours.
Location: 620 Booker St - Queen CIty Silviculture
Budget:
Start Date: 07/14/21
Project Manager: Jason LaRose
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Brandywine Dr
Description:
Location: 2214 Brandywine Dr - Wayne Gentry
Budget:
Start Date: 03/16/21
Project Manager: Wayne Gentry
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Brandywine Dr
Description: Paving
Location: Brandywine Dr - SL Williamson
Budget:
Start Date: 11/18/19
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Brandywine Dr
Description:
Location: 1630-1632 Brandywine Dr
Budget:
Start Date: 10/01/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Brandywine Dr - Scott's Backhoe
Description: Emergency Sewer Line Repair
Location: Brandywine Dr. between Glenn Ct. & Melissa Pl.
Budget:
Start Date: 07/18/23
Project Manager:
Status: Archived Closure
Comments: Brandywine (between Glenn & Melissa) will be reduced to a One Lane Road during the repair with the appropriate signs and channelizing devices.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Brandywine Dr - SKN Contracting LLC
Description: Manhole rehab.
Location: 2206 Brandywine between Michael Pl. and Greenbrier Dr.
Budget:
Start Date: 08/07/23
Project Manager: Tri-state
Status: Archived Closure
Comments: Advanced warning signs and channelizing devices around work activity area.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Brandywine Dr.
Description:
Location: 1630-1632 Brandywine Dr
Budget:
Start Date: 09/13/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Brandywine Dr.
Description: Sidewalk repairs.
Location: Brandywine Dr.
Budget:
Start Date: 08/20/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Brandywine Drive
Description: new water meter for city. lane closure
Location:
Budget:
Start Date: 09/20/18
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Brook Rd
Description: Replacing pole. This is a partial SW and shoulder closure not in excess of 48 hours.
Location: Shoulder of Brook Rd between Greenbrier Dr and Hillwood Pl
Budget:
Start Date: 11/04/19
Project Manager: Carl Pilat
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Brookwood Dr
Description:
Location: From Ridge St to 5th St SW
Budget:
Start Date: 03/11/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cabell Ave
Description:
Location: Cabell Ave - Digs Inc
Budget:
Start Date: 01/15/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cabell Ave
Description: New water services.
Location: Cabell Ave between Preston Ave and Cambridge Square Apartments entrance.
Budget:
Start Date: 07/15/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cameron and Rothery
Description: Road closed between Rothery Rd and Minor Rd. Detour will direct traffic to Bollingwood Rd.
Location: Cameron Ln between Rothery and Minor
Budget:
Start Date: 10/25/19
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cameron Lane
Description: Road closure for sanitary and storm replacement. Detour through Bollingwood Rd.
Location: Cameron Ln & Rothery Rd intersection
Budget:
Start Date: 04/23/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cameron Lane
Description:
Location: Cameron Lane between Ivy Road and Minor Road
Budget:
Start Date: 01/09/19
Project Manager: Department of Utilities
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cameron Lane/Bollingwood Rd
Description: Installation of new fire hydrant assembly
Location: Road closure at Cameron & Bolling intersection. Sidewalk closure along west
Budget:
Start Date: 10/23/18
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cameron Ln
Description: Manhole repair
Location: Cameron Ln at Rothery Rd
Budget:
Start Date: 03/08/21
Project Manager: Tommy Burke
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cameron Ln
Description:
Location: Rothery to Dogwood - Commonwealth Excavating
Budget:
Start Date: 02/01/21
Project Manager: Tommy Burke
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cameron Ln
Description:
Location: Between Ivy Rd and Rothery Rd - Commonwealth Excavating
Budget:
Start Date: 07/31/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cameron Ln and Rothery Rd
Description: This is a road closure with a detour.
Location: Cameron Ln and Rothery Ln
Budget:
Start Date: 10/14/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cameron Ln and Rothery Rd
Description:
Location: Minor Rd to Ivy Rd
Budget:
Start Date: 03/04/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cameron Rd and Rothery Ln
Description:
Location:
Budget:
Start Date: 12/07/20
Project Manager: Tommy Burke
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carl Smith St
Description:
Location: Carl Smith St
Budget:
Start Date: 09/11/20
Project Manager: David Michaelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlotn Ave
Description:
Location: 1335 Carlton Ave - AG Dillard
Budget:
Start Date: 10/01/21
Project Manager: Roman Bridge
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlotn Rd
Description:
Location: Between Monticello Ave and Monticello Rd - Linco
Budget:
Start Date: 04/07/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton , Carl Smith, and Sunrise Park Lane Island
Description:
Location: The grass island surrounded by Carlton, Carl Smith, and Sunrise Park Ln.
Budget:
Start Date: 03/18/20
Project Manager: David Michaelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave
Description: The sidewalk closure will be active for two weeks or less for pedestrian safety while the contractor removes a retaining wall. The roadway is too narrow, and the neighborhood too inaccessible for the contractor to provide a detour or diversion at this location.
Location: Carlton Ave near Franklin St - KBS
Budget:
Start Date: 03/27/20
Project Manager: John Eagle
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave
Description:
Location: Between Nassau St and Mobile Home Park Rd - AG Dillard
Budget:
Start Date: 04/06/20
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave
Description:
Location:
Budget:
Start Date: 09/23/19
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave
Description: 2 parking space closure for dumpster
Location:
Budget:
Start Date: 11/19/18
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave
Description:
Location: Carlton View Apartments to Franklin St - KBS
Budget:
Start Date: 04/15/21
Project Manager: Meredith McMahon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave
Description:
Location: Between Franklin St and Nassau St - AG Dillard
Budget:
Start Date: 10/02/20
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave
Description:
Location: Between Franklin St and Nassau St - AG Dillard
Budget:
Start Date: 11/30/20
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave
Description:
Location: From East Trailer Park Entrance to Nassau St - AG Dillard
Budget:
Start Date: 10/19/20
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave
Description:
Location: Between Mobile Home Park entrance and Nassau St - AG Dillard
Budget:
Start Date: 04/27/20
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave
Description:
Location: Carlton Ave at Rives St - AG Dillard
Budget:
Start Date: 07/07/20
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave - AGDillard
Description:
Location: 1500 Carton Ave
Budget:
Start Date: 05/03/21
Project Manager: Roman Bridge
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Ave - Tri-state
Description:
Location: Intersection of Carlton Rd and Carlton Ave
Budget:
Start Date: 05/26/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Rd
Description: A short duration closure at 200 Carlton Rd to replace a pole in the month of November. Date is TBD.
Location: 200 Carlton Rd - Dominion
Budget:
Start Date: 11/01/21
Project Manager: Kelly Maxwell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton Rd
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: 200 Carlton Rd - Digs
Budget:
Start Date: 11/18/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carlton/Monticello - Linco
Description:
Location: Intersection of Carlton Rd and Monticello Rd
Budget:
Start Date: 05/12/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carrollton Terrace
Description: Curb, gutter, and sidewalk work
Location: Both sidewalks
Budget:
Start Date: 04/15/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Carter Ln
Description: Sewer lateral to main.
Location: Carter Ln - Dependable Home Improvement
Budget:
Start Date: 02/20/20
Project Manager: Darrick Harris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cartlon Ave
Description:
Location:
Budget:
Start Date: 03/24/21
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cartlon Ave
Description:
Location: 200 Carlton Rd - Digs
Budget:
Start Date: 12/02/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Castalia St
Description:
Location: Between Palatine and Rougemount Ave
Budget:
Start Date: 06/23/21
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Castalia St
Description:
Location:
Budget:
Start Date: 09/11/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Castillia - Lipton
Description:
Location:
Budget:
Start Date: 07/01/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cedar Hill Rd
Description:
Location: Cedar Hill Rd - Scotts Backhoe
Budget:
Start Date: 09/10/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cedar Hill Rd
Description: Shoulder operation, installing new water main for City
Location:
Budget:
Start Date: 11/19/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cedars Court
Description: Sidewalk repair.
Location: 1212 Cedars Court
Budget:
Start Date: 07/30/19
Project Manager: Luis Dorta
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cedars Court - Jacobs Group
Description:
Location:
Budget:
Start Date: 01/25/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cedars Ct
Description:
Location: 1212 Cedars Ct - POD
Budget:
Start Date: 07/30/20
Project Manager: Ryan Miller
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Center Ave
Description: Water main repair/replace.
Location: Center Ave - Linco
Budget:
Start Date: 07/12/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Center Ave
Description: Open to local traffic only.
Location:
Budget:
Start Date: 09/14/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Center Ave
Description:
Location: 1621 Center Ave - Dominion
Budget:
Start Date: 12/07/20
Project Manager: Lindsey Reininger
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chancellor St
Description: Tree removal.
Location: 167 Chancellor St - Momentum
Budget:
Start Date: 02/17/21
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chancellor St
Description:
Location: 167 Chancellor St - Momentum
Budget:
Start Date: 10/06/21
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chancellor St
Description:
Location: Chancellor St - Linco
Budget:
Start Date: 11/16/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chancellor St
Description:
Location:
Budget:
Start Date: 11/02/21
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chancellor St
Description: Installing a sidewalk.
Location: 167 Chancellor St - Momentum
Budget:
Start Date: 12/20/21
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chancellor St
Description: Pole removal.
Location: 136 Chancellor St
Budget:
Start Date: 08/06/19
Project Manager: Theresa Bryant
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chancellor St
Description: Chancellor St bank traffic will be detoured to the lower bank entrance. Chancellor St traffic will be detoured down Madison Ln.
Location: Chancellor St at St Pauls Memorial Church
Budget:
Start Date: 06/27/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chancellor Street - Alexander Nicholson
Description:
Location: 122 Chancellor Street
Budget:
Start Date: 07/06/23
Project Manager: Drew Dunnington
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chancellor Street - Alexander Nicholson
Description:
Location: 122 Chancellor Street
Budget:
Start Date: 05/08/23
Project Manager: Drew Dunnington
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chancellor Street - Digs
Description:
Location: 120 Chancellor Street
Budget:
Start Date: 07/24/23
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Charlton Ave
Description: Sidewalk improvements.
Location: 906 Charlton Ave
Budget:
Start Date: 07/03/19
Project Manager: Mike Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Charlton Ave
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: 700 Charlton Ave - Christian and Associates
Budget:
Start Date: 12/02/19
Project Manager: Dusty Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chelsea Dr
Description:
Location: 112 Chelsea Dr
Budget:
Start Date: 09/12/19
Project Manager: Michael Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chelsea Dr
Description: Sidewalk repair.
Location: 112 Chelsea Dr
Budget:
Start Date: 08/14/19
Project Manager: Michael Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chelsea Dr - S.L. Williamson
Description: Milling and Paving
Location:
Budget:
Start Date: 10/26/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave
Description: TTC 23.2 Lane closure with flaggers. City was not notified in advance.
Location:
Budget:
Start Date: 08/29/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave
Description:
Location: 1005 Cherry Ave - Vess
Budget:
Start Date: 12/15/21
Project Manager: Melissa Chapman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave
Description: This is a flagging operation Monday through Friday only.
Location: Between Spring Hill St and Jones St - Linco
Budget:
Start Date: 07/09/21
Project Manager: Troy Wrigth
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave
Description:
Location: 1513 Cherry Ave - Linco
Budget:
Start Date: 08/04/21
Project Manager: John Carson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave
Description:
Location: Cherry Ave at Broad Ave and Valley Rd - TriState
Budget:
Start Date: 04/05/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave
Description: Underground cable repairs. Flaggers and lane shift at this site.
Location: Cherry Ave and 5th St intersection.
Budget:
Start Date: 07/09/19
Project Manager: Curtis Bradby
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1720, 1634, 1619, 1606, 1524, 1419, 1408, 1224, 1202, 1008, 919, 818, 808, 601, 401,
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - Accumark
Description: Daylighting.
Location:
Budget:
Start Date: 11/29/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - Accumark
Description: Vacuum Utility Borings
Location: Cherry x 6th
Budget:
Start Date: 11/20/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - Arbor Life Pro Tree
Description: Tree Removal / Pruning
Location:
Budget:
Start Date: 04/06/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - Dominion
Description:
Location: Cherry between Forrest Hills and Rockcreek
Budget:
Start Date: 03/01/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cherry Ave - Linco
Description: Flagging operation for Sanitary Sewer Replacement.
Location: 1107 Cherry Ave
Budget:
Start Date: 04/19/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chesapeake St
Description: Tree trimming.
Location: 1700 Chesapeake St
Budget:
Start Date: 08/19/19
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chesapeake St.
Description: There will be only one lane during the closure times, flaggers will be present. Monday thru Friday only,
Location: 1317 Chesapeake St
Budget:
Start Date: 08/01/22
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chesapeake St.
Description: There will be only one lane during the closure times, flaggers will be present. Monday thru Friday only,
Location: 1317 Chesapeake St
Budget:
Start Date: 08/01/22
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Chesapeake St.
Description: There will be only one lane during the closure times, flaggers will be present. Monday thru Friday only,
Location: 1317 Chesapeake St
Budget:
Start Date: 08/01/22
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: City Hall Annex Lot
Description: Sprint Pavilion event parking closure
Location:
Budget:
Start Date: 09/30/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: City Hall Annex Lot
Description: Sprint Pavilion September Closures
Location:
Budget:
Start Date: 09/15/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments: September 15

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: City Hall Lot
Description: Sprint Pavilion September Closures
Location:
Budget:
Start Date: 09/15/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments: September 15

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: City Hall/Annex Lot
Description: vehicle parking space closure
Location:
Budget:
Start Date: 11/14/18
Project Manager: Joe Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Clark Elementary
Description:
Location: Belmont Ave: Between Castalia St and Clark Elementary Drive way
Budget:
Start Date: 08/01/22
Project Manager: Michael Smith/
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Clark Elementary
Description:
Location: Belmont Ave: Between Castalia St and Clark Elementary Drive way
Budget:
Start Date: 08/01/22
Project Manager: Michael Smith/
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cleveland Ave
Description: TTC 24.0 City was not notified in advance.
Location: 2506 Woodland Dr.
Budget:
Start Date: 08/29/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cleveland Ave
Description:
Location: The dead end area of Cleveland Ave - Habitat for Humanity
Budget:
Start Date: 04/15/20
Project Manager: Habitat for Humanity
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cleveland Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 112, 210 Cleveland Ave
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cleveland Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 112, 210 Cleveland Ave
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cleveland Ave - PennLine (Dominion)
Description: Tree Trimming
Location: 123 - 215
Budget:
Start Date: 04/15/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Coleman St
Description:
Location: 1011 Coleman St - CROFT Homes
Budget:
Start Date: 04/06/20
Project Manager: Dominick Montie
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description:
Location: Between 6th St NW and 4th St NW - Martin Horn
Budget:
Start Date: 03/27/20
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description:
Location: Commerce St - Dumpster - Martin Horn
Budget:
Start Date: 02/22/20
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description: Street closure with detour.
Location: Commerce St
Budget:
Start Date: 02/12/20
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description: Fire Marshall inspection.
Location: Commerce St - Martin Horn
Budget:
Start Date: 01/29/20
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description: Crane for construction materials. Traffic will be detoured around Commerce St.
Location: Between 6th St NW and 4th St NW - CHU Contracting
Budget:
Start Date: 11/20/19
Project Manager: CHU
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description: Road closure at Commerce St between 6th St NW and 4th St NW from 7am - 4pm.
Location: Commerce St
Budget:
Start Date: 11/11/19
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description:
Location: Commerce St - Martin Horn
Budget:
Start Date: 12/30/19
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description: Street closure for waterline installation.
Location: Commerce St - Momentum
Budget:
Start Date: 01/03/20
Project Manager: Mark Wagner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description: Road closure on Commerce St between 5th St NW and 4th St NW. Detour in place will route traffic to 6th St NW and W Main St. 7am - 5pm
Location: Commerce St between 5th St NW and 4th St NW
Budget:
Start Date: 08/13/19
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description:
Location: Commerce St
Budget:
Start Date: 10/04/19
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description: Sidewalk Closure. Removal of shorting from building
Location:
Budget:
Start Date: 12/03/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description: Working in conjunction with Public Works for water line repair.
Location: Commerce St between 4th and 6th Street
Budget:
Start Date: 05/13/19
Project Manager: Hans Harma
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description:
Location: 4th St NW to 5th St NW - Momentum
Budget:
Start Date: 06/23/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St
Description:
Location: Between 4th St NW and 6th St NW - Momentum
Budget:
Start Date: 05/06/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce St - Momentum
Description: Sewer Lateral Abandonment
Location: Commerce between 4th St NW & 5th St NW
Budget:
Start Date: 04/16/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce Street
Description: Street closure to place concrete pump.
Location:
Budget:
Start Date: 10/25/18
Project Manager: Daniel Coburn - Superintendant
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce Street
Description: Concrete pump placement on street for Quirk Hotel.
Location:
Budget:
Start Date: 02/09/19
Project Manager:
Status: Archived Closure
Comments: 5th Street traffic detour through 6th St NW Start date changed from 2/9 to 2/15

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce Street
Description: Street closure for placing concrete pump
Location: 400-500 blocks
Budget:
Start Date: 01/08/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce Street
Description: Crane
Location: 6th St NW to 5th St NW
Budget:
Start Date: 12/11/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Commerce Street
Description: Test dig at water main one lane closure and sidewalk closure
Location:
Budget:
Start Date: 09/17/18
Project Manager: Jordan Lehman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Concord Ave
Description: This is a street and sidewalk closure not in excess of 48 hours. Flaggers will be present for the street closure.
Location: 600 Concord Ave
Budget:
Start Date: 09/30/19
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Concord Ave
Description: Install of water laterals. The detour will direct drivers to Henry Ave as an alternate. Night work. Street and sidewalk closure not in excess of 48 hours.
Location: 600 block of Concord Ave
Budget:
Start Date: 10/13/19
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Concord Ave
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: 600 Concord Ave
Budget:
Start Date: 10/23/19
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Concord Ave
Description:
Location: 601 Concord Ave on the Harris St side of the building - SBH
Budget:
Start Date: 01/04/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Concord Ave and Forest St
Description: Closure with thru traffic allowed.
Location: 710 Concord Ave and Adjacent Forest St - Sup. Drywall
Budget:
Start Date: 12/07/21
Project Manager: Nancy Guzman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cottage Lane
Description: POD placement parking space closure
Location:
Budget:
Start Date: 09/27/18
Project Manager: David Favre
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cottage Ln - Old Farm Rd - Preston Ave - 14th St NW - Grady Ave
Description: Utility work within the roadway. Flaggers will be present during portions of the project. Grady Ave will be closed to thru traffic at Grady/15th St NW to Grady/13th St NW. There will be a detour in place during this closure routing drivers to Gordon Ave and back on to Grady Ave.
Location: Cottage Ln - Old Farm Rd - Preston Ave - 14th St NW - Grady Ave
Budget:
Start Date: 06/18/19
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments: Utility work within the roadway. Flaggers will be present during portions of the project. Grady Ave will be closed to thru traffic at Grady/15th St NW to Grady/13th St NW. There will be a detour in place during this closure routing drivers to Gordon Ave and back on to Grady Ave.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Court Square
Description: 5 parking closures for VA blood drive
Location:
Budget:
Start Date: 10/26/18
Project Manager: Candace Schoner - Marketing
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Court Square
Description: Crane operation to place items on the top of the building.
Location: Court Square
Budget:
Start Date: 05/07/19
Project Manager: Randy Craig
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Court Square
Description: Crane operation.
Location: 500 Court Square
Budget:
Start Date: 06/02/19
Project Manager: Randy Craig
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Court Square
Description: 6 parking space closure for crane
Location: 500
Budget:
Start Date: 04/07/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Court Square
Description:
Location: 500 Court Sq - Crane
Budget:
Start Date: 12/12/21
Project Manager: Jeff Shepard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cresmont Ave
Description: POD
Location: 2308 Cresmont Ave - POD
Budget:
Start Date: 11/05/20
Project Manager: Michael York
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Cynthianna Ave - Ting Internet
Description: Data Center Migration
Location:
Budget:
Start Date: 03/25/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dairy Rd
Description:
Location: Keith Valley Rd to Gentry Ln - Linco
Budget:
Start Date: 08/09/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dairy Rd
Description: Rte 250 Bypass inspections mobile right lane closures on Dairy
Location:
Budget:
Start Date: 09/21/18
Project Manager: Tom Vogt
Status: Archived Closure
Comments: Date Change

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Daivd Terr
Description: Weekday closure only.
Location: David Terr at Thomas Dr - Handley Exc
Budget:
Start Date: 12/02/21
Project Manager: Taylor Easter
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dale Ave
Description: Detour at Dale Ave will direct drivers around the rail road crossings to Preston Ave via Harris St and Forest St. This is expected to be reopened on the morning of 9/12/2019.
Location: Concord St and Dale Ave near Albemarle St Rail Road crossings
Budget:
Start Date: 09/11/19
Project Manager: Matt Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: David Terr
Description:
Location: West corner of the David Terr at Thomas Dr interseciton - Handley Exc
Budget:
Start Date: 09/21/21
Project Manager: Taylor Easter
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: David Terrace - Handley
Description: Closure being done to facilitate utility installation for development (sewer/water connections). Further Sidewalk closures will be needed in future to install new ADA features at the intersection of David Terrace and Thomas Drive.
Location: Thomas Drive and David Terrace
Budget:
Start Date: 04/28/21
Project Manager: David Stavitski
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: David Terrace - SL Williamson
Description: Milling & Paving
Location: Thomas Dr to End
Budget:
Start Date: 04/02/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dellmead Lane - SL Williamson
Description:
Location:
Budget:
Start Date: 06/08/21
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Denice Ln
Description:
Location: 100 Denice Ln - Dominion Energy
Budget:
Start Date: 09/13/21
Project Manager: Scotti Gobbi
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dice - Dominion
Description:
Location:
Budget:
Start Date: 03/02/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dice - Tristate
Description:
Location: Intersection of Dice and 6 1/2
Budget:
Start Date: 02/07/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dice St
Description:
Location: 620 Dice St - Albemarle Heating
Budget:
Start Date: 12/04/20
Project Manager: George Herring
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dice St
Description:
Location: 412 Dice St - Monarch Concrete
Budget:
Start Date: 11/30/20
Project Manager: Mike Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dice Street
Description: 3 parking space closure for delivery
Location: 601
Budget:
Start Date: 04/09/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dice Street
Description: 3 parking space closure for dumpster placement
Location: 600 block
Budget:
Start Date: 03/25/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dice Street
Description: Installing new water meter for City
Location:
Budget:
Start Date: 11/05/18
Project Manager: Brian Estes
Status: Archived Closure
Comments: Detour through 4th St SW, Oak Street, and Ridge St

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dice Street
Description: Street closure. Installing new water meter for city
Location:
Budget:
Start Date: 11/07/18
Project Manager: Brian Estes - Porject Manager
Status: Archived Closure
Comments: Detour along Oakmont St, Oak St, and Ridge St.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Douglas Ave
Description: Emergency sewer repair.
Location: 214 Douglas Ave - Scotts Backhoe
Budget:
Start Date: 02/10/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Druid Ave
Description: East bound lane closed and flagging operation installed.
Location: 918 to 1004 Druid Ave - CEVA Contractors
Budget:
Start Date: 04/13/20
Project Manager: Charlie Hurt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Druid Ave
Description:
Location: 1019 Druid Ave - Linco
Budget:
Start Date: 06/17/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Druid Ave
Description:
Location: Druid Ave near Monticello Ave - Linco
Budget:
Start Date: 08/05/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Druid Ave
Description:
Location:
Budget:
Start Date: 10/31/18
Project Manager: Charlie Hurt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Druid Ave
Description: POD
Location:
Budget:
Start Date: 09/06/18
Project Manager: Kyle Rodland
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Druid Ave
Description: The sidewalk closure will be on 10/10/2019. The street closure will be one hour on 10/10/2019 and 2 hours on 10/11/2019. This project is less than 48 hours.
Location: Druid Ave near Avon St
Budget:
Start Date: 10/10/19
Project Manager: Mike Brown
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Druid Ave
Description: A detour will be in place during the day on Druid Ave.
Location: 911-915 Druid Ave
Budget:
Start Date: 08/07/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Druid Ave
Description: Road closed in front of 911-915 Druid Ave. Detour provided to Alta Vista for thru traffic.
Location: 911-915 Druid Ave
Budget:
Start Date: 07/11/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Druid Ave
Description: Moving truck.
Location: 1000 block of Druid Ave
Budget:
Start Date: 07/27/19
Project Manager: Emily Eller
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Druid Ave - Linco
Description: Water Main Replacement
Location:
Budget:
Start Date: 03/04/24
Project Manager: Troy Wright
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dunova Ct
Description:
Location: Dunova Ct - SL Williamson
Budget:
Start Date: 06/19/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Dunova Ct
Description: Installing water main.
Location: Dunova Ct - Linco
Budget:
Start Date: 11/11/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High - Linco
Description:
Location:
Budget:
Start Date: 03/07/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High at 10th St NE Intersection
Description: This is a night shift closure from Sunday evening to Friday morning on the weeks of 7/19 and 7/26. Additional closure dates are 7/14 - 7/16. The detour will direct vehicles to use 11th St NE, E Jefferson St, and Grove Ave.
Location: Intersection of E High St and 10th St NE - Hourigan
Budget:
Start Date: 07/14/20
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description:
Location: E High St at 10th St NE - Hourigan
Budget:
Start Date: 06/15/20
Project Manager: Jesse Gutt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description: This is an emergency sidewalk closure not in excess of 48 hours.
Location:
Budget:
Start Date: 12/31/69
Project Manager: Marty Silman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description:
Location: 1139 E High St - Linco
Budget:
Start Date: 08/10/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description:
Location: Between 10th St NE and 9 1/2 St NE - FCC
Budget:
Start Date: 10/11/21
Project Manager: Robin Moriarty
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description:
Location: 411 E High St - Fiber Networks
Budget:
Start Date: 10/01/21
Project Manager: Jeff Williams
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description:
Location: Between 10th St NE and Lexington Ave - FCC
Budget:
Start Date: 06/28/21
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description:
Location:
Budget:
Start Date: 12/07/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description: Wye demo sanitary line.
Location: Intersection of E High St, 10th St NE, and Locust Ave
Budget:
Start Date: 09/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description: Flagging operation and sidewalk closure. Installing water meters.
Location: Between 4th St NE and Park St
Budget:
Start Date: 11/04/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description: Street and sidewalk closure with flagging operation. Installing water meters.
Location: Between 3rd St NE and 4th St NE
Budget:
Start Date: 11/11/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description: One lane closed with flaggers.
Location: E High St - Linco
Budget:
Start Date: 01/13/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description:
Location: South sidewalk on E high St between 10th St NE and 11th St NE
Budget:
Start Date: 08/28/19
Project Manager: Mark Wagner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description: Night work to access manhole.
Location: 1430 E High St
Budget:
Start Date: 09/17/19
Project Manager: Curtis bradley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St
Description: WB Lane shoulder closure for water line repair.
Location: E High St at Willow Dr
Budget:
Start Date: 05/01/19
Project Manager: Brina Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1101, 1130, 1301, 1423, 1428, 1517
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1101, 1130, 1301, 1423, 1428, 1517
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1101, 1130, 1301, 1423, 1428, 1517
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1101, 1130, 1301, 1423, 1428, 1517
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1101, 1130, 1301, 1423, 1428, 1517
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1101, 1130, 1301, 1423, 1428, 1517
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 1101, 1130, 1301, 1423, 1428, 1517
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - E Market St
Description: This is an intermittent closure to facilitate utlity locating and marking.
Location: E High St and E Market St - Various - Accumark
Budget:
Start Date: 01/04/21
Project Manager: James
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - Linco
Description: Sidewalk creation.
Location:
Budget:
Start Date: 02/12/24
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - Linco
Description: Sidewalk creation.
Location:
Budget:
Start Date: 02/12/24
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St - Scott's Backhoe
Description: Sewer Lateral Replacement
Location: 1328
Budget:
Start Date: 04/17/24
Project Manager:
Status: Active Closure
Comments: Detour w/ Flagger

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St x 4th St NE - Segra
Description: Over lash of fiber cables.
Location:
Budget:
Start Date: 03/26/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St x 4th St NE - Segra
Description: Over lash of fiber cables.
Location:
Budget:
Start Date: 03/26/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St x 4th St NE - Segra
Description: Over lash of fiber cables.
Location:
Budget:
Start Date: 03/26/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E High St x Park St - Segra
Description: Adjust Fiber Attachments on Dominion Poles
Location: Park St @ E High St from Intersection to 408 Park
Budget:
Start Date: 09/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St
Description:
Location: 703 E Jefferson St - Vess
Budget:
Start Date: 11/08/21
Project Manager: Melissa Chapman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St
Description:
Location: 255 E Jefferson St - Albemarle Heating and Air
Budget:
Start Date: 07/06/21
Project Manager: Alex Kavounas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St
Description:
Location: At 4th St NE - TriState
Budget:
Start Date: 08/10/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St
Description: This is a street and sidewalk closure with detours. 4th St SE from E High St to E Jefferson St will be closed. E Jefferson St from 4th St NE to Park St will be closed. Park St will remain open.
Location: Roads and sidewalk around Court Square (excl. Park St) - Albemarle County
Budget:
Start Date: 09/11/20
Project Manager: Blake Abplanalp
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St
Description: Construction equipment parking. Remodeling.
Location: 300 Block of E Jefferson St
Budget:
Start Date: 08/05/19
Project Manager: Ted Marrs
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St
Description: Sidewalk repair.
Location: 813 E Jefferson St
Budget:
Start Date: 06/19/19
Project Manager: Mike Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St
Description:
Location: 219 E Jefferson St
Budget:
Start Date: 11/12/19
Project Manager: Corin Phipps
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St
Description: This is a sidewalk and parking spot closure not in excess of 48 hours.
Location: E Jefferson St - VYTC
Budget:
Start Date: 11/20/19
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St
Description: This is a sidewalk closure not in excess of 48 hours.
Location: E Jefferson St - Albemarle Heating and Air
Budget:
Start Date: 02/25/20
Project Manager: Alex Kavounas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St
Description:
Location: 109 E Jefferson St - Bartlett Tree Experts
Budget:
Start Date: 02/28/20
Project Manager: James Walker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson St at 7th St NE
Description: This is a sidewalk closure not in excess of 48 hours.
Location: SOuth East Corner of E Jefferson St at 7th St NE - Southern Air
Budget:
Start Date: 04/19/21
Project Manager: Adam Phillips
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson Street - Grunley
Description:
Location: 600 Block of E Jefferson Street
Budget:
Start Date: 06/02/23
Project Manager: Kyle Lamers
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson Street - Grunley
Description:
Location: 600 Block of E Jefferson Street, Street closure on E Jefferson Street between Park and 7th
Budget:
Start Date: 06/27/23
Project Manager: Kyle Lamers
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Jefferson Street - Prillaman
Description:
Location: E Jefferson Street and 5th Street NE between 4th Street NE, E Market Street, and Park Street
Budget:
Start Date: 05/07/23
Project Manager: John Davis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main - Downtown
Description: Redoing store front on pedestrian mall
Location:
Budget:
Start Date: 10/09/18
Project Manager: Terry Ray-
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: SIdewalk closure for electrical work on Prime 109 (restaurant).
Location: 300 E Main St
Budget:
Start Date: 05/08/19
Project Manager: Jesse Woodson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: Removing items from roof.
Location: E Main St at 4th St (Bank and Bookstore)
Budget:
Start Date: 05/24/19
Project Manager: John Mason
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: Hood cleaning outside of business.
Location: E Main St between 4th and 5th St
Budget:
Start Date: 05/27/19
Project Manager: Kay Choi
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: Crane operation to place materials on top of building.
Location: Corner of 4th St SE and E Main St at Union Bank & Trust
Budget:
Start Date: 05/06/19
Project Manager: John Mason
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: 2 Parking Spot Closures
Location: E Main St - 400 Block
Budget:
Start Date: 06/14/19
Project Manager: EJ Radford
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description:
Location: 310 E Main St
Budget:
Start Date: 04/16/20
Project Manager: Joe Chiocca
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description:
Location: 412 E Main St - MARU
Budget:
Start Date: 03/06/20
Project Manager: Kay Choi
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: This is a sidewalk closure not in excess of 48 hours.
Location: 303 E Main St
Budget:
Start Date: 12/18/19
Project Manager: Michael Rodi
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: Painting.
Location: 110 E Main St
Budget:
Start Date: 11/04/19
Project Manager: Douglas Moore
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: This is a sidewalk closure not in excess of 48 hours. Installing a banner.
Location: Market St Garage Elevator - PhotoWorksGroup
Budget:
Start Date: 11/05/19
Project Manager: Ben Campbell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: Hoist materials to upstairs for construction/remodeling.
Location: 110-112 E Main St - Pedestrian Mall Area
Budget:
Start Date: 06/26/19
Project Manager: Kelsey Cox
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: Moving
Location: 400 E Main St
Budget:
Start Date: 08/26/19
Project Manager: Tommy Sparkman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description:
Location: E Main St
Budget:
Start Date: 08/13/19
Project Manager: Eugene Sullenberger
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: Delivery to Jefferson Theater
Location: In front of 110 E Main St
Budget:
Start Date: 08/14/19
Project Manager: Kelsey Cox
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description:
Location: 414 E Main St - VPI
Budget:
Start Date: 11/02/21
Project Manager: Kevin Obrien
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description:
Location: E Main St - Greer
Budget:
Start Date: 04/19/21
Project Manager: John Mason
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: Repair to the Paramount Theater sign.
Location: Ped Mall at Paramount - HighTech Signs
Budget:
Start Date: 02/10/21
Project Manager: Beth Robinson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description:
Location: 414 E Main St - VPI
Budget:
Start Date: 07/29/21
Project Manager: Kevin Obrien
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: This is a sidewalk closure not in excess of 48 hours. The purpose is hood cleaning.
Location:
Budget:
Start Date: 07/14/21
Project Manager: Kay
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description:
Location: 414 E Main St - VPI
Budget:
Start Date: 10/05/21
Project Manager: Kevin Obrien
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description:
Location: Ped Mall at VDM
Budget:
Start Date: 09/22/21
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Main St
Description: Painting exterior windows.
Location: 101 - 105 E Main St - Woodard Properties
Budget:
Start Date: 10/05/20
Project Manager: Chris Virgilio
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: 609 E Market St - Monarch
Budget:
Start Date: 05/25/20
Project Manager: Michael Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: Between 10th St NE and 9th St NE - Linco
Budget:
Start Date: 06/29/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: 1405 E Market St - Chad's Backhoe
Budget:
Start Date: 05/11/20
Project Manager: Chad Reoschling
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: 408 E Market St - Piedmont Paint
Budget:
Start Date: 09/27/21
Project Manager: Ben Birtle
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: 200 E Market St - Paramount Theater Parking
Budget:
Start Date: 09/09/21
Project Manager: Malcolm Dyson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: 408 E Market St - Luke & Sam Tree
Budget:
Start Date: 08/24/21
Project Manager: Sam Marshall
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: 9th St NE to Meade Ave - TriState
Budget:
Start Date: 06/24/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: This is a sidewalk closure not in excees of 48 hours.
Location: 610 E Market St - City of Charlottesville
Budget:
Start Date: 04/20/21
Project Manager: Jerry Allen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: 1215 E Market St - Dominion Energy
Budget:
Start Date: 03/31/21
Project Manager: Pam Johnson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: 1202 E Market St - SBH
Budget:
Start Date: 10/20/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location:
Budget:
Start Date: 12/08/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Glass repair.
Location: 401 E Market St
Budget:
Start Date: 08/13/19
Project Manager: Fontaine Halsey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Painting.
Location: 609 E Market St
Budget:
Start Date: 08/12/19
Project Manager: John Rafter
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Tree trimming.
Location: Corner of 2nd St NW and E Market St
Budget:
Start Date: 09/05/19
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Bus parking.
Location: In front of Lee Park
Budget:
Start Date: 10/12/19
Project Manager: Tomi Rogas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: E Market St at 2nd St NE and E Main St at 2nd St NW
Budget:
Start Date: 10/02/19
Project Manager: Theresa Bryant
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Parking spot.
Location: 1000 E Market St
Budget:
Start Date: 10/14/19
Project Manager: Susan Vinisky
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Moving Truck
Location: 600 Block of E Market St
Budget:
Start Date: 07/30/19
Project Manager: William Womack
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Tree down over sidewalk.
Location: 1200 E Market St
Budget:
Start Date: 07/29/19
Project Manager: Marty Silman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Moving.
Location: 1001 E Market St
Budget:
Start Date: 10/31/19
Project Manager: Julie Ballard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: Monsoon Siam - VYTC
Budget:
Start Date: 12/16/19
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Moving truck.
Location: 1000 E Market St - Private
Budget:
Start Date: 12/09/19
Project Manager: Joseph Burke
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Moving.
Location: 300 block -private citizen
Budget:
Start Date: 01/04/20
Project Manager: Katherine Rinne
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: 300 E Market St
Budget:
Start Date: 11/20/19
Project Manager: John Haas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description:
Location: 206 E Market St
Budget:
Start Date: 04/23/20
Project Manager: Joe Chiocca
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Lane closure with flaggers at 1125 E Market St.
Location: Between 11th St NE to Meade Ave - Linco
Budget:
Start Date: 04/20/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Courtyard renovation.
Location: E Market St - Monarch Concrete
Budget:
Start Date: 01/22/20
Project Manager: Mike Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St
Description: Glass replacement.
Location: 401 E Market St
Budget:
Start Date: 05/30/19
Project Manager: Fontaine Halsey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market St - City Of Cville Public Works
Description: Future brick removal, Tree pruning, and sidewalk replacement.
Location: 500 block of E. Market St x 5th St NE
Budget:
Start Date: 10/23/23
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street - JMR Library
Description:
Location: 201 E Market Street
Budget:
Start Date: 05/06/23
Project Manager: Heather Pehnec
Status: Archived Closure
Comments: Sidewalks unaffected

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street - Lumos Segra
Description:
Location: E Market Street between 7th Street NE and 9th Street NE, lance closure at 8th Street.
Budget:
Start Date: 07/19/23
Project Manager: Dean Scheidt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street - Lumos Segra
Description:
Location: E Market Street between 7th Street NE and 9th Street NE, lance closure at 8th Street.
Budget:
Start Date: 06/26/23
Project Manager: Dean Scheidt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street - Public Works
Description: Sidewalk Repair
Location: 1100 - 1106 E Market St
Budget:
Start Date: 08/16/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street - Queen Silviculture
Description:
Location: 307 E Market Street
Budget:
Start Date: 06/05/23
Project Manager: Jason LaRose
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street - Tri-State
Description: Storm Sewer Repair
Location:
Budget:
Start Date: 03/04/24
Project Manager:
Status: Archived Closure
Comments: WB Lane Closure

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street x 9th St NE - Caton
Description: Crossing signal replacement. Sidewalk / Intersection creation.
Location:
Budget:
Start Date: 01/30/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street x 9th St NE - Caton
Description: Crossing signal replacement. Intersection / Sidewalk creation.
Location:
Budget:
Start Date: 01/30/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street x 9th St NE - Caton
Description: Crossing signal replacement. Intersection / Sidewalk creation.
Location:
Budget:
Start Date: 01/30/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street x 9th St NE - Caton
Description: Crossing signal replacement. Intersection / Sidewalk creation.
Location:
Budget:
Start Date: 01/30/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street x 9th St NE - Caton
Description: Traffic Light Signal removal and transfer to new posts.
Location:
Budget:
Start Date: 01/30/24
Project Manager:
Status: Archived Closure
Comments: Temporary Road Detours accordingly.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street x 9th St NE - Caton
Description: Light Signal wiring.
Location:
Budget:
Start Date: 01/30/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Market Street x 9th St NE - Caton
Description: Belmont Bridge Active construction project.
Location: Southernmost sidewalk E Market between 8th St NE & 9th St NE
Budget:
Start Date: 01/02/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description: Paving operation.
Location: Between 10th St NE and Carlton Rd - SL Wiliamson
Budget:
Start Date: 04/02/21
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description:
Location: 10th St NE to City Walk - EGGC
Budget:
Start Date: 12/17/20
Project Manager: Brooke Dezio
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description: Milling and paving operation.
Location: Carlton Rd to 10th St - SL Williamson
Budget:
Start Date: 07/13/21
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description:
Location: Below Belmont Bridge - Mid-Atlantic
Budget:
Start Date: 09/21/21
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description:
Location: Between 4th St SE and 5th St SE - Fiber NS
Budget:
Start Date: 10/15/21
Project Manager: Jeff Williams
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description:
Location: Between 5th St SE and the 9th St Bridge (Belmont Bridge) - Fiber NS
Budget:
Start Date: 10/15/21
Project Manager: Jeff Williams
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description:
Location: Between 1st St S and 2nd St SE - Faulconer
Budget:
Start Date: 05/15/20
Project Manager: Robin Moriarty
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description: Eastbound traffic will be detoured to E Market St.
Location: E Water St - Richmond Primoid (crane)
Budget:
Start Date: 07/29/20
Project Manager: Bill Rose
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: Between 3rd and 4th St - Fitch Services
Budget:
Start Date: 08/21/20
Project Manager: Jason Davis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description:
Location: 317 E Water St
Budget:
Start Date: 05/23/19
Project Manager: Robert Burgess
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description: Local traffic and buses will have access.
Location: Between City Walk and 9th St - DIgs, Inc.
Budget:
Start Date: 03/02/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description:
Location: 300 E Water St
Budget:
Start Date: 03/06/20
Project Manager: Jill Mumie
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description: Event
Location: 123 E Water St - Live Arts
Budget:
Start Date: 12/20/19
Project Manager: Shelby Edwards
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St
Description:
Location: 700 Block of E Water St
Budget:
Start Date: 06/01/19
Project Manager: Eric Kunkel
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St - 1hr. - Schnabel
Description: Temporary street/sidewalk closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: E. of Belmont Bridge
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St - Albemarle Heating & Air
Description: Boom lift in street to install HVAC piping.
Location: 1000 block Water St
Budget:
Start Date: 02/01/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St - Belmont Bridge - Caton
Description: EB Lane Closure. Belmont Bridge Replacement Project.
Location: West of bus station terminal
Budget:
Start Date: 01/01/21
Project Manager: City Of Charlottesville
Status: Active Closure
Comments: For the most up-to-date closure information for the Belmont Bridge please visit the city's traffic advisory page: https://va-charlottesville.civicplus.com/900/Traffic-Advisories-Sidewalk-Closures For after hours issues please reach out to: Public Utilities Dispatch 434-970-3800

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water St - Belmont Bridge - Caton
Description: EB Lane Closure. Belmont Bridge Replacement Project.
Location: West of bus station terminal
Budget:
Start Date: 01/01/21
Project Manager: City Of Charlottesville
Status: Active Closure
Comments: For the most up-to-date closure information for the Belmont Bridge please visit the city's traffic advisory page: https://va-charlottesville.civicplus.com/900/Traffic-Advisories-Sidewalk-Closures For after hours issues please reach out to: Public Utilities Dispatch 434-970-3800

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E Water Street - Digs
Description:
Location: E Water St between 10th St and City Walk Appartments
Budget:
Start Date: 05/24/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. High Street
Description: Dumpster, 2 parking space closure
Location: 315
Budget:
Start Date: 01/22/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Jefferson
Description: 2 Parking space closure for wedding
Location:
Budget:
Start Date: 10/06/18
Project Manager: Regina Coleman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Jefferson
Description: 2 parking space closures for wedding ceremony
Location:
Budget:
Start Date: 10/12/18
Project Manager: Linda Hildebrand
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Jefferson
Description: Heating/AC Repair
Location: 400 block
Budget:
Start Date: 08/23/18
Project Manager: Louise Trudel
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Jefferson
Description: 2 spots for moving trucks
Location:
Budget:
Start Date: 08/14/18
Project Manager: Marilyn Perkins
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Jefferson St
Description: Sanitary CIPP rehab for city
Location:
Budget:
Start Date: 08/14/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Jefferson St
Description: Sanitary CIPP rehab for city
Location:
Budget:
Start Date: 08/13/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Jefferson St
Description: 2 parking space closure
Location: 200 block
Budget:
Start Date: 02/04/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Jefferson St
Description: 3 parking space closure for tree removal
Location: 1000 block
Budget:
Start Date: 04/08/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Main
Description: Maintenance of marquee lighting system
Location: 3 ft perimeter around the marquee of theater
Budget:
Start Date: 08/13/18
Project Manager: Ryan Peacher - Systems Technician
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market
Description: Pavilion event closure
Location:
Budget:
Start Date: 08/17/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments: 700 block

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market
Description: Sprint Pavilion September closures
Location:
Budget:
Start Date: 09/02/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments: September 2,15,25,27,28,30

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market
Description: attach fiber cable to existing poles. Parking lane closure
Location: parking lane from 2nd St to 4th St
Budget:
Start Date: 10/16/18
Project Manager: Bryan McDearmon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market
Description: Parking space closure
Location: 200 block
Budget:
Start Date: 03/28/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market
Description: 2 parking space closure
Location:
Budget:
Start Date: 11/16/18
Project Manager: Robert Michel
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market St
Description: Paramount April event parking closure
Location: 200 block
Budget:
Start Date: 04/06/19
Project Manager:
Status: Archived Closure
Comments: April 6, 8-20, 24, 26-28

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market ST
Description: Pavilion event parking closures
Location:
Budget:
Start Date: 10/05/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments: October 5,13-14,18

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market St
Description: Bus parking closure
Location:
Budget:
Start Date: 10/27/18
Project Manager: Dawn Peters
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market St
Description: Sanitary CIPP rehab for city
Location:
Budget:
Start Date: 08/16/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market St
Description: Sanitary CIPP rehab for city
Location:
Budget:
Start Date: 08/14/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market St
Description: Sanitary CIPP rehab for city
Location:
Budget:
Start Date: 08/15/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market St - 100 Block
Description: Bus Parking Closure
Location:
Budget:
Start Date: 10/05/18
Project Manager: Dawn Peters - Visitor Relations Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market Street
Description: Paramount Event Parking Closure Dates
Location:
Budget:
Start Date: 10/02/18
Project Manager:
Status: Archived Closure
Comments: October 2-5,9-14,19,22-23,24-26,28

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market Street
Description: Loading Zone parking closure, moving truck
Location: Loading Zone
Budget:
Start Date: 10/10/18
Project Manager: Robert Rosarid - Dispatch Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market Street
Description: The Paramount Event Parking Requests
Location:
Budget:
Start Date: 09/06/18
Project Manager: Robert Benjamin
Status: Archived Closure
Comments: September 6,12,14,16,21,23,26-28,30

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market Street
Description: Event Parking closure
Location: 200 block
Budget:
Start Date: 12/07/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market Street
Description: Moving Truck parking space closure
Location:
Budget:
Start Date: 10/20/18
Project Manager: Denise Postlethweight
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market Street
Description: The Paramount Event Parking closure
Location: 200 Block
Budget:
Start Date: 12/01/18
Project Manager: NDS
Status: Archived Closure
Comments: December 1-2,4-12

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Market Street
Description: E. Market Street will be closed for a short duration to remove a tree from overhead utility lines.
Location: E. Market Street between Carlton Rd and Meade Ave
Budget:
Start Date: 07/30/19
Project Manager: Public Service
Status: Archived Closure
Comments: Detour will use 12th Street NE and Jefferson Ave.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water St
Description: The Jefferson April event parking closures
Location: 100 block
Budget:
Start Date: 04/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water St
Description: The Jefferson April event parking closures
Location: 100 block
Budget:
Start Date: 04/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water St
Description: The Jefferson April event parking closures
Location: 100 block
Budget:
Start Date: 04/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water St
Description: The Jefferson April event parking closures
Location: 100 block
Budget:
Start Date: 04/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water St
Description: The Jefferson April event parking closures
Location: 100 block
Budget:
Start Date: 04/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water St
Description: The Jefferson April event parking closures
Location: 100 block
Budget:
Start Date: 04/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water Street
Description: Construction access and safety
Location: 10th Street NE to City Walk Way
Budget:
Start Date: 03/01/19
Project Manager:
Status: Archived Closure
Comments: March- April extension

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water Street
Description: Manhole access
Location: 400 & 500 block of E. Water
Budget:
Start Date: 04/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water Street
Description: Construction storage parking space closure
Location: 700 block
Budget:
Start Date: 03/01/19
Project Manager:
Status: Archived Closure
Comments: March extension

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water Street
Description: Sidewalk repairs - sidewalk will be closed, traffic shifted to allow work within ROW, two way traffic to remain.
Location: 400 block of E. Water Street
Budget:
Start Date: 05/28/19
Project Manager: Public Service
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E. Water Street
Description:
Location: 213 E. Water
Budget:
Start Date: 06/28/21
Project Manager: Shaun Jakiel
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E.High Street
Description: Access existing manhole for utility work. West bound lane closure
Location: West Bound Lane. 98' from intersection
Budget:
Start Date: 10/25/18
Project Manager: Theresa Bryant - OSP Engineer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E.Main / Pedestrian Mall
Description: Access for vehicle to clean restaurant hood.
Location: 303, Pedestrian Mall
Budget:
Start Date: 01/29/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E.Market
Description: Bus parking, 2 parking space closure
Location:
Budget:
Start Date: 10/23/18
Project Manager: Dawn Peters - Visitor Relations Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: E.Water St
Description: 2 parking space closure for repair on 317 E.Water St
Location:
Budget:
Start Date: 11/02/18
Project Manager: Hock Hockensmith
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Earhart St - S.L. Williamson
Description: Milling and Paving
Location:
Budget:
Start Date: 10/18/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Early St - S.L. Williamson
Description: Milling and Paving
Location:
Budget:
Start Date: 10/12/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: East Jefferson
Description:
Location: 229 East Jefferson
Budget:
Start Date: 10/25/19
Project Manager: Keith Nordstrom
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: East Market Street
Description: March event parking closures
Location: 200 block
Budget:
Start Date: 03/01/19
Project Manager:
Status: Archived Closure
Comments: Closure dates: March. 3-14,20-23

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: East Water St - Digs
Description:
Location: E Water St between 10th St and City Walk Appartments
Budget:
Start Date: 05/17/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: East Water Street
Description: March event parking closures
Location: 100 block
Budget:
Start Date: 03/01/19
Project Manager:
Status: Archived Closure
Comments: Closure dates: March 1,2,7-10,14-16,22-24,28-31

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elkhorn Rd
Description:
Location:
Budget:
Start Date: 01/25/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliewood Ave
Description:
Location: Elliewood Ave - VYTC
Budget:
Start Date: 06/09/20
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave
Description:
Location:
Budget:
Start Date: 01/14/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave
Description: POD
Location: Elliot Ave
Budget:
Start Date: 12/04/19
Project Manager: Hanna Stensby
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave
Description: This is an emergency sewer dig for a resident. The closure is not in excess of 48 hours.
Location: 614 Elliot Ave - Scotts Backhoe
Budget:
Start Date: 01/29/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave
Description:
Location: 813 Elliot Ave - Scotts Backhoe
Budget:
Start Date: 01/21/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave
Description: POD
Location: 700 Elliot Ave
Budget:
Start Date: 09/10/19
Project Manager: Kyvory Henderson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 104, 145, 1st, 407
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 104, 145, 1st, 407
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 104, 145, 1st, 407
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 104, 145, 1st, 407
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave - Accumark
Description: air vacuum testing for utilities location.
Location:
Budget:
Start Date: 11/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave - Linco
Description: Sidewalk creation.
Location:
Budget:
Start Date: 03/11/24
Project Manager: Troy Wright
Status: Archived Closure
Comments: TTC 19.2 Lane closure w/ Weave.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliot Ave - Linco
Description: Sidewalk creation.
Location:
Budget:
Start Date: 03/11/24
Project Manager: Troy Wright
Status: Archived Closure
Comments: TTC 19.2 Lane closure w/ Weave.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliott Ave
Description:
Location: Between Ware St and 6th St - Lambert Cable
Budget:
Start Date: 12/13/21
Project Manager: Chris Keister
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Elliott Ave
Description: WB lane of Elliott between Rialto and Monticello is closed for manhole rehab. Flaggers will maintain one lane EB and WB traffic.
Location: Between Rialto and Monticello
Budget:
Start Date: 02/27/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Closure for CVS project on corner of Emmet St and Barracks Rd.
Location: Emmet St at Barracks Rd
Budget:
Start Date: 04/05/19
Project Manager: Ron Bell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Filling potholes along Emmet St.
Location: Emmet St near Ivy Rd
Budget:
Start Date: 05/01/19
Project Manager: Bryan Rieckamnn
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: SB Emmet Street right lane will be closed from the Kroger outlet to a couple meters before the intersection. Emmet St Barracks Rd's WB middle/turning lane before the Emmet St intersection will be also be closed to not allow any traffic to enter the SB Emmet's right lane.
Location: SB lane, Kroger outlet through intersection
Budget:
Start Date: 02/07/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: SB Emmet Street right lane will be closed from the Kroger outlet to a couple meters before the intersection. Emmet St Barracks Rd's WB middle/turning lane before the Emmet St intersection will be also be closed to not allow any traffic to enter the SB Emmet's right lane.
Location: SB lane, Kroger outlet through intersection
Budget:
Start Date: 02/07/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: SB Emmet Street right lane will be closed from the Kroger outlet to a couple meters before the intersection. Emmet St Barracks Rd's WB middle/turning lane before the Emmet St intersection will be also be closed to not allow any traffic to enter the SB Emmet's right lane.
Location: SB lane, Kroger outlet through intersection
Budget:
Start Date: 02/07/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: The north bound lanes of Emmet St near CVS will be receiving milling and paving treatment between 9am and 3pm on 8/30 and 9/3/2019. One lane will remain open during construction. Work will not be conducted during the weekend.
Location: Emmet St at Barracks Rd northbound lanes near CVS.
Budget:
Start Date: 09/10/19
Project Manager: Calvin Dawson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Striping crosswalks.
Location: Emmet St between Thomson Ln and Ivy Rd
Budget:
Start Date: 08/20/19
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: 0 Emmet St on the corner of Emmet St and Ivy Rd
Budget:
Start Date: 09/03/19
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Emmet St between McCormick Rd bridge to Ivy Rd will be closed from August 20-21. The detour will direct drivers to Jefferson Park Ave and W Main St. This closure operation is for re-striping the pavement in the area.
Location: Emmet St from McCormick Rd Bridge to Ivy Rd.
Budget:
Start Date: 08/20/19
Project Manager: Bryan Rieckman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Turn lane extension.
Location: Emmet St at Barracks Rd Turn Lane
Budget:
Start Date: 08/19/19
Project Manager: Wayne Shafer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Left and right lane closures for bridge inspections.
Location: Emmet St below RT 250
Budget:
Start Date: 08/22/19
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Sanitary sewer inspection. Flaggers present. Night work will occur at the intersection of Emmet St And Ivy Rd from 9pm to 5am.
Location: Emmet St from University Ave to Thompson Rd
Budget:
Start Date: 07/24/19
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: Emmet St at Carruthers Hall (Northbound outside lane)
Budget:
Start Date: 07/17/19
Project Manager: Paige Sanford
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: Emmet St from Ivy Rd to Sprigg Ln
Budget:
Start Date: 07/12/19
Project Manager: Bryan Rieckman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: Between Sprigg Ln and Thomson Rd - Commonwealth Excavating
Budget:
Start Date: 05/01/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: This is a sidewalk closure not in excess of 48 hours.
Location: Emmet St sidewalk between Wise and Carruther's Hall.
Budget:
Start Date: 11/07/19
Project Manager: Paige Sanford
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: NB and SB at RT 250 over pass - Kokosing
Budget:
Start Date: 02/22/21
Project Manager: Brandon Herbert
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Traffic travelling southbound will be required to shift to one lane during the day.
Location: Emmet St north of Ivy Rd - DSI
Budget:
Start Date: 06/29/21
Project Manager: David McCoy
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: 914 Emmet St - Faulconer
Budget:
Start Date: 07/19/21
Project Manager: Paige Sanford
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: NB lane of Emmet St with a Merge - FCC
Budget:
Start Date: 09/20/21
Project Manager: Zachary Herman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: Emmet St below RT 250 overpass - Mid-Atlantic
Budget:
Start Date: 08/25/21
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: Between Massie Rd and Ivy Rd - FCC
Budget:
Start Date: 08/26/21
Project Manager: Zachary Herman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: Between Massie Rd and Ivy Rd - FCC
Budget:
Start Date: 08/24/21
Project Manager: Zachary Herman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Sidewalk closure for this closure is under a different entry.
Location: Between Massie Rd and Ivy Rd - FCC
Budget:
Start Date: 08/23/21
Project Manager: Zachary Herman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: 918 Emmet St - Faulconer
Budget:
Start Date: 08/09/21
Project Manager: Paige Sanford
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: At Barracks - InfraMap
Budget:
Start Date: 06/01/20
Project Manager: Richard Sodan
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: Between Stadium Rd and Stadium Rd - Commonwealth Exc
Budget:
Start Date: 05/04/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: This is a weekday closure only.
Location: 405 Emmet St - Canterbury for UVA
Budget:
Start Date: 07/20/20
Project Manager: Erika Lamm
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: Emmet St at Stadium Rd - Commonwealth Excavating
Budget:
Start Date: 07/13/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Sidewalk repair. This closure is not in excess of 48 hours.
Location: 1617 Emmet St - Digs, Inc
Budget:
Start Date: 07/15/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: Emmet St below RT 250 overpass - Mid-Atlantic
Budget:
Start Date: 08/27/20
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location: Emmet St at Wise St - Faulconer
Budget:
Start Date: 08/05/20
Project Manager: Paige Sanford
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: This is a mobile operation to install cable facilities. This closure is not in excess of 48 hours.
Location: Between Barracks Rd and Ivy Rd - Lumos
Budget:
Start Date: 10/05/20
Project Manager: Jared Morris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description: Northbound lane outside lane closure with a merge.
Location:
Budget:
Start Date: 09/01/20
Project Manager: Paige Sanford
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St
Description:
Location:
Budget:
Start Date: 09/21/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St - Faulconer
Description:
Location: Emmet between Rothery and Lambeth Lane
Budget:
Start Date: 06/04/21
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St - Faulconer
Description:
Location:
Budget:
Start Date: 02/07/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St - Hourigan
Description:
Location: West side of Emmet St just south of Thomson Road
Budget:
Start Date: 12/01/21
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St - Rice Associates
Description: Underground LIDAR surveying. Did not Notify City Traffic personnel in advance.
Location:
Budget:
Start Date: 08/31/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St and Barracks Rd
Description:
Location: Near the intersection of Barracks Rd and Emmet St - Timmons
Budget:
Start Date: 06/30/20
Project Manager: Joe Robinson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St and Ivy Rd
Description:
Location: The intersection of Emmet St and Ivy Rd - FCC
Budget:
Start Date: 08/29/21
Project Manager: Zachary Herman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St and Ivy Rd
Description: The east bound left turn lane on Ivy Rd to Emmet St will be closed. The northbound lane of Emmet St from Ivy Rd to Masssie Rd will be closed and drivers will be detoured to Copeley Rd.
Location: Intersection of Emmet St and Ivy Rd - FCC
Budget:
Start Date: 09/20/21
Project Manager: Zachary Herman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St N
Description:
Location: Southbound right turn lane from Angus Rd to RT 250 on-ramp - Digs inc
Budget:
Start Date: 08/12/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St N
Description: East sidewalk closed on Emmet St N between Massie Rd and Arlington Blvd for water meter installation.
Location: Emmet St N between Massie Rd and Arlingotn Blvd
Budget:
Start Date: 06/17/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St N (NB) - F&R
Description: (2) Soil Borings in Roadway
Location: 100 ft on either side of Goodwin Bridge
Budget:
Start Date: 09/25/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St North
Description: Demolition of Cavalier Inn
Location: Street and Sidewalk
Budget:
Start Date: 09/24/18
Project Manager: Kevin Tharp
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St North
Description: Water line tie-ins to Carruthers Hall.
Location: Emmet St N at Carruthers Hall
Budget:
Start Date: 06/17/19
Project Manager: Paige Sanford
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St S
Description:
Location: Emmet St S - TriState Utilities
Budget:
Start Date: 03/18/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St S
Description: Repairs to bridge.
Location: Between Stadium Rd and Thomson Rd - Canterbury
Budget:
Start Date: 11/04/20
Project Manager: Erika Lamm
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St S
Description:
Location: 210 Emmet St - Asturian Construction
Budget:
Start Date: 10/18/21
Project Manager: Robert Crabtree
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet St S
Description: The sidewalk closure is in effect for less than 48 hours.
Location: Near UVA Bookstore - Draper Aden
Budget:
Start Date: 03/08/21
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street
Description: Valve installation for Emmet Ivy Waterline Replacement Project
Location: at McCormick Rd Bridge
Budget:
Start Date: 12/19/18
Project Manager: NDS
Status: Archived Closure
Comments: Various days between November to February

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street
Description: Valve installation for Emmet Ivy Waterline Replacement Project
Location: at McCormick Rd Bridge
Budget:
Start Date: 12/19/18
Project Manager: NDS
Status: Archived Closure
Comments: Various days between November to February

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street
Description: Valve installation for Emmet Ivy Waterline Replacement Project
Location: at McCormick Rd Bridge
Budget:
Start Date: 12/19/18
Project Manager: NDS
Status: Archived Closure
Comments: Various days between November to February

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street
Description: Valve installation for Emmet Ivy Waterline Replacement Project
Location: at McCormick Rd Bridge
Budget:
Start Date: 12/19/18
Project Manager: NDS
Status: Archived Closure
Comments: Various days between November to February

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street
Description: Valve installation for Emmet Ivy Waterline Replacement Project
Location: at McCormick Rd Bridge
Budget:
Start Date: 12/19/18
Project Manager: NDS
Status: Archived Closure
Comments: Various days between November to February

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street
Description: Valve installation for Emmet Ivy Waterline Replacement Project
Location: at McCormick Rd Bridge
Budget:
Start Date: 12/19/18
Project Manager: NDS
Status: Archived Closure
Comments: Various days between November to February

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street - Faulconer
Description:
Location: Emmet St S between pedestrian bridge and Central Grounds Parking Garage
Budget:
Start Date: 04/03/23
Project Manager: Jody Shuler
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street at the McCormick Road Ramp
Description: This will be a left turn lane closure with shift) Night time operation, temporary lighting will be used to illuminate the work zone. Speed Limit is 25mph. McCormick Ramp shall remain closed from the start work date to 8/12/2022 subject to change
Location: 406 US - 29 BUS
Budget:
Start Date: 07/18/22
Project Manager: Ray Fish
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street at the McCormick Road Ramp
Description: This will be a left turn lane closure with shift) Night time operation, temporary lighting will be used to illuminate the work zone. Speed Limit is 25mph. McCormick Ramp shall remain closed from the start work date to 8/12/2022 subject to change
Location: 406 US - 29 BUS
Budget:
Start Date: 07/18/22
Project Manager: Ray Fish
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street N - Monarch
Description:
Location: Emmet Street N from Earhart to Hydraulic
Budget:
Start Date: 04/10/23
Project Manager: Michael Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmet Street S - Hourigan
Description: Lane shift in vicinity of 403 Emmet to protect motorists from overhead grinding and painting on bridge deck.
Location: Vicinity of 403 Emmet Street South
Budget:
Start Date: 11/13/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmett St
Description:
Location: From Stadium Rd to McCormick Rd - Draper Aden Assoc.
Budget:
Start Date: 03/09/20
Project Manager: Tyler Layman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmett St
Description:
Location: Between Sprigg Ln and Lewis Mountain Rd - TriState Utilities
Budget:
Start Date: 03/12/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmett St
Description:
Location: At the intersection of Thompson Rd. - Commonwealth Excavating
Budget:
Start Date: 04/09/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmett St
Description:
Location: Emmett St N from University Ave to Arlington Blvd - Inframap
Budget:
Start Date: 02/10/20
Project Manager: Richard Sodan
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmett St
Description: Sidewalk and curb & gutter work.
Location: From Ivy Rd to Sprigg Ln.
Budget:
Start Date: 02/25/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmett St S
Description:
Location: Emmet St near Thomson Rd - TriState Utilities
Budget:
Start Date: 03/17/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmett Street - Digs
Description:
Location: 1000 Emmett Street
Budget:
Start Date: 05/23/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Emmit St
Description:
Location: Emmit St north bound left turn lane onto Barracks Rd and southbound left turn lane onto Barrakcs Rd.
Budget:
Start Date: 07/15/19
Project Manager: Wayne Shafer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Eton - Linco
Description:
Location:
Budget:
Start Date: 04/01/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Eton Rd
Description:
Location: Eton Rd - Williams Bros Tree
Budget:
Start Date: 08/12/20
Project Manager: Cindy
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Evergreen Avenue
Description: Sewerline repair, flagger operation
Location: 700 Evergreen
Budget:
Start Date: 11/12/18
Project Manager: Durwin Corbin - Supervisor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Faulconer Detour route
Description: Type 3 barricades across Little High from N. to S. at or around 1010 1011 addresses. The plastic barriers belong to Hourigan, but Faulconer is planning to use the location as a staging area for the Wye Demo at E High x 10th. Aug. 20 - 24, Aug. 27-31. (8pm - 6am)
Location: 400 block of 10th, 1011 Little High
Budget:
Start Date: 07/31/23
Project Manager: Hourigan
Status: Archived Closure
Comments: Finalization of E High paving by Oct. 16th and removal of barricades thereafter.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Fauquier Rd
Description:
Location:
Budget:
Start Date: 10/05/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Fauquier St
Description: Paving operation.
Location: Lewis Mtn to Thomson Rd
Budget:
Start Date: 10/06/20
Project Manager: Andrew Owens
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Fendall Terr
Description: Monday through Friday closure only.
Location: Fendall Terr - Linco
Budget:
Start Date: 02/08/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Fontaine Ave
Description:
Location: Fontaine Ave - Linco
Budget:
Start Date: 12/07/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Fontaine Ave
Description:
Location: Between JPA and Westerly Ave - InfraMap Corp
Budget:
Start Date: 05/11/20
Project Manager: Richard Sodan
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Forest Hills Ave
Description:
Location: 1114 Forest Hills Dr - Dumpster
Budget:
Start Date: 03/10/21
Project Manager: Michael Cook
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Forest St
Description: This is a sidewalk closure not in excess of 48 hours.
Location: 805 Preston Ave at Forest St - MVT
Budget:
Start Date: 07/13/20
Project Manager: Trevor Keller
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Franklin St
Description:
Location: Franklin St - Linco
Budget:
Start Date: 03/08/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Franklin St
Description:
Location: Franklin St - Scotts Backhoe
Budget:
Start Date: 12/16/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Galloway Dr
Description:
Location: Intersection of Holly Rd - Commonwelath Excavating
Budget:
Start Date: 11/19/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Galloway Dr
Description:
Location:
Budget:
Start Date: 11/13/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garret St - Momentum Earthworks
Description: Repaving. Asphalt Patching.
Location:
Budget:
Start Date: 11/29/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garret St x 9th St SE - Caton Co.
Description: Sidewalk creation. Intersection reconstruction.
Location:
Budget:
Start Date: 02/06/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garret St x 9th St SE - Caton Co.
Description: Sidewalk creation. Intersection reconstruction.
Location:
Budget:
Start Date: 02/06/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett - Martin Horn
Description:
Location: 300 block Garrett
Budget:
Start Date: 02/28/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: This is a street, sidewalk, and parking spot closure not in excess of 48 hours.
Location:
Budget:
Start Date: 12/18/21
Project Manager: Milt Small
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: 323 2nd St SE - Martin Horn
Budget:
Start Date: 11/17/21
Project Manager: Milt Small
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: Dumpster parking.
Location: 100 Garrett St - MELCP
Budget:
Start Date: 12/01/20
Project Manager: Kelly Cox
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location:
Budget:
Start Date: 10/05/20
Project Manager: Chris Prue
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Between 1st St S and Gleason St - AG DIllard
Budget:
Start Date: 06/22/20
Project Manager: Chris Prue
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Between 2nd St SE and 4th St SE - Batson-Cook
Budget:
Start Date: 07/01/20
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: One lane closure for crane/lifts with flaggers.
Location: Between 2nd St SE and 4th St SE - Batson-Cook
Budget:
Start Date: 07/06/20
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: Between 2nd St SE and 4th St SE - Martin Horn
Budget:
Start Date: 03/23/21
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: Public Parking Change sign will be posted during the first 30 days of this closure and remian effective for the full period of 145 days if there is a lack of public contests.
Location: 323 Garrett St - Gilbane
Budget:
Start Date: 03/08/21
Project Manager: Robert Grubbs
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: 200 Garrett St - Strauss Construction
Budget:
Start Date: 03/24/21
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Intersection of Garrett & 4th St
Budget:
Start Date: 05/25/21
Project Manager: Shawn Woody
Status: Archived Closure
Comments: Closure to facilitate crane.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Intersection of Garrett & 4th St
Budget:
Start Date: 05/25/21
Project Manager: Shawn Woody
Status: Archived Closure
Comments: Closure to facilitate crane.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Between 1st St S and Gleason St
Budget:
Start Date: 12/21/20
Project Manager: Joe Marshall
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: 323 Garrett St - Martin Horn
Budget:
Start Date: 07/13/21
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Between 2nd St SE and 4th St SE - Linco
Budget:
Start Date: 10/11/21
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: A detour will be in place for this section of Garrett St.
Location: Garrett St between 4th St and 2nd St - AG Dillard
Budget:
Start Date: 11/06/19
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Garrett St between 2nd and 4th - AG Dillard
Budget:
Start Date: 11/13/19
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: Street closed between 4th St SE and 2nd St SE for paving operation. Detour will be in place. Work is scheduled for one day only.
Location: Between 4th St SE and 2nd St SE
Budget:
Start Date: 10/25/19
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: This is a 4 hour project that is expected to occur the week of 4/13 to 4/17 based on weather. The detour will route drivers to 2nd St SE and 4th St SE between Garrett St and Water St.
Location: 323 Garrett St - Dominion
Budget:
Start Date: 04/20/20
Project Manager: Kelly Maxwell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: From Gleason St to 126 Garrett St - Hourigan
Budget:
Start Date: 04/01/20
Project Manager: Joe Marshall
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Between 2nd St Se and 4th St SE - Batson Cook
Budget:
Start Date: 04/01/20
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Between 4th and 2nd St
Budget:
Start Date: 12/20/19
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Garrett St - Batson Cook
Budget:
Start Date: 01/14/20
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: Construction.
Location: Garrett St north sidewalk
Budget:
Start Date: 05/01/19
Project Manager: Tony Parker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: One lane and sidewalk will be closed at a time. Flaggers will be present.
Location: Garrett St between 2nd St SE and 4th St SE
Budget:
Start Date: 07/22/19
Project Manager: Andrew Weldon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: Garrett St will be closed between 2nd St SE and 4th St SE during the day on 8/13-8/16 for installation of water and storm sewer facilities. Vehicles will be detoured to Monticello Ave during this operation.
Location: Garrett St
Budget:
Start Date: 08/06/19
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: Garrett St will be closed between 2nd St SE and 4th St SE from 9/9-9/13/2019 for installation of water and storm sewer facilities. Vehicles will be detoured to Monticello Ave during this operation.
Location: Garrett St between 2nd St SE and 4th St SE.
Budget:
Start Date: 09/09/19
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description:
Location: Garrett St
Budget:
Start Date: 09/01/19
Project Manager: Tony Parker
Status: Archived Closure
Comments: 6 parking spaces reserved on a monthly basis beginning December 1, 2019.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St
Description: Utility work
Location: Garrett Street
Budget:
Start Date: 12/30/99
Project Manager:
Status: Archived Closure
Comments: April Extension

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St - Belmont Bridge
Description: This is a smaller portion of utility work supporting the overall Belmont Bridge replacement project. Schedules are always dependent on weather and will be updated as staff gets more information.
Location: Between 9th Street and 6th Street
Budget:
Start Date: 01/17/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St - Handley
Description:
Location:
Budget:
Start Date: 02/21/22
Project Manager: Taylor Easter
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St - Hourigan
Description:
Location: Garrett St between 2nd and Gleason
Budget:
Start Date: 06/01/21
Project Manager: Joseph Marshall
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St & 4th St SE Intersection
Description: Sanitary Sewer Manhole Replacement
Location:
Budget:
Start Date: 08/20/18
Project Manager: Damon Dudley - VP
Status: Archived Closure
Comments: DATE CHANGE

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St and Gleason St
Description:
Location: Garrett St and Gleason St - Hourigan
Budget:
Start Date: 11/29/21
Project Manager: Joe Marshall
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St and Gleason St
Description: 17 spaces along Garrett St 6 spaces along Gleason St
Location: Garrett St and Gleason St - Hourigan
Budget:
Start Date: 06/23/20
Project Manager: Joshua Morris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St and Old Avon St
Description:
Location: Garrett St and Old Avon St - Belmont Bridge
Budget:
Start Date: 12/06/21
Project Manager: Jeanette Janiczek
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St at 4th St SE
Description: This is a closure not in excess of 48 hours.
Location:
Budget:
Start Date: 10/13/21
Project Manager: Milt Small
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett St at 4th St SE
Description: This is a sidewalk closure not in excess of 48 hours.
Location: Garrett ST at 4th St SE - MH
Budget:
Start Date: 04/09/21
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett Street
Description: Sidewalk and parking lane closure for utility work to relocate overhead power lines below ground. Feb. 6-28 : only sidewalk closure
Location: Between 2nd St SE and 4th St
Budget:
Start Date: 01/07/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett Street
Description: Sidewalk and parking lane closure for utility work to relocate overhead power lines below ground. Feb. 6-28 : only sidewalk closure
Location: Between 2nd St SE and 4th St
Budget:
Start Date: 01/07/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Garrett Street
Description: Sidewalk and parking lane closure for utility work to relocate overhead power lines below ground. Feb. 6-28 : only sidewalk closure
Location: Between 2nd St SE and 4th St
Budget:
Start Date: 01/07/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gentry Lane
Description: New water main for city
Location:
Budget:
Start Date: 07/23/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments: Detour through Dairy Rd

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gentry, Del-mar, Rose Hill - WANRack
Description: Fiber Installation
Location: Various streets across the city (TBD)
Budget:
Start Date: 04/29/24
Project Manager:
Status: Future Closure
Comments: Itinerary schedule TBD

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gentry, Del-mar, Rose Hill - WANRack
Description: Fiber Installation
Location: Various streets across the city (TBD)
Budget:
Start Date: 05/01/24
Project Manager:
Status: Future Closure
Comments: Itinerary schedule TBD

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gentry, Del-mar, Rose Hill - WANRack
Description: Fiber Installation
Location: Various streets across the city (TBD)
Budget:
Start Date: 04/10/24
Project Manager:
Status: Active Closure
Comments: Itinerary schedule TBD

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gillepsie Ave
Description:
Location: Near E High St - Linco
Budget:
Start Date: 08/10/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gillespie Ave
Description: Milling and paving operation.
Location: Between High St and Grace St - SL Williamson
Budget:
Start Date: 06/23/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gillespie Avenue
Description: Replacing damaged pole. Closing shoulder of road adjacent to 711 Gillespie Ave
Location:
Budget:
Start Date: 09/03/18
Project Manager: Carl N Pilat - Joint Use Designer
Status: Archived Closure
Comments: Week permit, work for one day

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gleason St
Description:
Location: Between Monticello Ave and Garrett St - Hourigan
Budget:
Start Date: 04/01/20
Project Manager: Joe Marshall
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gleason St
Description:
Location: From Monticello Ave to Gleason St - AG DIllard
Budget:
Start Date: 09/02/20
Project Manager: Chris Prue
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gleason St
Description:
Location: Between Garrett St and Monticello Ave - AG Dillard
Budget:
Start Date: 11/23/20
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gleason St
Description:
Location: Gleason St - AG Dillard
Budget:
Start Date: 10/21/20
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gleason St
Description:
Location: Garrett St to Monticello Ave - Hourigan
Budget:
Start Date: 12/07/20
Project Manager: Joseph Marshall
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gleason St
Description:
Location: North half of Gleason St - AG Dillard
Budget:
Start Date: 08/16/21
Project Manager: Roman Bridge
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Goodman St
Description: POD
Location: 146 Goodman St - POD
Budget:
Start Date: 06/25/21
Project Manager: Hannah Watson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Goodman St
Description: Weekdays only.
Location: 127 Goodman St - Scotts Backhoe
Budget:
Start Date: 11/17/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Goodman St
Description: 2 parking space closures for moving truck
Location:
Budget:
Start Date: 11/19/18
Project Manager: Reid Bailey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Goodman Street
Description: Dumpster parking
Location:
Budget:
Start Date: 09/21/18
Project Manager: Steve Johnson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Gordon Ave, 11th ST NW, Page St, and 10th St NW
Description: This is a mobile operation with street and sidewalk closure locations being impact less than 5 minutes.
Location: Gordon Ave, 11th ST NW, Page St, and 10th St NW - Shentel
Budget:
Start Date: 12/03/19
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady - Dairy Market
Description:
Location: Grady Ave between 10th and Preston
Budget:
Start Date: 05/15/21
Project Manager: Bree Brostko Whitehouse
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description: This is a sidewalk closure not in excess of 48 hours.
Location: Dairy Central Building at 10th St NW and Grady Ave - Momentum
Budget:
Start Date: 04/08/21
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description: Replacing the sidewalk.
Location: 1600 Grady Ave - Digs
Budget:
Start Date: 11/11/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description:
Location: Grady Ave - Linco
Budget:
Start Date: 11/19/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description:
Location: Grady Ave at Dairy Central - Momentum
Budget:
Start Date: 11/10/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description:
Location: Between 10th St NW and Preston Ave - Momentum
Budget:
Start Date: 10/27/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description:
Location: 946 Grady Ave - Martin Horn
Budget:
Start Date: 08/05/20
Project Manager: Nathaniel Eaton
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description:
Location: Grady Ave at Preston Ave - Momentum
Budget:
Start Date: 04/29/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description:
Location: Grady Ave - Momentum
Budget:
Start Date: 06/03/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments: This is a street and sidewalk closure not in excess of 48 hours.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description:
Location: Between 9th St NW and 10th St NW - Momentum
Budget:
Start Date: 10/17/19
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description: Replacement of the sidewalk.
Location: Grady Ave between 10th St NW and Preston Ave
Budget:
Start Date: 10/02/19
Project Manager: Mark Wagner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description: Installing new sidewalk. Sidewalk closed and flagging operation in place for milling.
Location: Between Cabell Ave and 15th St NW
Budget:
Start Date: 08/28/19
Project Manager: Sheldon Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description: Storm drain installation.
Location: 1602 Grady Ave
Budget:
Start Date: 06/10/19
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description: Street and sidewalk closure for installation of storm sewer across Preston Ave. Phase III: Grady Avenue street access to Preston Avenue closed due to Eastbound Preston Ave right lane closure. Parking will be closed from 1/21 through 1/23.
Location: In front of 946 Grady Avenue, from 10th St to Preston
Budget:
Start Date: 01/09/19
Project Manager:
Status: Archived Closure
Comments: Phase III

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description: Parking Space
Location: 1600 Grady Ave
Budget:
Start Date: 05/06/19
Project Manager: Gretchen Woods
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave
Description: Storm drain work.
Location: 1600 Grady Ave
Budget:
Start Date: 05/28/19
Project Manager: Quinn Duinen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave - Ting Internet
Description: Fiber Installation
Location:
Budget:
Start Date: 04/10/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grady Ave betwen 12th St NW and 13th St NW
Description: To facilitate sewer operations.
Location: Grady Ave betwen 12th St NW and 13th St NW
Budget:
Start Date: 04/24/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Graves St
Description: This is a sidewalk closure not in excess of 48 hours.
Location: Between Monticello Rd and Little Graves St
Budget:
Start Date: 03/11/20
Project Manager: Ross McDermott
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Graves St
Description: POD
Location: 714 Graves St
Budget:
Start Date: 11/27/19
Project Manager: Sam Heavner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Graves St
Description: Dumpster.
Location: 709 Graves St - HDHR
Budget:
Start Date: 07/13/20
Project Manager: Isabell McMahon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Green St - S.L. Williamson
Description: Milling and paving.
Location:
Budget:
Start Date: 10/10/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbriar, Brandywine, Meadowbrook - WANRack
Description: Fiber Installation
Location: Various streets across the city (TBD)
Budget:
Start Date: 04/15/24
Project Manager:
Status: Active Closure
Comments: Itinerary order TBD

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbriar, Brandywine, Meadowbrook - WANRack
Description: Fiber Installation
Location: Various streets across the city (TBD)
Budget:
Start Date: 04/10/24
Project Manager:
Status: Completed Closure
Comments: Itinerary order TBD

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr
Description:
Location: Right turn lane on Greenbrier Dr at Rio Rd E - CES
Budget:
Start Date: 07/13/20
Project Manager: David Holmes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr
Description:
Location: 2210 Greenbrier Dr - Commonwealth Excavating
Budget:
Start Date: 02/19/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Dr - Tri-State
Description: Manhole rehab. TTC 4.2
Location: Greenbrier Dr, Brandywine Dr, Glenn Ct, Melisa Pl, Wilson Ct
Budget:
Start Date: 08/14/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenbrier Drive
Description: Sidewalk closure for sewer line repair
Location: 1923 Greenbrier / Rivanna Trail entrance
Budget:
Start Date: 04/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenleaf Ln
Description: Open to local traffic only.
Location: Between Rose Hill and Gentry - Linco
Budget:
Start Date: 01/03/22
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Greenway Rd
Description: A street and sidewalk closure not in excess of 48 hours.
Location: 1208 & 1210 Greenway Rd - VYTC
Budget:
Start Date: 10/06/21
Project Manager: Jeremy Thompson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grimes Place - Linco
Description: Water Main replacement
Location: Entire Cul-d-sac
Budget:
Start Date: 01/22/24
Project Manager: Troy Wright
Status: Archived Closure
Comments: Traffic Control 23.2 Where necessary

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grimes Place - SL Williamson
Description: Milling & Paving
Location: Harris Rd to End
Budget:
Start Date: 04/05/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grove Rd
Description:
Location: Grove Rd - Commonwealth Excavating
Budget:
Start Date: 11/18/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grove Rd
Description:
Location: Grove Rd at Meadowbrook Heights - Tri State
Budget:
Start Date: 11/13/19
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grove Rd
Description: This is a street and sidewalk closure not in excess of 48 hours. The work will require a sidewalk and shoulder closure to install a power pole.
Location: Shoulder of Grove Rd between St Annes Rd to Meadowbrook Hts Rd.
Budget:
Start Date: 10/14/19
Project Manager: Chris Bjelland
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Grove St
Description: 12/2 - 12/5 will be a road closure with a detour.
Location: 920 Grove St - Osmose Utilities
Budget:
Start Date: 11/18/19
Project Manager: Asia Johnson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hammond Street
Description: Installing of new sanitary sewer lateral
Location:
Budget:
Start Date: 12/17/18
Project Manager: NDS
Status: Archived Closure
Comments: 1 day of closure between 12/17-12/21

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hampton Rd, Carlton Rd, Nassau St
Description: Street/sidewalk closure for installation of gas main
Location: Parking & sidewalk closure at 300 & 400 block Carlton Rd. Street closure down Hampton St. Parking & sidewalk closure at 700 & 800 block Nassau St.
Budget:
Start Date: 04/04/19
Project Manager:
Status: Archived Closure
Comments: April extension

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hampton Rd, Carlton Rd, Nassau St
Description: Street/sidewalk closure for installation of gas main
Location:
Budget:
Start Date: 04/04/19
Project Manager:
Status: Archived Closure
Comments: April extension

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hampton Rd, Carlton Rd, Nassau St
Description: Parking & sidewalk closure at 300 & 400 block Carlton Rd. Street closure down Hampton St. Parking & sidewalk closure at 700 & 800 block Nassau St. Installation of gas main.
Location: Parking & sidewalk closure at 300 & 400 block Carlton Rd. Street closure down Hampton St. Parking & sidewalk closure at 700 & 800 block Nassau St.
Budget:
Start Date: 04/04/19
Project Manager:
Status: Archived Closure
Comments: April extension

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hampton St
Description:
Location:
Budget:
Start Date: 01/15/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hampton Street
Description: Replacing gas main for city.
Location:
Budget:
Start Date: 01/16/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hanover St
Description: Sewer line repair and concrete pour.
Location: 506 Hanover St
Budget:
Start Date: 06/13/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hanover St
Description:
Location: 418 Hanover St - Comm Excavating
Budget:
Start Date: 08/11/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hardy Dr-CRHA
Description:
Location: 812 Hardy Drive- 820 Hardy Drive
Budget:
Start Date: 04/16/22
Project Manager: John M. Sales
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Harris Rd
Description: Street closure with flagging operation.
Location: 511 Harris Rd - Linco
Budget:
Start Date: 03/04/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Harris Rd
Description:
Location: Between Shale Pl and Slate Pl - TriState
Budget:
Start Date: 03/09/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Harris Rd
Description: Installing new sidewalk, curb and gutter
Location: Longwood to 5th
Budget:
Start Date: 07/16/18
Project Manager: Mandy Brown - Estimator
Status: Archived Closure
Comments: Extended 8/10/ - 9/30

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Harris Rd - Pennline (Dominion)
Description: Tree Trimming for Power Lines.
Location:
Budget:
Start Date: 04/22/24
Project Manager:
Status: Future Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Harris St
Description: Sidewalk closure and one lane road with flaggers for installation of new water meter.
Location: 700 block, between Henry Ave and Dale Ave
Budget:
Start Date: 04/15/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Harris St
Description:
Location: 750 Harris St
Budget:
Start Date: 12/18/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Harris St - Segra
Description: Fiber installation/rerouting. Non-peak traffic hours. Flagger 23.2 TTC
Location: North side of Harris Street from McIntire intersection to 1223
Budget:
Start Date: 09/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Harris St - Segra
Description: Fiber installation/rerouting.
Location: North side of Harris Street from McIntire intersection to 1223
Budget:
Start Date: 09/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Harris Street
Description: Sidewalk closure and lane weave to install new meter for the City at 601 Preston
Location: 600 block, between Preston Ave and Dale Ave
Budget:
Start Date: 04/08/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hartman Mill Rd - Public Utilities
Description: Gas Line Tap
Location: Between 203 & 1st St S
Budget:
Start Date: 04/09/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hartmans Mill Rd
Description:
Location:
Budget:
Start Date: 11/29/21
Project Manager: Darrin Duvalois
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hartmans Mill Rd
Description: Closure for street and sidewalk repair.
Location: Hartmans Mill Rd
Budget:
Start Date: 03/29/19
Project Manager: Charles Armstrong
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hartmans Mill Rd
Description: A small section on Hartmans Mill Rd will be closed at the corner of Hartmans Mill Rd and Ridge St. Thru traffic will be directed around Hartmans Mill Rd via Ridge St to Lankford Ave.
Location: Corner of Hartmans Mill Rd and Ridge St
Budget:
Start Date: 08/07/19
Project Manager: Cory Amyett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hartman's Mill Rd
Description: Sewer work.
Location: Between 1st St S and Ridge St
Budget:
Start Date: 09/30/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hartmans Mill Road
Description: Construction of entrance to new road. Connection of water, gas, sewer.
Location: No thru traffic from Ridge St. to 1st St S
Budget:
Start Date: 11/05/18
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hartman's Mill Road
Description: Water Line Cut in.
Location: 1000 1st Street South
Budget:
Start Date: 04/06/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Heather Heyer Way
Description: Dumpster placement.
Location: Heather Heyer Way - Dumpster
Budget:
Start Date: 01/07/21
Project Manager: Chas Webster
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Heather Heyer Way
Description: Less than 48 hour closure.
Location: Between E Market St and Water St - Martin Horn
Budget:
Start Date: 07/29/20
Project Manager: Barbara Regester
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Heather Heyer Way
Description:
Location: Heather Heyer Way
Budget:
Start Date: 10/14/19
Project Manager: Ron Brown
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Heather Heyer Way
Description:
Location: Heather Heyer Way - Doody Calls
Budget:
Start Date: 03/27/20
Project Manager: Cathy Ross
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hedge St
Description: The closure dates are unconfirmed and the closure will occur sometime between the dates provided. This is for a pole removal and should be a 3 day project.
Location: 405 Hedge St - Dominion
Budget:
Start Date: 10/08/20
Project Manager: Lindsey Reininger
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hemlock Ln
Description: Paving operation.
Location: Hemlock Ln to Dead End - SL Williamson
Budget:
Start Date: 07/08/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Henry Ave
Description:
Location: 802 Henry Ave - Scotts Backhoe
Budget:
Start Date: 07/06/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Henry, Grady, 10th, 11th, Page - WANRack
Description: Fiber Installation (Aerial / Underground)
Location: Various (TBD)
Budget:
Start Date: 05/01/24
Project Manager:
Status: Future Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Henry, Grady, 10th, 11th, Page - WANRack
Description: Fiber Installation (Aerial / Underground)
Location: Various (TBD)
Budget:
Start Date: 04/25/24
Project Manager:
Status: Future Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hereford Dr - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. TTC-23.2 Lane Closure on a Two-Lane Road w/ Flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 265 Hereford Dr.
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hereford Dr - Accumark
Description: Daylighting taking place in 4 locations around Hereford Dr. x Stadium Rd.
Location: 265 Hereford Dr.
Budget:
Start Date: 08/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hereford Dr - Accumark
Description: Daylighting taking place in 4 locations around Hereford Dr. x Stadium Rd.
Location: 265 Hereford Dr.
Budget:
Start Date: 08/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hereford Dr - Accumark
Description: Daylighting taking place in 4 locations around Hereford Dr. x Stadium Rd.
Location: 265 Hereford Dr.
Budget:
Start Date: 08/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hessian Rd
Description:
Location:
Budget:
Start Date: 01/28/21
Project Manager: Sean Schanbacher
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Highland Ave
Description: This sidewalk closure will only occur on the days needed to install a new pole for service. These dates are undetermined and notification will be updated as information is received.
Location: 2333 Highland Ave - Dominion Energy
Budget:
Start Date: 06/22/20
Project Manager: Drew Smith
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hillsdale Drive - Linco
Description:
Location: Hillsdale Drive from India to Zan
Budget:
Start Date: 03/27/23
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hilltop Rd
Description: City CIPP work. Flagging Operation
Location:
Budget:
Start Date: 02/15/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hillwood Pl
Description:
Location: Hillwood Place neare the intersection of Kerry Ln
Budget:
Start Date: 10/17/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hillwood Pl
Description:
Location: Hillwood Pl - SL Williamson
Budget:
Start Date: 06/16/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hillwood Place
Description: Parking
Location: 2409 Hillwood Place
Budget:
Start Date: 06/24/19
Project Manager: Elysia Anderson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Ave
Description: Sidewalk repairs.
Location: Hinton Ave at Avon, Church, Rialto, Monticello, and Meridian
Budget:
Start Date: 07/02/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Ave
Description: Sidewalk improvements.
Location: Hinton Ave intersections of Avon, Church, Rialto, Monticello, and Meridian.
Budget:
Start Date: 09/16/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Ave
Description: Vehicles travelling east bound on Hinton Ave will be detoured to Monticello Rd/Hinton Ave via Rialto St and Belmont Ave.
Location: 802 Hinton Ave
Budget:
Start Date: 10/01/19
Project Manager: Stephen Nicholson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Ave
Description:
Location: Hinton Ave - Maple Ridge Group
Budget:
Start Date: 02/05/20
Project Manager: Steve Nicholson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Ave
Description: Parking Space: 1/6/2020 through 2/4/2020 Sidewalk Closure: 2/3/2020 through 1/23/2020 Street Closure with Detour: 2/3/2020 through 2/13/2020
Location: 802 Hinton Ave - Maple Ridge Group
Budget:
Start Date: 02/03/20
Project Manager: Steve Nicholson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Ave
Description:
Location: 802 Hinton Ave - MRG
Budget:
Start Date: 07/27/20
Project Manager: Steve Nicholson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Ave
Description:
Location: At Avon St - TriState
Budget:
Start Date: 04/21/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Ave
Description:
Location: 800-802 Hinton Ave - Maple Ridge Group
Budget:
Start Date: 06/28/20
Project Manager: Steve Nicholson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Ave
Description:
Location: 802 Hinton Ave - MRG
Budget:
Start Date: 10/22/20
Project Manager: Steve Nicholson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Ave
Description: A full closure to through traffic with a detour to Monticello Rd and Belmont Ave.
Location: Between Rialto St and Monticello Rd - Maple Ridge Group
Budget:
Start Date: 07/28/21
Project Manager: Steve Nicholson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: HInton Ave
Description:
Location: In front of 802 Hinton Ave - Maple Ridge Group
Budget:
Start Date: 06/23/21
Project Manager: Steve Nicholson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hinton Avenue
Description: Insulation Truck parking space closure
Location:
Budget:
Start Date: 11/27/18
Project Manager: Zach Sanger
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Holly Dr
Description:
Location:
Budget:
Start Date: 11/16/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Holmes Ave
Description: POD
Location: 1000 block of Holmes Ave
Budget:
Start Date: 08/01/19
Project Manager: Ben Wildasin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hydraulic and 250
Description: Installation of 2 spans of aerial fiber optic cable along existing Dominion VA power distribution poles
Location:
Budget:
Start Date: 08/14/18
Project Manager: Shed Conrad - Sr.Network Engineer OSP
Status: Archived Closure
Comments: Phase 1

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Hydraulic Rd
Description:
Location: 2115 Hydraulic Rd - MVTS
Budget:
Start Date: 12/07/20
Project Manager: Marc Ray
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: India Rd
Description: Street and sidewalk closure. Sidewalk closed less than 48 hours; boring under sidewalk.
Location:
Budget:
Start Date: 02/09/21
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: India RD-Lumos
Description:
Location: Hillsdale Dr & India Rd at the intersection of Hillsdale Dr & India Rd
Budget:
Start Date: 04/18/22
Project Manager: Jared Morris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy - Faulconer
Description:
Location: South Sidewalk between Rothery and Emmet
Budget:
Start Date: 04/06/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy - Faulconer
Description:
Location: Left Turn Lane onto Rothery
Budget:
Start Date: 03/07/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy - Faulconer
Description:
Location: 123 Emmet Street
Budget:
Start Date: 02/01/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy - Faulconer
Description:
Location:
Budget:
Start Date: 06/01/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description:
Location: North sidewalk on Ivy Rd at Emmet St - Faulconer
Budget:
Start Date: 11/30/21
Project Manager: Zachary Herrman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description:
Location:
Budget:
Start Date: 07/06/21
Project Manager: Zachary Herrman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description: This is a sidewalk and street closure not in excess of 48 hours.
Location: 2125 Ivy Rd
Budget:
Start Date: 07/15/20
Project Manager: Trevor Keller
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description: Replace 8" water line and repair roadway.
Location: Ivy Rd at Rothery Rd
Budget:
Start Date: 05/01/19
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy rd
Description: Installing a water meter for the city.
Location: WB sidewalk of Ivy Rd near Cameron Ln intersection.
Budget:
Start Date: 05/22/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description: Install water meter for the city.
Location: WB sdiewalk of Ivy near Camaron Ln
Budget:
Start Date: 05/29/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description:
Location: Ivy Rd from Copely Rd. to Foods of All Nations
Budget:
Start Date: 07/12/19
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description:
Location: Ivy Rd from Alderman Rd to St. Annes Dr.
Budget:
Start Date: 07/12/19
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description: This is a right shoulder closure mobile operation.
Location: Between Old Ivy Rd and Bollingwood Rd.
Budget:
Start Date: 08/14/19
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description: Pavement patching operation.
Location: Ivy Rd from Old Ivy Rd to Emmet St.
Budget:
Start Date: 08/15/19
Project Manager: Bryan Rieckman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description:
Location: Ivy Rd between Alderman Rd and Newcomb Rd N
Budget:
Start Date: 09/16/19
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd
Description: This is a street and sidewalk closure not in excess of 48 hours. Replacing a utility pole.
Location: Between St Annes Dr and Alderman Rd
Budget:
Start Date: 11/18/19
Project Manager: Carl Pilat
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd - Faulconer Co.
Description: Duct Bank Installation
Location:
Budget:
Start Date: 04/01/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd and Emmet St
Description: The southbound lane on Emmet St will detoured to Massie Rd. The northbound lane on Emmet St will remain open. The eastbound lane on Ivy Rd approaching Emmet St will have a merge into the bike lane with a bike lane closure. The westbound lane on Ivy Rd approaching Emmet St will need to merge left one lane's distance once through the intersection.
Location: The Northwest corner of the Emmet St/Ivy Rd intersection - FCC
Budget:
Start Date: 09/07/21
Project Manager: Zachary Herman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd and University Ave
Description:
Location: Between Alderman and Newcomb
Budget:
Start Date: 10/10/19
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd and University Ave
Description:
Location: Between Alderman and Newcomb
Budget:
Start Date: 10/10/19
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd and University Rd
Description: This is a mobile operation with intermittent lane closures.
Location: Between Alderman Rd and Newcomb Rd
Budget:
Start Date: 08/16/19
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd at Emmet St
Description: Westbound lane on Ivy Rd closed from Emmet St to Rothery Rd. WB traffic on Ivy Rd and NB traffic on Emmet St detoured to Emmet St to Rothery Rd to Ivy Rd. EB traffic on Ivy Rd and SB traffic on Emmet St detoured to Copeley Rd and Massie Rd respectively. This is a nightime closure 9pm - 5am.
Location: Ivy Rd at Emmet St - Faulconer CC
Budget:
Start Date: 09/30/21
Project Manager: Zachary Herman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd.
Description:
Location: 2117 Ivy Rd to 2121 Ivy Rd (Copely Rd to Foods of All Nations)
Budget:
Start Date: 08/14/19
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Rd.
Description: Pavement marking.
Location: Emmet St to Old Ivy Rd
Budget:
Start Date: 10/08/19
Project Manager: Bryan Rieckman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Road
Description: A lane shift will be installed allowing for travel in both directions during the project.
Location: 2100 Ivy Rd to St Annes Dr.
Budget:
Start Date: 08/12/19
Project Manager: Bryan Rieckman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Road
Description: Pot hole existing utilities
Location: EB Left turning lane closure, WB & EB Bike lane closure
Budget:
Start Date: 10/23/18
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Road
Description: Overlashing a new 24 fiber on existing strand to 2121 Ivy Rd
Location: Off Emmet St intersection to 2121 Ivy Rd
Budget:
Start Date: 01/07/19
Project Manager:
Status: Archived Closure
Comments: Date of closure is TBD, currently estimating for mid Jan - mid Feb. Closure is only for 2 days.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Road-Faulconer
Description:
Location: 2033 Ivy Road
Budget:
Start Date: 05/03/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Road-Faulconer
Description:
Location: 2033 Ivy Road
Budget:
Start Date: 05/03/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Road-Faulconer
Description:
Location: 2033 Ivy Road
Budget:
Start Date: 05/03/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy Road-Faulconer
Description:
Location: 1939 Ivy Road Charlottesville, VA 22903
Budget:
Start Date: 12/12/22
Project Manager:
Status: Archived Closure
Comments: I. Location A. Street Address 1939 Ivy Road B. Physical Location South Sidewalk between Rothery and Emmet II. Detour A. Utilize crosswalks at Rothery and Emmet streets. Alternate pedestrian detour will be created on north side of roadway. III. Detour Deficiencies A. none known Public Utilities Dispatch 434-970-3800

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ivy-Faulconer
Description: Sidewalk Closure
Location: 1939 Ivy Road
Budget:
Start Date: 10/01/22
Project Manager: Faulconer Construction
Status: Archived Closure
Comments: N/A

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jamestown Dr
Description:
Location: 1611 Jamestown Dr - WE Brown
Budget:
Start Date: 08/01/21
Project Manager: Tana Coleman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jamestown Dr
Description:
Location: Jamestown Dr - Commonwealth Excavating
Budget:
Start Date: 06/26/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jeanette Lancaster Way
Description:
Location: Between Crispell Dr and Lane Rd - Faulconer
Budget:
Start Date: 04/14/20
Project Manager: Andrew Cox
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson
Description: The Jefferson Event Parking Closures
Location:
Budget:
Start Date: 11/01/18
Project Manager: BJ Pendleton
Status: Archived Closure
Comments: December 1-2,7-9,12-15,20-23,28-31

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: Storage Unit to utilize parking space for 91 days, off lot.
Location: 2400 Block JPA
Budget:
Start Date: 04/26/19
Project Manager: Nancy Damon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: Paving operation. Contractor has been advised that he must use police flaggers if flagging the intersection.
Location: Brandon Ave at JPA - SL WIlliamson
Budget:
Start Date: 03/09/20
Project Manager: Andrew owen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: This is a two day closure planned for 2/5 and 2/10.
Location: Brandon Ave to Monroe Ln - SL Williamson
Budget:
Start Date: 02/05/20
Project Manager: Andrew Owen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: Tie-in communication line.
Location: JPA from monroe Ln to 60 feet east.
Budget:
Start Date: 11/09/19
Project Manager: Lauren Campbell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: Parking for chipper and truck.
Location: East bound right turn lane on JPA between Lee St and Lane Rd.
Budget:
Start Date: 10/29/19
Project Manager: Jesse Deane
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description:
Location: Jefferson Park Ave at Ruppel Dr
Budget:
Start Date: 11/26/19
Project Manager: Lauren Campbell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: This is an intermittent street and sidewalk closure. Dates for closure are: 12/18 to 12/20; 12/23; 12/26 to 12/27.
Location: Between Lane Rd and Lee St
Budget:
Start Date: 12/19/19
Project Manager: Jesse Deane
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: Sidewalk closure - November 16 - 24 Lane shift - November 16 - 22
Location: JPA at Monroe Lane - Faulconer
Budget:
Start Date: 11/15/19
Project Manager: Lauren Campbell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: Boom lift for construction.
Location: 1725 Jefferson Park Ave
Budget:
Start Date: 06/03/19
Project Manager: Matt Barrett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description:
Location: 2112 JPA - Linco
Budget:
Start Date: 10/07/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description:
Location: 1718 JPA - Big O Tree
Budget:
Start Date: 07/14/21
Project Manager: John Jeffers
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description:
Location: 2424 Jefferson Park Ave - Scotts Backhoe
Budget:
Start Date: 10/06/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description:
Location: 1500 JPA - VYTC
Budget:
Start Date: 08/16/21
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: Installing water main
Location: Kent Terrace - Linco
Budget:
Start Date: 01/11/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: 2600 block section of JPA is closed due to an emergency gas leak repair.
Location: 2600 block of JPA - City Gas
Budget:
Start Date: 02/24/21
Project Manager: City Utilities - Gas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description:
Location: 2600 block of JPA - TriState
Budget:
Start Date: 11/09/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description: Drviers will be detoured from JPA northbound to Cleveland Ave to Cherry Ave to Highland Ave to Robertson Ave and back on to JPA.
Location: 2424 Jefferson Park Ave - Scotts Backhoe
Budget:
Start Date: 10/06/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave
Description:
Location:
Budget:
Start Date: 10/22/21
Project Manager: Jimmy Radakovich
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 2303, 2413, 2429 Jefferson Park Ave
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 2303, 2413, 2429 Jefferson Park Ave
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 2303, 2413, 2429 Jefferson Park Ave
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave - Dominion
Description: Power Line Pole removal/Install.
Location: 1600 block Jefferson Park Ave.
Budget:
Start Date: 08/21/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave - Dominion
Description: Power Line Pole removal/Install.
Location: 1600 block Jefferson Park Ave.
Budget:
Start Date: 08/21/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave - Dominion
Description: Power Line Pole removal/Install.
Location: 1600 block Jefferson Park Ave.
Budget:
Start Date: 08/21/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Ave - MH Masonry
Description: Right Lane Closure, Lane Merge into turn lane. Active Construction project.
Location:
Budget:
Start Date: 11/01/23
Project Manager:
Status: Active Closure
Comments: Mass Construction Truck Staging / Crane

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Avenue
Description:
Location: Between Lee St and Main St
Budget:
Start Date: 04/06/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Avenue
Description: Sidewalk closure and parking closure to precast concrete panels
Location:
Budget:
Start Date: 11/05/18
Project Manager: Kenny George
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Jefferson Park Avenue
Description: 10 parking space closure and JPA westbound sidewalk closure for final installment of precast concrete.
Location: 1725 JPA
Budget:
Start Date: 12/18/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: John St
Description: Installing new water meter for city
Location:
Budget:
Start Date: 08/27/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments: Sidewalk and shoulder closure

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: John St
Description: This is a sidewalk closure not in excess of 48 hours.
Location: John St
Budget:
Start Date: 09/10/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: John St
Description: Paving operation.
Location: John St - SL Williamson
Budget:
Start Date: 10/08/20
Project Manager: Andrew Owens
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: JPA
Description: Place tractor trailers to off load concrete panels
Location:
Budget:
Start Date: 10/08/18
Project Manager: Kenny George - Superintendent
Status: Archived Closure
Comments: sidewalk closure and 12 parking space closure

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: JPA Sidewalk Closure between Lee St and Main St
Description: Travel lanes will be diverted with channelizing devices on JPA between Lee St and Main St. The sidewalk will be intermittently closed for crane operations.
Location: Jefferson Park Ave between Lee St and Main St
Budget:
Start Date: 05/04/19
Project Manager: Jim Eller
Status: Archived Closure
Comments: Contractor will provide photo documentation of the work zone and pedestrian detours to the city on the day of operations.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Keith Vally Rd
Description:
Location: From Dairy Rd - Linco
Budget:
Start Date: 08/09/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kent Rd
Description:
Location: Alderman to Minor - Linco
Budget:
Start Date: 08/16/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kent Rd - S.L. Williamson
Description: Milling and Paving
Location:
Budget:
Start Date: 11/01/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kent Ter
Description: This street closure will remain open to local traffic only.
Location: Kent Terrace - Linco
Budget:
Start Date: 11/30/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kent Terrace - SL Williamson
Description:
Location:
Budget:
Start Date: 06/09/21
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kenwood Lane
Description: Street closure with flaggers. Install new sanitary sewer service line from property to existing sewer main in center of street
Location:
Budget:
Start Date: 10/15/18
Project Manager: Ron Rohr
Status: Archived Closure
Comments: One day of work

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kenwood Lane
Description: Replacing Curb/Gutter
Location:
Budget:
Start Date: 09/20/18
Project Manager: Mandy Brown
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kenwood Ln
Description:
Location: Near Lester Dr - Faulconer
Budget:
Start Date: 09/20/21
Project Manager: Andrew Cox
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kenwood Ln
Description:
Location: Lester Dr to Dead End - Linco
Budget:
Start Date: 01/19/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kenwood Ln
Description: This is a weekday only parking spot closure.
Location:
Budget:
Start Date: 09/21/20
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kenwood Ln.
Description:
Location: Cul-de-sac - Linco
Budget:
Start Date: 03/23/20
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kerry - Dominion
Description:
Location:
Budget:
Start Date: 01/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kerry - Dominion
Description:
Location:
Budget:
Start Date: 01/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kerry Ln
Description:
Location: To Dead End - SL Williamson
Budget:
Start Date: 08/21/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Kerry Ln
Description: Repair sidewalks and install curb ramps.
Location: Between Hillwood Dr and Greenbrier Dr - Linco
Budget:
Start Date: 07/13/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Keystone Pl
Description:
Location: At Linden Ave
Budget:
Start Date: 03/23/20
Project Manager: Jamie Blackwell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Keystone Pl
Description: Sidewalk improvements.
Location: Keystone Pl at the intersection of Linden Ave.
Budget:
Start Date: 07/15/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Keystone Pl
Description: Sidewalk repair.
Location: Keystone Pl
Budget:
Start Date: 08/01/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lambeth Ln
Description: Excludes Sundays
Location: Lambeth Ln at Rugby Rd - Martin Horn
Budget:
Start Date: 08/10/20
Project Manager: Barbara Regester
Status: Archived Closure
Comments: Excludes Sundays

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lambeth Ln
Description:
Location:
Budget:
Start Date: 09/01/21
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lankford Ave
Description:
Location: 226 Lankford Ave - Pike Engineering
Budget:
Start Date: 11/08/21
Project Manager: Brittney Shorts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lankford Ave
Description: POD Only
Location: Lankford Ave
Budget:
Start Date: 09/19/20
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lankford Avenue
Description: Installing new water meter for City. Detour through Hartmans Mill Rd.
Location: 114 Lankford Avenue
Budget:
Start Date: 01/28/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Leonard St
Description:
Location: Leonard St
Budget:
Start Date: 07/22/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Leonard St
Description: POD
Location: 1100 Block of Leonard St
Budget:
Start Date: 06/17/19
Project Manager: William Proffitt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Leonard St
Description: Repair and replace sidewalk, curb, and gutter on Leonard St.
Location: Leonard St from Bainbridge St to Carlton Rd.
Budget:
Start Date: 09/04/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Leonard St
Description:
Location:
Budget:
Start Date: 03/24/21
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lewis Mountain Rd
Description: Road closed to thru traffic for sewer lateral repair. This is an emergency permit. Detour will direct drivers to use adjacent roads.
Location: 2014 Lewis Mountain Rd - Scotts Backhoe
Budget:
Start Date: 06/25/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lewis Mountain Rd
Description: street closure for tree removal at 2008 Lewis Mtn Rd
Location: 2000 block
Budget:
Start Date: 03/12/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lewis Mountain Rd - Southland Homes
Description:
Location: 1942 Lewis Mountain Rd
Budget:
Start Date: 05/24/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lewis Mountain Road - Backhoe Bobs
Description:
Location: 1951 Lewis Mountain Road
Budget:
Start Date: 04/17/23
Project Manager: Darrin Duvalois
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lewis Mountain Road - Backhoe Bobs
Description:
Location: Lewis Mnt. Road between Lewis Mnt. Circle and Cameron Lane
Budget:
Start Date: 04/17/23
Project Manager: Darrin Duvalois
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lewis Mountain Road - Backhoe Bobs
Description:
Location: 1951 Lewis Mountain Road
Budget:
Start Date: 04/17/23
Project Manager: Darrin Duvalois
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lewis St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 108 Lewis St. - 121 Lewis St
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lewis St - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 108 Lewis St. - 121 Lewis St
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lexington Ave
Description: This was an emergency closure to correct a water issue under the sidewalk.
Location:
Budget:
Start Date: 09/03/20
Project Manager: Michael Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Linden Ave
Description:
Location: 1007 Linden Ave - VYTC
Budget:
Start Date: 01/14/21
Project Manager: William Allen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Linden Ave
Description: Emergency Sewer Repair
Location: 1007 Linden Ave - Scotts BH
Budget:
Start Date: 01/06/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Linden Ave
Description: Emergency sewer repair.
Location: 1007 Linden Ave - Scotts BH
Budget:
Start Date: 12/15/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Linden Ave
Description:
Location: 1011 Linden Ave - Digs Inc
Budget:
Start Date: 10/13/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Linden Ave - S.L. Williamson
Description: Milling and Paving.
Location:
Budget:
Start Date: 10/12/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Little High Street - Faulconer
Description:
Location:
Budget:
Start Date: 09/01/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Locust Ave
Description:
Location: 400 Locust Ave - Linco
Budget:
Start Date: 07/27/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Locust Ave
Description: Parking
Location: 510 Locust Ave
Budget:
Start Date: 06/27/19
Project Manager: Jeffery
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Long St
Description:
Location: 1321 Long St - linco
Budget:
Start Date: 09/02/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Long St
Description: Paving operation.
Location: Rivanna River Bridge to Parkk St - SL Williamson
Budget:
Start Date: 08/03/21
Project Manager: Ethan Hensley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Long St - Chads Backhoe
Description:
Location: 1008 Long St
Budget:
Start Date: 05/18/21
Project Manager: Chad Reuschling
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Long St and River Rd
Description:
Location:
Budget:
Start Date: 07/12/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Longwood Dr
Description:
Location: Between Flint Dr and Harris Rd
Budget:
Start Date: 11/04/19
Project Manager: Whitney Bennett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Longwood Drive
Description: Sewer Line repair/replace. One lane closed at a time.
Location:
Budget:
Start Date: 10/08/18
Project Manager: Quinn Durnien
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Longwood Drive
Description: POD
Location:
Budget:
Start Date: 08/04/18
Project Manager: Kimberly Cash
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lyman St
Description:
Location:
Budget:
Start Date: 11/11/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Lyman St
Description: Sidewalk and curb ramp repair.
Location: Between Goodman St and Douglas Ave
Budget:
Start Date: 10/06/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Madison Ave
Description: Installing water meters for the city.
Location: Madison Ave
Budget:
Start Date: 09/23/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Madison Ave - Ting Internet
Description: Fiber Installation
Location:
Budget:
Start Date: 04/10/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Madison Lane
Description: 2 Parking space closure for moving truck
Location:
Budget:
Start Date: 08/10/18
Project Manager: Kelly Robins
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Madison Ln
Description: Parking spot.
Location: 150 Madison Ln
Budget:
Start Date: 10/14/19
Project Manager: Don Hicklin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Madison Ln
Description:
Location: 130 Madison Ln - Parking
Budget:
Start Date: 08/17/21
Project Manager: Andrew Quigley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Madison Ln
Description: Closure to thru traffic and open to local traffic. Parking shall remain open.
Location: Madison Ln - Momentum
Budget:
Start Date: 01/11/21
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Madison Ln - Momentum
Description:
Location: Between University Ave and Chancelor
Budget:
Start Date: 02/11/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Madison Ln/Chancellor Sr
Description:
Location: Madison Ln - Momentum
Budget:
Start Date: 08/12/21
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Main St
Description: This is a sidewalk closure less than 48 hours.
Location: Corner of 5th St NE and Main St
Budget:
Start Date: 09/30/19
Project Manager: Ben Campbell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Main St - Pedestrian Mall Area
Description: This is a sidewalk closure less than 48 hours.
Location: In front of the VA Discovery Museum
Budget:
Start Date: 09/25/19
Project Manager: Janire Dozier
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Mall
Description: High Pressure water jet Citizen Burger on the mall
Location: Citizen Burger
Budget:
Start Date: 08/14/18
Project Manager: Therese Devlin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Market St
Description: Landscape construction equipment
Location:
Budget:
Start Date: 08/06/18
Project Manager: Chris Allard - Production Coordinator
Status: Archived Closure
Comments: EXTENDED to 8/6

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Market St
Description: Photo Shoot
Location: 311 E Market St
Budget:
Start Date: 05/26/19
Project Manager: Will May
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Market St
Description: Blood Dirve
Location: Alley between Police and Garage on Market St
Budget:
Start Date: 07/19/19
Project Manager: Jamie Valencia
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Market Street
Description: The Paramount Event Parking Closures
Location: Market
Budget:
Start Date: 11/01/18
Project Manager: Paramount
Status: Archived Closure
Comments: December 1-2,4-12

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Market Street
Description: Sprint Pavilion
Location: 700 block
Budget:
Start Date: 08/03/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Marshall St
Description: Sidewalk repair.
Location: Marshall St at Watson and Davis Ave
Budget:
Start Date: 06/21/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Mason Ln
Description:
Location: 1620 Mason Ln - Scotts Backhoe
Budget:
Start Date: 10/26/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Maury Ave
Description:
Location: 113 Maury Ave - Linco
Budget:
Start Date: 10/05/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: McIntire Rd
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: 714 McIntire Rd - Comcast
Budget:
Start Date: 07/08/20
Project Manager: Bryan McDearmon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: McIntire Rd
Description: Lane closure and intersection work with flaggers present.
Location: McIntire Rd between Pery Dr and Preston Ave
Budget:
Start Date: 08/19/19
Project Manager: Noland Silman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: McIntire Rd
Description: Lane closure and intersection work with flaggers present.
Location: McIntire Rd between Preston Ave and Perry Dr
Budget:
Start Date: 09/11/19
Project Manager: Noland Silman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: McIntire Rd
Description: Moving
Location: 718 McIntire Rd
Budget:
Start Date: 08/27/19
Project Manager: M. Burns
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: McIntire Rd
Description: Shoulder closure for new water meter installment.
Location: Lane Babe Ruth Field
Budget:
Start Date: 03/04/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Mcintire Rd
Description: Sidewalk closure for sidewalk replacement.
Location: 500 Mcintire Rd in fornt of the apartments
Budget:
Start Date: 05/07/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: McIntire Rd
Description: Sidewalk closure for installation of new sidewalk section
Location: 510
Budget:
Start Date: 04/11/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: McIntire Rd - Michael and Son
Description:
Location: 610 McIntire Rd
Budget:
Start Date: 03/01/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meade Ave
Description:
Location:
Budget:
Start Date: 12/06/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meade Ave
Description: Tree work.
Location: Meade Ave near E Market St - Arboristry
Budget:
Start Date: 10/25/20
Project Manager: Sean Schanbacher
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meade Ave
Description:
Location: Meade Ave near E Market St - Arboristry
Budget:
Start Date: 11/04/20
Project Manager: Sean Schanbacher
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meade Ave
Description:
Location: 430 Meade Ave
Budget:
Start Date: 08/05/19
Project Manager: Dusty Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meade Ave - Dominion
Description: Dominion Utility Work.
Location: Eastmost sidewalk between Fairway Ave & Caroline Ave
Budget:
Start Date: 02/21/24
Project Manager:
Status: Archived Closure
Comments: No permit. Improper Sidewalk Closure.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meade-Lumos
Description:
Location: E High St & Meade Ave between Hazel St & Stewart St
Budget:
Start Date: 04/18/22
Project Manager: Jared Morris / Senior Manager OSP Engineering
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meadowbrook Heights
Description:
Location: Intersection of King Mtn Rd - Commonwealth Excavating
Budget:
Start Date: 11/13/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meadowbrook Heights
Description: Lane closure with flaggers.
Location: Meadowbrook Heights near King Mtn Rd - Commonwealth Excavating
Budget:
Start Date: 01/13/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meadowbrook Heights Rd
Description:
Location: Between Grove St and RT 250
Budget:
Start Date: 03/30/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Melbourne Rd
Description:
Location: Melbourne Rd near John Werner Pkwy - TriState Utilities
Budget:
Start Date: 03/16/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Melbourne Rd
Description: Bridge inspection, flagging operation
Location: Sequential lane closures NBL/SBL
Budget:
Start Date: 10/19/18
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Melbourne Rd
Description:
Location: Near Charlottesville High School - Kokosing
Budget:
Start Date: 10/19/21
Project Manager: Brandon Herbert
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Melbourne Rd
Description: This is a long term closure to be controlled by a traffic signal in each direction.
Location: NB lane between Grove Ct and JW Parkway
Budget:
Start Date: 06/07/21
Project Manager: Brandon Herbert
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Melbourne Rd
Description: Daytime operation intermittent days, mostly weekdays.
Location: Melbourne Rd over NFS Railroad - Kokosing
Budget:
Start Date: 04/26/21
Project Manager: Brandon Herbert
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Melbourne Rd - City Graduation
Description:
Location: Melbourne between Grove Ct. and John Warner parkway
Budget:
Start Date: 06/05/21
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Melbourne Rd - Corman
Description:
Location: Melbourne between Grove Ct. and John Warner parkway
Budget:
Start Date: 05/17/21
Project Manager: Brandon herbert
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Melbourne Rd at 10th St NW
Description: This is an intermittent closure that wil be in effect as the weather allows for overhead line maintenance.
Location: Melbourne Rd at 10th St NW - Dominion Energy
Budget:
Start Date: 04/30/21
Project Manager: Dominion Energy
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Melissa Pl
Description:
Location: Melissa Pl - SL Williamson
Budget:
Start Date: 06/17/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Melissa Pl
Description:
Location: Melissa Pl - Cul De Sac - Linco
Budget:
Start Date: 12/06/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meridian St
Description:
Location: South of Rougemont Ave - Linco
Budget:
Start Date: 08/05/21
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meridian St
Description:
Location: 1659 Meridian St - Dominion
Budget:
Start Date: 10/15/21
Project Manager: Kelly Maxwell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meridian St - S.L. Williamson
Description: Milling and Paving
Location: Druid Ave to Rockland Ave
Budget:
Start Date: 04/09/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meridian St - S.L. Williamson
Description: Milling and Paving
Location:
Budget:
Start Date: 10/09/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Meridian St - S.L. Williamson
Description: Milling and Paving
Location:
Budget:
Start Date: 10/09/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Millmont St
Description: POD
Location: 954 Millmont St
Budget:
Start Date: 08/05/20
Project Manager: Jonathan Campbell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Millmont St
Description: POD
Location: Millmont St - POD
Budget:
Start Date: 08/04/20
Project Manager: Kelcie Schofield
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Millmont Street - Lumos
Description:
Location: 1149 Millmont Street
Budget:
Start Date: 06/20/23
Project Manager: Brandon Whitton
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Minor Rd
Description:
Location: 109 Minor Rd
Budget:
Start Date: 06/09/20
Project Manager: Dusty Christian
Status: Archived Closure
Comments: This is a sidewalk and street closure not in excess of 48 hours.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Minor Rd
Description: This sidewalk closure is not in excess of 48 hours.
Location: 109 Minor Rd - Christian and Assoc.
Budget:
Start Date: 05/14/20
Project Manager: Dusty Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Minor Rd
Description:
Location:
Budget:
Start Date: 08/23/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Minor Rd - S.L. Williamson
Description: Milling and Paving
Location:
Budget:
Start Date: 10/30/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Mobile Ln
Description:
Location: 17 Mobile Ln - SBH
Budget:
Start Date: 12/28/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monitcello Ave
Description: Outside lane closure with merge.
Location: Between 6th St SE and 2nd St SE - TriState
Budget:
Start Date: 09/02/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monitcello Rd
Description:
Location: Monticello Rd at Levy Ave and Graves St - Commonwealth Excavating Inc
Budget:
Start Date: 03/11/21
Project Manager: Tommy Burke
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monroe Lane
Description: Utility potholing. Lane shift and sidewalk closure
Location:
Budget:
Start Date: 11/12/18
Project Manager: Andrew Cox - Asst. Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monroe Lane
Description: Construction delivery, 2 parking space closures
Location: 400 block
Budget:
Start Date: 12/07/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monroe Lane
Description: Loading moving truck.
Location: 400 Block Monroe Lane
Budget:
Start Date: 05/10/19
Project Manager: Catherine Keller
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monte Vista Ave
Description: 2 parking space closure for moving vehicle
Location: 119 Monte Vista
Budget:
Start Date: 08/05/18
Project Manager: Jennifer Sessions
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monte Vista Ave
Description: Dominion Energy overhead work. This is a road closure with flagging operation.
Location: Monte Vista Ave - Dominion Energy
Budget:
Start Date: 03/01/20
Project Manager: Pam Johnson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monte Vista Ave
Description: Installing sidewalk and curb.
Location: 118 Monte Vista Ave
Budget:
Start Date: 10/08/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monte Vista Avenue - MSR Concrete
Description:
Location: 114 Monte Vista Avenue
Budget:
Start Date: 05/15/23
Project Manager: Michael Rausch
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montebello Cir
Description:
Location: Between JPA and 317 Montebello Cir - Lumos
Budget:
Start Date: 05/11/20
Project Manager: Jared Morris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montebello Cir
Description:
Location:
Budget:
Start Date: 07/22/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montebello Cir
Description: No thru traffic. Concrete pump to building
Location:
Budget:
Start Date: 12/13/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montebello Circle
Description:
Location:
Budget:
Start Date: 12/27/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montebello Circle
Description: Street and parking closure for concrete pour
Location: 300 Montebello to JPA
Budget:
Start Date: 01/14/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montebello Circle
Description: POD
Location: 200 blcok of Montebello Cir
Budget:
Start Date: 07/12/19
Project Manager: Gina O'neil
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montebello Circle - Chad Backhoe
Description:
Location: 303 Montebello Circle
Budget:
Start Date: 05/11/23
Project Manager: Chad Reuschling
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montebello Rd
Description: Street closure for concrete pump
Location:
Budget:
Start Date: 11/21/18
Project Manager: Kenny George - Superintendent
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description: 6 Parking space closures. Work done in street for manhole, traffic directed through parking lane.
Location:
Budget:
Start Date: 10/05/18
Project Manager: Daniel Devlin - President
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description: Tree work.
Location: Between Avon and 6th St SE
Budget:
Start Date: 05/30/19
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description: Parking for a lift.
Location: 105 Monticello Ave
Budget:
Start Date: 05/16/19
Project Manager: Clyde Harris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description: 1 parking space closure for dumpster
Location: 803 Monticello Ave
Budget:
Start Date: 04/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description: 1 parking space closure for dumpster
Location:
Budget:
Start Date: 07/26/18
Project Manager: George Herring- Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description: 2 parking space closure, Office relocation
Location:
Budget:
Start Date: 10/22/18
Project Manager: Rachael Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description: Equipment.
Location: 100 block of Monticello Ave
Budget:
Start Date: 07/17/19
Project Manager: Adam Worthy
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description: Weekday work only. Hours of operation to be from 8am - 2:30pm.
Location: 909 Monticello Ave - Christian and Assoc.
Budget:
Start Date: 02/10/20
Project Manager: Dusty Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description:
Location: 807 Monticello Ave - VYTC
Budget:
Start Date: 01/14/21
Project Manager: William Allen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description:
Location: At Carlton Rd intersection - Linco
Budget:
Start Date: 05/18/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description:
Location: Between Druid Ave and Avon St - Linco
Budget:
Start Date: 05/27/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description:
Location: Between Montrose Ave and Altavista Ave - Linco
Budget:
Start Date: 05/18/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave
Description: This closure is not in excess of 48 hours.
Location: Various along Monticello Ave from Avon St to Bolling Ave - TriState
Budget:
Start Date: 07/09/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave - Linco
Description:
Location:
Budget:
Start Date: 06/07/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave - Public Works
Description: Sidewalk resurfacing
Location: 300 Ridge St (Monticello Southernmost sidewalk)
Budget:
Start Date: 08/30/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Ave - S.L. Williamson
Description: Milling and Paving
Location: Between 6th St SE & Avon St
Budget:
Start Date: 10/30/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Avenue
Description: 2 parking space closure for event
Location: 100 block
Budget:
Start Date: 12/04/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Rd
Description:
Location: Druid Ave to Montrose Ave - TriState Utilities
Budget:
Start Date: 04/13/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Rd
Description: Sanitary sewer inspections. Flaggers present.
Location: Monticello Rd from Druid Ave to Carlton Ave
Budget:
Start Date: 07/22/19
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Rd
Description:
Location: 338 Monitcello Rd
Budget:
Start Date: 09/17/19
Project Manager: Jeremy Crowler
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Rd
Description:
Location: Between Levy Ave and Graves St
Budget:
Start Date: 09/09/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Rd
Description:
Location: 337 Monticello Rd - VYTC
Budget:
Start Date: 07/01/21
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Rd
Description:
Location: Levy Ave to Graves St - Commonwelath Excavating
Budget:
Start Date: 01/04/21
Project Manager: Tommy Burke
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Rd
Description:
Location: Levy Ave to Graves St
Budget:
Start Date: 12/10/20
Project Manager: Tommy Burke
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Rd
Description:
Location: Monticello Rd near Graves St - Accumark
Budget:
Start Date: 06/10/20
Project Manager: James Brooks
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Rd - S.L. Williamson
Description: Milling and Paving
Location:
Budget:
Start Date: 10/16/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Monticello Rd, Blenheim Ave, and Montrose Ave
Description:
Location: Monticello Ave, Blenheim Ave, and Montrose Ave - Tri State
Budget:
Start Date: 03/30/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montrose Ave
Description: Demolition
Location: 800 Montrose Ave - IBS
Budget:
Start Date: 12/11/19
Project Manager: Integrity Building Services
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montrose Ave
Description: Underground utilities work.
Location: 720 Montrose Ave
Budget:
Start Date: 08/28/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montrose Ave
Description: Street closed to thru traffic for water and sewer abandonment.
Location: Montrose Ave
Budget:
Start Date: 06/10/19
Project Manager: Quinn Durnien
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montrose Ave
Description:
Location: 900 Montrose Ave
Budget:
Start Date: 06/15/20
Project Manager: Caitlin Welch
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montrose Ave
Description:
Location: Montrose Ave - TriState
Budget:
Start Date: 01/13/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Montrose Ave
Description:
Location:
Budget:
Start Date: 01/21/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Moore Avenue - Linco Inc.
Description:
Location: Moore Avenue from Hazel Street to Grace Street
Budget:
Start Date: 04/26/23
Project Manager: Troy Wright
Status: Archived Closure
Comments: M-F Only

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Moseley Dr
Description: Emergency sewer repair.
Location: 410 Moseley Dr - Scotts Backhoe
Budget:
Start Date: 02/20/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Mowbray Pl
Description:
Location: Mowbray pl - Linco
Budget:
Start Date: 06/01/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Nalle St
Description:
Location: 720 Nalle St
Budget:
Start Date: 03/04/20
Project Manager: Reva Nowell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Nalle St - Lambert
Description: 2 parking spots for moving truck.
Location: 715 Nalle St
Budget:
Start Date: 05/01/21
Project Manager: Kristin Lambert
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Nassau St
Description:
Location: Between Hampton St and Florence Rd - FCC
Budget:
Start Date: 02/02/21
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Nassau St
Description: This closure is less than 48 hours.
Location: 817 Nassau St - Digs Inc
Budget:
Start Date: 07/30/20
Project Manager: Gretchen Woods
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Nassau St
Description:
Location: 812 - 820 Nassau St - Backhoe Bobs
Budget:
Start Date: 01/15/20
Project Manager: Darrin Duvalois
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Nassau St
Description: This is a sidewalk closure not in excess of 48 hours. The sidewalk closure dates are 12/17 and 12/18.
Location: 812 & 820 Nassau St - Backhoe Bobs
Budget:
Start Date: 12/17/19
Project Manager: Darrin Duvalois
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Nassau St
Description: Relocation of Dominion Energy and Comcast cables for apartments project.
Location: Nassau St between Carlton Ave and Sunrise Park Lane
Budget:
Start Date: 06/03/19
Project Manager: Mandy Burbage
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Nassau St
Description: This is a road closure with detour. Drivers will directed around this section of Nassau and onto Rives St via Florence Rd and Hampton St.
Location: 812 Nassau St to 820 Nassau St
Budget:
Start Date: 10/07/19
Project Manager: Jennifer Haight
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Northwood Ave
Description: Parking spot.
Location: 700 Block
Budget:
Start Date: 10/08/19
Project Manager: Megan Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Oak St
Description:
Location: 306 Oak St - Latitude 38 LLC
Budget:
Start Date: 11/18/19
Project Manager: Jeff Erkelens
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Oakhurst Cir
Description: Paving operation to repair hole in roadway.
Location: Oakhurst Cir
Budget:
Start Date: 04/29/19
Project Manager: Jeff Gray
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Oakhurst Circle
Description: Closure of sidewalk to install handicap ramp
Location: Between driveway of 122 Oakhurt Circle and exit to JPA
Budget:
Start Date: 11/19/18
Project Manager: Mike Christian
Status: Archived Closure
Comments: DATES CHANGED

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Old Lynch Rd
Description:
Location:
Budget:
Start Date: 08/09/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Old Lynchburg Road - Dominion
Description: Flagging operation for overhead line and replacing poles.
Location: JPA to Montevista to Middleton to OLR to Azalea Park
Budget:
Start Date: 04/26/21
Project Manager: Pam Johnson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Old Lynchburg Road - Linco Inc.
Description:
Location: Old Lynchburg Road
Budget:
Start Date: 02/27/23
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Old Preston Ave
Description: This sidewalk closure is not in excess of 48 hours.
Location: 115 Old Preston Ave - EM Construction (Crane)
Budget:
Start Date: 02/24/21
Project Manager: Edward Muller
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Old Preston Ave
Description:
Location: Old Preston Ave
Budget:
Start Date: 09/18/20
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Old Preston Ave
Description: This road is closed for placement of a crane during the day.
Location: Old Preston Ave - Cii Service
Budget:
Start Date: 07/22/20
Project Manager: Bob Cote
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Old Preston Ave
Description: Craning equipment on top of Omni
Location:
Budget:
Start Date: 11/29/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Old Preston Ave
Description: Parking spot closure for construction equipment.
Location: 110 Old Preston Ave
Budget:
Start Date: 04/01/19
Project Manager: Daniel Showalter
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Old Preston Ave
Description:
Location: 114
Budget:
Start Date: 02/22/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Old Preston Ave
Description:
Location: Old Preston Ave
Budget:
Start Date: 08/12/19
Project Manager: Drew Dunnigton
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Olinda Dr - SL Williamson
Description: Milling & Paving
Location: Briarcliff Ave to End
Budget:
Start Date: 04/05/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Orange St. - Linco
Description: Water Utility Improvement
Location:
Budget:
Start Date: 05/01/23
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Orange St. - Linco
Description: Remove/Replace existing sidewalk.
Location:
Budget:
Start Date: 10/23/23
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Oxford Pl
Description: Emergency tree removal.
Location: 1306 Oxford Pl
Budget:
Start Date: 07/06/20
Project Manager: Parker Jeanette
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Oxford Rd - Evergreen
Description: Construction equipment delivery
Location: 1600 - 1628 Oxford Rd
Budget:
Start Date: 04/12/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Oxford Rd - Ting Internet
Description: Fiber Installation
Location:
Budget:
Start Date: 04/10/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Page St
Description: Construction of new sidewalk around city park.
Location: 8th St Lane - Vess Excavating
Budget:
Start Date: 01/04/21
Project Manager: Ron Rohr
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Page St
Description:
Location: Page St - Vess Excavating
Budget:
Start Date: 12/07/20
Project Manager: Ron Rohr
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Page St
Description: Repair sidewalk.
Location: in fornt of 905 Page St
Budget:
Start Date: 08/13/19
Project Manager: Peter Frieslander
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Page St
Description: Replacing old sidewalk.
Location: 905 Page St
Budget:
Start Date: 08/29/19
Project Manager: Peter Frieslander
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Page St
Description: Water line work to include a lateral installation.
Location: 905 Page St
Budget:
Start Date: 06/06/19
Project Manager: Peter Frieslander
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Page St
Description:
Location: 905 Page St
Budget:
Start Date: 08/07/19
Project Manager: Dusty Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Page St
Description:
Location: Between 8th St NW and 7th St NW
Budget:
Start Date: 02/19/20
Project Manager: Bobby Vess
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Page St - Linco
Description:
Location: Page Street East of 10th
Budget:
Start Date: 02/07/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Palatine Ave
Description:
Location:
Budget:
Start Date: 09/02/21
Project Manager: Smith
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Palatine Ave
Description:
Location: Palatine Ave up to Quarry Rd - Dominion
Budget:
Start Date: 03/16/20
Project Manager: Pam Johnson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Palatine Rd
Description: POD Parking space closure
Location: 255
Budget:
Start Date: 02/23/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Park Hill
Description:
Location: To Dead End - SL Williamson
Budget:
Start Date: 08/25/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Park Lane E
Description:
Location: To Dead End - SL Williamson
Budget:
Start Date: 08/25/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Park Ln E
Description:
Location: Park Ln E - Linco
Budget:
Start Date: 08/06/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Park Rd
Description: Shoulder closure operation.
Location: Park Rd near JPA - Linco
Budget:
Start Date: 03/09/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Park St
Description:
Location: Between E High St and Hedge St
Budget:
Start Date: 11/25/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Park St
Description: Tree work.
Location: 408 Park St - Arboristry
Budget:
Start Date: 12/07/19
Project Manager: Sean Schanbacher
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Park St
Description:
Location: 735 Park St - Linco
Budget:
Start Date: 06/08/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Park Street - Van Yahres
Description:
Location: 715 Park Street
Budget:
Start Date: 05/24/23
Project Manager: Bryan Rauscher
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Park Street and E High - Lumos
Description:
Location: North side of E High St. from 402 Park St. to 401 Park St. then down Park St. from 401 Park St. to 408 Park St
Budget:
Start Date: 04/03/23
Project Manager: Chris Kopcak
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Park Street and E High - Lumos
Description:
Location: North side of E High St. from 402 Park St. to 401 Park St. then down Park St. from 401 Park St. to 408 Park St
Budget:
Start Date: 03/14/23
Project Manager: Chris Kopcak
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Parker Pl
Description:
Location:
Budget:
Start Date: 11/17/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Parkway St
Description: POD street placement
Location:
Budget:
Start Date: 08/20/18
Project Manager: Nancy McDaniel
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Paton St
Description: 3 parking space closure for moving truck
Location:
Budget:
Start Date: 08/10/18
Project Manager: Lwamba Celestin
Status: Archived Closure
Comments: changed from 4 parking spaces to 3

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Peartree Lane
Description: Dumpster.
Location: 1013 Peartree Lane
Budget:
Start Date: 09/20/19
Project Manager: Rebecca Shifflett
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Peartree Ln - Scott's
Description: Water Line installation. TTC 23.1 modified residential.
Location: 1006 Peartree Ln
Budget:
Start Date: 08/16/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Pedestrian Downtown Mall
Description: Painting and cleaning York Place
Location:
Budget:
Start Date: 10/22/18
Project Manager: Pedro Dominguez
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Pedestrian Downtown Mall
Description: Restaurant hood cleaning, mall sidewalk closure
Location:
Budget:
Start Date: 10/30/18
Project Manager: Michael Rodi
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Pedestrian Mall / W. Main Street
Description: Crane access
Location: next to 112 W. Main on mall
Budget:
Start Date: 11/07/18
Project Manager: Eddie Karolinissen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Pedestrian Mall / W.Main St
Description: Crane on pedestrian mall to replace HVAB units at 414 E.Main st
Location:
Budget:
Start Date: 11/14/18
Project Manager: Mike Carrico
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Perry Dr / Wine St / Northwood Ave - Linco
Description: City of Charlottesville Water Main installation
Location: 100 block Perry Dr / 200 block Wine St
Budget:
Start Date: 10/30/23
Project Manager: Troy Wright
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Peterson Pl
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: Peteron Pl
Budget:
Start Date: 10/29/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Peterson Place
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: Off of Grove Rd.
Budget:
Start Date: 10/14/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Piedmont Ave
Description:
Location: Piedmont Ave - Digs
Budget:
Start Date: 02/24/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Piedmont Ave N - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 129 Piedmont Ave. N.
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Piedmont Ave S
Description:
Location: Piedmont Ave S - Linco
Budget:
Start Date: 11/30/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description:
Location: 608 Preston Ave - Scott's Backhoe
Budget:
Start Date: 10/15/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description:
Location: Southbound lane from Grady Ave and 9th St NW - SL Williamson
Budget:
Start Date: 08/07/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Left turn lane closure onto Madison Ave from Preston Ave
Location: South of Madison Ave - Commonwealth Excavating
Budget:
Start Date: 08/19/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: No weekend work.
Location: Between Madison Ave and Cabell Ave - Linco
Budget:
Start Date: 01/03/22
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description:
Location: Between Grady Ave and Rose Hill Dr. - Momentum
Budget:
Start Date: 12/11/19
Project Manager: Mark Wagner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description:
Location: Preston Ave at 10th St NW - Momentum
Budget:
Start Date: 02/28/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description:
Location: Preston Ave (inside southbound lane south of Grady Ave) - Momentum
Budget:
Start Date: 02/10/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Sidewalk closure, less than 48 hours, and road work 10/8-10/9. Road work through 10/10.
Location: Preston Ave between Rugby Ave and Rugby Rd
Budget:
Start Date: 10/08/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Median work for Century Link.
Location: Preston Ave between 9th St and grady Ave
Budget:
Start Date: 09/11/19
Project Manager: Mark Wagner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description:
Location: Preston Ave at the Preston Square Apartments
Budget:
Start Date: 10/14/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Installing water meter.
Location: Preston Ave between 4th St NW and 8th St NW - Linco
Budget:
Start Date: 11/23/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Manhole access.
Location: Right turn lane on Preston Ave from 4th St
Budget:
Start Date: 09/10/19
Project Manager: Theresa Bryant
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Utilities work.
Location: Preston Ave between Hemlock Ln and Cabell Ave
Budget:
Start Date: 07/10/19
Project Manager: Jonatahn Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Manhole Replacement.
Location: Intersection of Preston Ave and Madison Ave
Budget:
Start Date: 07/01/19
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Utilities work. Flagging operation.
Location: Preston Ave between Hemlock Ln and Cabell Ave (Flaggers present)
Budget:
Start Date: 07/10/19
Project Manager: Jonatahn Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Installing water service. One lane blocked with flaggers.
Location: 1306 Preston Ave
Budget:
Start Date: 07/10/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Interior lanes of westbound and eastbound traffic will be directed to merge into the outside lane from 5/27/2019 thru 6/27/2019 for sidewalk, roadway, and crosswalk improvements. The westbound lane's sidewalk will be closed on Preston Ave from Harris St to Forest St from 6/7/2019 thru 6/17/2019 for ADA curb ramp installation.
Location: 722 Preston Ave between Harris St and Forest St
Budget:
Start Date: 05/27/19
Project Manager: Joseph Simpson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave
Description: Installing new water service for city, lane weave
Location:
Budget:
Start Date: 09/17/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments: 9/17, 9/18,9/21 7AM - 5PM

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave - S.L. Williamson
Description: Milling and Paving
Location: Preston Ave between Rugby Rd and 10th St NW.
Budget:
Start Date: 09/05/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave - S.L. Williamson
Description: Milling and Paving
Location: Preston Ave between Rugby Rd and 10th St NW.
Budget:
Start Date: 08/31/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave - S.L. Williamson
Description: Milling and Paving
Location: Preston Ave between Rugby Rd and 10th St NW.
Budget:
Start Date: 08/31/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave - Ting Internet
Description: Fiber Installation
Location:
Budget:
Start Date: 04/10/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave and Harris Street
Description: Right hand lane just past 4th on Preston, median Preston. West side lane of Harris Street
Location:
Budget:
Start Date: 11/27/18
Project Manager: Theresa Bryant
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Ave Closure
Description: Sidewalk closure on Preston Ave between 10th St NW thru Madison Ave on side of Washington Park. Will be closed for two days. Repairing storm water DI box. Storm water Utilities
Location: Preston Ave between 10th St NW thru Madison Ave on side of Washington Park
Budget:
Start Date: 03/12/19
Project Manager: Utilities
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Avenue
Description: Street closure for installation of storm sewer across Preston Ave. Phase I: Preston Westbound right lane closure. Phase II: Preston Eastbound left lane closure. Phase III: Preston Eastbound right lane closure.
Location: Off Preston & Grady Avenue intersection
Budget:
Start Date: 01/09/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Pl
Description:
Location: 632 Preston Pl - Monarch Concrete
Budget:
Start Date: 11/02/20
Project Manager: Mike Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Place
Description: 4 parking space closure: 2 on Preston place, 2 on Grady Ave
Location: Preston Place Apartments
Budget:
Start Date: 02/18/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Place
Description: 4 parking space closure: 2 on Preston place, 2 on Grady Ave
Location: Preston Place Apartments
Budget:
Start Date: 02/18/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Place
Description: Parking space closure for construction work at 1600 Grady
Location: 1600 Grady Avenue
Budget:
Start Date: 02/11/19
Project Manager:
Status: Archived Closure
Comments: Extension

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Place
Description: A short section of Preston Place will be closed on the east side of 1601 Grady Ave. Vehicles will still have access to Preston Place via the west entrance onto Preston Place.
Location: Preston Place
Budget:
Start Date: 09/03/19
Project Manager: Andrew Weldon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Preston Place - Van Yahres
Description:
Location: 630 Preston Place
Budget:
Start Date: 06/02/21
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Price Ave - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: 2313 Price Ave
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Prospect - Tri State
Description:
Location:
Budget:
Start Date: 03/02/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Quarry Rd
Description:
Location: Quarry Rd - Linco
Budget:
Start Date: 03/01/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Quarry Rd
Description:
Location: 400 Quarry Rd - CEVA
Budget:
Start Date: 05/19/20
Project Manager: Charlie Hurt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rainier Rd
Description:
Location: 800 block of Rainier Rd. - Timber Stone Group
Budget:
Start Date: 05/27/20
Project Manager: Mean Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Raymond Ave
Description:
Location: 114 Raymond Ave - Commonwealth Excavating
Budget:
Start Date: 07/27/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rayon St
Description:
Location: Rayon St at Elliot Ave - Digs
Budget:
Start Date: 08/20/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rayon St - SL Williamson
Description: Milling & Paving
Location: Elliot Street to End
Budget:
Start Date: 04/15/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rayon St - SL Williamson
Description: Milling & Paving
Location: Elliot Street to End
Budget:
Start Date: 04/15/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rialto
Description:
Location: Intersection of Rialto and Rockland
Budget:
Start Date: 02/07/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rialto - Nola
Description:
Location:
Budget:
Start Date: 04/12/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rialto St
Description:
Location: Between Montrose and Blenheim - Linco
Budget:
Start Date: 02/09/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rialto St
Description:
Location:
Budget:
Start Date: 01/15/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ricky Rd
Description:
Location: 1608 Ricky Rd - Chads Backhoe
Budget:
Start Date: 02/17/21
Project Manager: Chad Reuschling
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge McIntire Rd
Description: NB, right lane closure operation with lane weave and East sidewalk closure.
Location: 300 Preston Avenue
Budget:
Start Date: 04/29/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: Installment of new water meter for the City
Location: 218 & 211 Ridge St
Budget:
Start Date: 04/01/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: Installment of new water meter for the City
Location: 218 & 211 Ridge St
Budget:
Start Date: 04/01/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: Backfilling the project.
Location: Ridge St at Cherry Ave and Elliot Ave
Budget:
Start Date: 08/27/19
Project Manager: Whitney Hoffacker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description:
Location: 423 Ridge St
Budget:
Start Date: 08/08/19
Project Manager: Whitney Hoffhacker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: Waterline connection.
Location: SB Right Turn Lane of Ridge St at Cherry Ave
Budget:
Start Date: 09/24/19
Project Manager: Whitney Hoffhacker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: Backfilling at project on the corner. Right turn lane closure will be intermittent.
Location: Ridge St at Cherry Ave, Right turn lane onto Cherry Ave
Budget:
Start Date: 07/24/19
Project Manager: Whitney Hoffacker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description:
Location: Ridge St near Elliot Ave - Wagner
Budget:
Start Date: 01/10/20
Project Manager: Whitney Hoffacker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: This is a sidewalk closure not in excess of 48 hours.
Location: 721 Ridge St
Budget:
Start Date: 03/17/20
Project Manager: Theresa Devin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description:
Location: Ridge St near Cherry Ave - Wagner Construction
Budget:
Start Date: 03/19/20
Project Manager: Whitney Hoffacker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: Turn lane closure dates: 12/30, 1/2, 1/6, and 1/8.
Location: Turn Lane on Ridge St at Elliot Ave
Budget:
Start Date: 12/30/19
Project Manager: Whitney Hoffacker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: This is a street and sidewalk closure less than 48 hours to facilitate installation of an air conditioning unit.
Location: Ridge St at W Main St
Budget:
Start Date: 10/22/19
Project Manager: Mark Livingston
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: Water line repair.
Location: 608 Ridge St
Budget:
Start Date: 10/24/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: Eradicating pavement markings at temporary crosswalk.
Location: Just north of Cherry Ave - Caton
Budget:
Start Date: 08/11/20
Project Manager: Whitney Hoffacker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description: This is a sidewalk closure not in excess of 48 hours.
Location: 879 Ridge St - Linco
Budget:
Start Date: 11/17/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description:
Location: 300 W Main St on Ridge St side - Monarch
Budget:
Start Date: 05/25/20
Project Manager: Michael Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description:
Location: Ridge St near 5th St SW - TriState
Budget:
Start Date: 05/12/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description:
Location: Section of Ridge St between 5th St SW and the fork on Ridge St - Commonwealth Exc.
Budget:
Start Date: 04/29/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description:
Location: Ridge St at Cherry Ave - Caton Constr.
Budget:
Start Date: 04/28/20
Project Manager: Whitney Hoffacker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description:
Location: Ridge St at Cherry Ave - Caton
Budget:
Start Date: 07/27/20
Project Manager: Whitney Hoffacker
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St
Description:
Location:
Budget:
Start Date: 10/19/21
Project Manager: Michael Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St & Monticello Ave
Description: Left turn lane of Ridge St onto Monticello Ave will be closed. Right turn lane of Monticello onto Ridge Street will be closed. Installment of new water for the City.
Location: Ridge St & Monticello Ave intersection
Budget:
Start Date: 04/01/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St & Monticello Ave
Description: Left turn lane of Ridge St onto Monticello Ave will be closed. Right turn lane of Monticello onto Ridge Street will be closed. Installment of new water for the City.
Location: Ridge St & Monticello Ave intersection
Budget:
Start Date: 04/01/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St & Monticello Ave
Description: Installing water meter for City
Location: Intersection of Ridge and Monticello
Budget:
Start Date: 01/07/19
Project Manager: NDS
Status: Archived Closure
Comments: 1/11 update: Delayed, dates not known.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St and Hartmans Mill Rd
Description: Overhead power work.
Location: Ridge St and Hartmans Mill Rd - Dominion
Budget:
Start Date: 12/01/20
Project Manager: Pam Johnson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge St at Monticello Ave
Description: Repairing crosswalk wiring conduit.
Location: Intersection of Ridge ST at Monticello Ave
Budget:
Start Date: 08/31/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge Street
Description: Installing new water meter for City. Right shoulder and parking lane closed.
Location: 511 Ridge St
Budget:
Start Date: 01/10/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge Street
Description:
Location: Between Cherry Ave and Oak St
Budget:
Start Date: 02/04/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge Street
Description: Installing new water meter for City
Location:
Budget:
Start Date: 10/31/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ridge Street
Description: New construction. Sidewalk closure
Location:
Budget:
Start Date: 10/18/18
Project Manager: India Hill
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: River Ct
Description:
Location: 1100 River Ct
Budget:
Start Date: 10/24/19
Project Manager: Lindsey Reininger
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: River Rd
Description:
Location: River Rd at Belleview - Liberty Solutions
Budget:
Start Date: 10/07/20
Project Manager: Jim McGennis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: River Rd
Description:
Location: Between Belleview Ave and Coleman St - Liberty Solutions
Budget:
Start Date: 06/24/20
Project Manager: Jim McGennis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: River Rd
Description:
Location: River Rd at Belleview - Liberty Solutions
Budget:
Start Date: 12/22/21
Project Manager: Christine Vaughn
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Riverdale Rd - Linco
Description:
Location:
Budget:
Start Date: 01/10/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rives St
Description:
Location:
Budget:
Start Date: 01/14/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Robertson Ave
Description: This is a street closure with a detour. Vehicles will be detoured to Cherry Ave and Robertson Ave.
Location: 304 Robertson Ave on the Highland Ave side - Scotts Backhoe
Budget:
Start Date: 07/01/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Robinson Place - SL Williamson
Description: Milling & Paving
Location: 400 - 404 (between Ware & Rayon St.)
Budget:
Start Date: 04/15/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rock Creek Rd
Description:
Location:
Budget:
Start Date: 01/25/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rockcreek Rd
Description:
Location: Cherry Ave to Laurel Cir - TriState
Budget:
Start Date: 06/28/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rockcreek Rd
Description: POD
Location: 707 Rockcreek Rd.
Budget:
Start Date: 05/06/19
Project Manager: Lisa Phillips
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rockland Ave
Description: POD parking
Location:
Budget:
Start Date: 04/05/21
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rockland Ave
Description:
Location: Rockland Ave to 6th St SE - Linco
Budget:
Start Date: 08/10/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rockland Ave
Description:
Location:
Budget:
Start Date: 09/11/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Roosevelt Brown
Description:
Location: Roosevelt Brown at Lee St - Linco
Budget:
Start Date: 04/28/20
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Roosevelt Brown Blvd
Description: New water main installation.
Location: Between W Main St and Grove St
Budget:
Start Date: 10/28/19
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Roosevelt Brown Blvd
Description:
Location: Just south of the W Main St intersection - Linco
Budget:
Start Date: 05/18/20
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Roosevelt Brown Blvd
Description: Roosevelt Brown Blvd will have a merge in the southbound lane from W Main St. Grove St will be closed to thru traffic as well with a detour in place.
Location: W Main St to Cherry Ave - Linco
Budget:
Start Date: 05/26/20
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Roosevelt Brown Blvd - 1hr. - Schnabel
Description: Temporary street closure for a period of up to 1 hr. Motorists to follow guidance of flaggers. Drill samples for Rivanna Water & Sewer Authority.
Location: Roosevelt Brown Blvd x Grove St.
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Roosevelt Brown, Cherry, Willard - WANRack
Description: Fiber Installation (Aerial / Underground)
Location: Various (TBD)
Budget:
Start Date: 04/17/24
Project Manager:
Status: Active Closure
Comments: Itinerary Schedule TBD

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Roosevelt Brown, Cherry, Willard - WANRack
Description: Fiber Installation (Aerial / Underground)
Location: Various (TBD)
Budget:
Start Date: 04/24/24
Project Manager:
Status: Future Closure
Comments: Itinerary Schedule TBD

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Roosevelt Brown, W Main, and 10th St
Description:
Location: Roosevelt Brown, W Main, and 10th St - Linco
Budget:
Start Date: 12/15/19
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill and Rugby - Linco
Description:
Location: Intersection of Rose Hill Drive and Rugby Road
Budget:
Start Date: 07/05/23
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill and Rugby - Linco
Description:
Location: Intersection of Rose Hill Drive and Rugby Road
Budget:
Start Date: 06/21/23
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill Dr
Description: Shoulder and parking spot closures for storm drain inspections.
Location: Dale Ave to Charlton Ave - Tri-State Utilities
Budget:
Start Date: 11/04/19
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill Dr
Description:
Location: Between Dale Ave and Charlton Ave
Budget:
Start Date: 03/17/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill Dr
Description: Storm sewer work.
Location: Rose hill Dr - Commonwealth Excavating
Budget:
Start Date: 02/27/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill Dr - Ting Internet
Description: Delivering service to CVille Wellness Center
Location: Rivanna Dr to Preston Ave
Budget:
Start Date: 03/25/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill Dr at Rugby Ave - Intersection
Description: This is for intermittent closures in the area for utility test holes.
Location: Rose Hill Dr and Rugby Ave - Draper Aden
Budget:
Start Date: 08/28/20
Project Manager: Tyler Layman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill Dr x Amherst St
Description: Sidewalk creation.
Location:
Budget:
Start Date: 09/13/23
Project Manager: City Of Charlottesville
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill Drive
Description:
Location: 633 Rose Hill Dr.
Budget:
Start Date: 08/01/22
Project Manager: Tony Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill Drive
Description:
Location: 633 Rose Hill Dr.
Budget:
Start Date: 08/01/22
Project Manager: Tony Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill Drive
Description: Directional drilling under the roadway. An area of the roadway will be opened to expose the sewer and water line for the drilling operation.
Location: 1117 Rose Hill Dr
Budget:
Start Date: 04/30/19
Project Manager: Daniel Beam
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rose Hill Drive
Description: New water meter for city. Interior lane closure
Location:
Budget:
Start Date: 09/25/18
Project Manager: Brian Estes - Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rothery Rd at Ivy Rd
Description:
Location: South side of Ivy Rd at Rothery Rd - Linco
Budget:
Start Date: 06/29/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rothery Rd at Ivy Rd
Description:
Location:
Budget:
Start Date: 09/17/21
Project Manager: Zachary Herman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rothery Rd.
Description: Rothery Rd. will be closed to thru traffic during tree removal.
Location: Near 120 Rothery Rd.
Budget:
Start Date: 04/25/19
Project Manager: Michael Neal
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rougemont Ave
Description: Installment of new water main for the City
Location:
Budget:
Start Date: 03/11/19
Project Manager:
Status: Archived Closure
Comments: Detour through Palatine Ave

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rougemont Ave
Description: Installation of a sidewalk where there is currently no sidewalk.
Location: Rougemont Ave - Linco
Budget:
Start Date: 10/12/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rougemont Ave
Description:
Location:
Budget:
Start Date: 11/10/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Route 250
Description: Closure for top of deck evaluation. VDOT SGR Project
Location:
Budget:
Start Date: 08/27/18
Project Manager: Tom Vogt - Senior Structural Engineer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Route 250 Bypass
Description: Lane closures for top of deck evaluation. VDOT SGR project
Location:
Budget:
Start Date: 08/27/18
Project Manager: Tom Vogt - Senior Structural Engineer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Route 250 Bypass
Description: Bridge inspection, flagging operation
Location: Sequential static right lane closures EBL/WBL
Budget:
Start Date: 10/20/18
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: RT 250
Description:
Location: Rt 250 at McIntire Park
Budget:
Start Date: 02/04/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: RT 250
Description: Bridge inspection.
Location: RT 250 below Dairy Rd Bridge for inspections.
Budget:
Start Date: 09/24/19
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: RT 250
Description: Bridge inspection.
Location: RT 250 below Dairy Rd Bridge for inspections.
Budget:
Start Date: 09/24/19
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: RT 250
Description:
Location: Below Dairy Rd Bridge
Budget:
Start Date: 09/16/20
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rt 250
Description:
Location: Rt 250 under the Locust Ave Bridge - Mid-Atlantic Engineering
Budget:
Start Date: 05/28/20
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: RT 250
Description:
Location:
Budget:
Start Date: 09/21/21
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: RT 250
Description: Night work. Mobile operations to inspect sewer system.
Location: Between Locust Ave and River Rd - TriState
Budget:
Start Date: 10/25/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rt 250 near Hydraulic Rd
Description: Storm sewer work. Inside lanes will be closed during the project from 8pm to 6am.
Location: Rt 250 near Hydraulic Rd
Budget:
Start Date: 08/12/19
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave
Description: Shoulder closure/lane shift below structure for bridge inspection.
Location: Rugby Rd below RT 250 Bypass
Budget:
Start Date: 08/22/19
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave
Description: Shoulder closure, lane shift. Bridge Inspection - VDOT SGR Project
Location: under bridge
Budget:
Start Date: 08/24/18
Project Manager: Tom Vogt - Senior Structural Engineer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave
Description: Close lane/create ped access to park
Location: Rugby Ave to MyIntire Park
Budget:
Start Date: 04/05/18
Project Manager: Coler Eller - Prjoect Manager
Status: Archived Closure
Comments: Close lane/create ped access during construction

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave
Description:
Location: At Stonefield Ln - Linco
Budget:
Start Date: 10/11/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave
Description:
Location: NB under RT 250 Bridge - Kokosing
Budget:
Start Date: 01/25/21
Project Manager: Brandon Herbert
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave
Description:
Location: Between Culbreth Rd and University Ave - Shentel
Budget:
Start Date: 04/28/20
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave
Description:
Location: Under RT 250 Overpass - Mid-Atlantic
Budget:
Start Date: 08/27/20
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave - Ting Internet
Description: Fiber Installation
Location:
Budget:
Start Date: 04/12/24
Project Manager:
Status: Completed Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave x Rose Hill Dr - Linco
Description: City of Charlottesville Intersection Reconstruction.
Location: NE sidewalk corner of Rugby Ave x Rose Hill Dr
Budget:
Start Date: 09/12/23
Project Manager: City of Charlottesville
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave x Rose Hill Dr - Linco
Description: City of Charlottesville Intersection Reconstruction.
Location: NE sidewalk corner of Rugby Ave x Rose Hill Dr
Budget:
Start Date: 09/12/23
Project Manager: City of Charlottesville
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Ave x Rose Hill Dr - Linco
Description: City of Charlottesville Intersection Reconstruction.
Location: NE sidewalk corner of Rugby Ave x Rose Hill Dr
Budget:
Start Date: 09/12/23
Project Manager: City of Charlottesville
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Cir
Description: Installation of sidewalk where there is not existing sidewalk.
Location: Rugby Cir - Linco
Budget:
Start Date: 10/19/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd
Description: Tree work and sidewalk repair work at Westminster Church.
Location: 400 Rugby Rd - Westminster Church
Budget:
Start Date: 10/13/20
Project Manager: Sandy Wilcox
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd
Description: Installing new water meter.
Location: 165 Rugby Rd - Linco
Budget:
Start Date: 10/12/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd
Description:
Location: 400 Rugby Rd - Digs
Budget:
Start Date: 12/22/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd
Description:
Location: Rugby Rd below the RT 250 bridge - Mid Atlantic
Budget:
Start Date: 08/25/21
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd
Description:
Location: 503 Rugby Rd - Rocktown Excavating
Budget:
Start Date: 08/24/21
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd
Description:
Location:
Budget:
Start Date: 08/09/21
Project Manager: Jordan Lehman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd
Description: 10/20 through 10/29 Monday - Friday Only 7 am to 5 pm Northbound traffic on Rugby Rd will be detoured to Barracks Rd to use Rt 250 to access Dairy Rd and the northern portion of Rugby Rd from the intersection of Rugby Rd at Barracks Rd.
Location: Intersection of Rugby Rd and Barracks Rd - Linco
Budget:
Start Date: 10/20/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd
Description:
Location: Rugby Rd at Barracks Rd - Linco
Budget:
Start Date: 11/20/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd
Description:
Location: Rugby Rd at University Ave - Shentel
Budget:
Start Date: 04/06/20
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd - Diggs
Description:
Location: 517 Rugby Road
Budget:
Start Date: 02/08/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd - Digs
Description:
Location: 517 Rugby Road
Budget:
Start Date: 02/06/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd - Ting Internet
Description: Fiber Installation
Location:
Budget:
Start Date: 04/10/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd, Gordon Ave, 14th St NW, Wertland St, 13th St NW
Description:
Location: Between University Ave and 13th NW
Budget:
Start Date: 12/09/19
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd.
Description: This is a street (shoulder) and sidewalk closure not in excess of 48 hours.
Location: Between Universtiy Way and Lamberth Lane
Budget:
Start Date: 11/14/19
Project Manager: Carl Pilat
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd.
Description: This is a street (shoulder) and sidewalk closure not in excess of 48 hours.
Location: Between Universtiy Way and Lamberth Lane
Budget:
Start Date: 11/14/19
Project Manager: Carl Pilat
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Rd.
Description: Closure dates: 1/28 - 1/30 AND 2/3 - 2/4
Location: Between University Ave and Chancellor St - Shentel
Budget:
Start Date: 01/28/20
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Road
Description: Tree pruning infront of 1306 Rugby. Flagging operation
Location: 1306
Budget:
Start Date: 04/22/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rugby Road - Handley E&D
Description:
Location: 905 Rugby Road
Budget:
Start Date: 05/02/23
Project Manager: David Stavitski
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Rutledge
Description: POD
Location: 1500 Rutledge
Budget:
Start Date: 06/26/19
Project Manager: Jonathan Lewis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: S St W
Description: Tree work.
Location: 100 S St W - Bog "O" Tree
Budget:
Start Date: 02/26/20
Project Manager: John Jeffers
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: S. 1st St
Description: 1 parking space closure
Location:
Budget:
Start Date: 08/05/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: September 5-14,18-19,21-22,25-29

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: S. 1st Street
Description: The Southern Event Parking Closures
Location:
Budget:
Start Date: 10/04/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: October 4-7,9-14,19-20,24,26-27,29,31

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sadler St
Description: Tree trimming for Dominion.
Location:
Budget:
Start Date: 12/10/20
Project Manager: Robert Horsley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sadler St
Description: Flagging for paving operation.
Location:
Budget:
Start Date: 09/10/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Seminole Tr
Description:
Location: 1149 Seminole Tr - Century Link
Budget:
Start Date: 11/16/21
Project Manager: Theresa Bryant
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Shamrock Rd
Description:
Location:
Budget:
Start Date: 11/09/21
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Shamrock Rd
Description: Sewer line repair.
Location:
Budget:
Start Date: 09/24/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Shamrock Rd
Description: One lane closure for sewer relocation. Flagger operation
Location: 232 Shamrock
Budget:
Start Date: 03/27/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Shamrock Rd
Description: Emergency tree removal.
Location: Shamrock Rd between Trailridge Rd and Antoinette Ave
Budget:
Start Date: 06/26/19
Project Manager: Thomas Taylor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Shamrock Rd - Linco
Description:
Location: 715-719 Shamrock
Budget:
Start Date: 05/17/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Shamrock Rd & Antoinette Ave
Description: Installment of fiber optic internet
Location: 710 Shamrock to 1517 Antoinette Ave to 101 Antoinette Ct
Budget:
Start Date: 04/04/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Shamrock Rd.
Description: POD placement, 1 parking space closure
Location: 223 Shamrock
Budget:
Start Date: 01/29/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Shelby Drive
Description: Installation of Water Main for City
Location:
Budget:
Start Date: 08/27/18
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sheridan Ave - Linco
Description: Water Main Installation
Location:
Budget:
Start Date: 01/15/24
Project Manager: Troy Wright
Status: Active Closure
Comments: Traffic Control 23.2 where needed especially portion along North Ave.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Smith St
Description: THis is a one day closure to occur between 4/28 and 5/15 by Dominion Energy.
Location: 1208 Smith St - Dominion Energy
Budget:
Start Date: 04/28/21
Project Manager: Cathy Strayhorne
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Smith St
Description:
Location:
Budget:
Start Date: 07/05/21
Project Manager: Dylan Garthright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Smith St
Description:
Location: 1208 Smith St - Dominion Energy
Budget:
Start Date: 08/02/21
Project Manager: Dylan Garthright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St
Description:
Location: South St
Budget:
Start Date: 03/29/21
Project Manager: Christie Haskin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St
Description: Sidewalk closure not in excess of 48 hours.
Location: 250 South St - Real Property
Budget:
Start Date: 11/08/21
Project Manager: RG Kitchen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St
Description:
Location:
Budget:
Start Date: 11/22/21
Project Manager: RG Kitchen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St
Description: Sidewalk repairs.
Location: South St
Budget:
Start Date: 09/25/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St
Description:
Location: 2nd St SW to 2nd St SE
Budget:
Start Date: 11/21/19
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St E
Description: Dates of closure: 11/26, 12/7, 12/14, and 12/24.
Location: South St E - Donleys Concrete
Budget:
Start Date: 11/26/19
Project Manager: Joshua Morris
Status: Archived Closure
Comments: Parking spot closure only.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St E
Description:
Location: From 2nd St SW to 2nd St SE - SL Williamson
Budget:
Start Date: 06/26/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St E & E Water St - Schnabel
Description: Soil Boring
Location:
Budget:
Start Date: 10/11/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St E & E Water St - Schnabel
Description: Soil Boring
Location:
Budget:
Start Date: 10/11/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St SW
Description: Dumpster
Location: 100 block - Woodard Properties
Budget:
Start Date: 12/16/19
Project Manager: Chris Virgillio
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St W
Description:
Location: 200 South St W
Budget:
Start Date: 03/11/20
Project Manager: John Jeffer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: South St W
Description: Red Cross Drive
Location: Ridghe at South St W
Budget:
Start Date: 05/29/19
Project Manager: Terry Atwater
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Southern
Description: The Southern Event Parking Closures
Location:
Budget:
Start Date: 11/01/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: November 1-3,7-11,13-18,20-21,23-24,27,29-30

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Southern
Description: The Southern Event Parking Closures
Location:
Budget:
Start Date: 11/01/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: November 1-3,7-11,13-18,20-21,23-24,27,29-30

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Spottswood Rd
Description: Gas service install. Closed to thru traffic.
Location: 2010 Spottswood Rd - City Gas
Budget:
Start Date: 10/13/21
Project Manager: Kenneth Varner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sprigg Lane
Description: Single lane traffic controlled by flagging operation. Parking lane on both sides closed. Installation of 8" waterline down and service connections on Sprigg Lane
Location:
Budget:
Start Date: 12/01/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sprigg Lane
Description: Dumpsters, Equipment, Construction for IRC renovation
Location:
Budget:
Start Date: 07/25/18
Project Manager: Bobby Grubbs
Status: Archived Closure
Comments: 7 parking closures

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sprigg Ln
Description:
Location: Sprigg Ln from Emmett St - Commonwealth Excavating
Budget:
Start Date: 04/07/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sprigg Ln
Description:
Location: Sprigg Ln - Commonwealth Exc
Budget:
Start Date: 04/29/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sprigg Ln - Tri-State
Description: Manhole Rehab
Location:
Budget:
Start Date: 10/04/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sprigg Ln - Tri-State
Description: Manhole Rehab
Location:
Budget:
Start Date: 10/04/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sprigg Ln - Tri-State
Description: Manhole Rehab
Location:
Budget:
Start Date: 10/04/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sprigg Ln - Tri-State
Description: Manhole rehab. Vacuum test.
Location:
Budget:
Start Date: 10/25/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Spruce St
Description:
Location: Between Myrtle St and Cherry St - Linco
Budget:
Start Date: 03/23/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: St Annes
Description:
Location: St Annes Rd - Commonwealth Excavating
Budget:
Start Date: 02/03/20
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: St Charles Ave
Description:
Location:
Budget:
Start Date: 12/07/20
Project Manager: Ethan Hensley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: St Clair Ave
Description: Milling and paving.
Location: Near Belleview Ave - SL Williamson
Budget:
Start Date: 11/04/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: St Clair Ave
Description:
Location: Between Belleview Ave and Otter St - TriState Utilities
Budget:
Start Date: 03/19/20
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: St Clair Ave
Description: St Clair Ave will be closed from Long St to Hazel St to thru traffic. The actual closure will be directly in front of 811 St Clair Ave.
Location: 811 St Clair Ave - Digs, Inc
Budget:
Start Date: 04/14/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: St Clair Ave
Description: Installing water meters for the city. Road closed to thru traffic. Detour will be in place utilizing Hazel St and Poplar St.
Location: St Clair Ave between Hazel St and Poplar closed to thru traffic.
Budget:
Start Date: 07/22/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: St Clair Avenue
Description: Sewerline repair, street closure with flaggers
Location: 705 St Clair Ave
Budget:
Start Date: 11/14/18
Project Manager: Durwin Corbin - Supervisor
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: St George Ave
Description: Tree removal.
Location: 1207 St George Ave
Budget:
Start Date: 08/06/19
Project Manager: John Jeffers
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: St James Cir
Description: Sidewalk improvements.
Location: St James Cir
Budget:
Start Date: 07/11/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: St. Clair - Digs
Description:
Location: 837 St. Clair Ave
Budget:
Start Date: 05/28/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Stadium Rd
Description: Sinkhole investigation.
Location:
Budget:
Start Date: 08/11/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Stadium Rd
Description: Overgrown vegetation obstructing the sidewalk. PW/PS placed barricades and a detour at the site.
Location: 2010 Stadium Rd - City of Charlottesville
Budget:
Start Date: 07/22/21
Project Manager: James Frazier
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Stadium Rd - UVA Cycling
Description: Bike Race
Location: Stadium Rd between Shamrock Rd & Whitehead Rd
Budget:
Start Date: 04/21/24
Project Manager:
Status: Future Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Stonefield Ln
Description:
Location: Between Mason Ln and Rugby Rd - Linco
Budget:
Start Date: 09/27/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Stonehenge Dr
Description: POD
Location: Stonehenge Dr - POD
Budget:
Start Date: 09/09/20
Project Manager: POD
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Stribling Ave
Description:
Location: 256 Stribling Ave - Faulconer
Budget:
Start Date: 02/12/20
Project Manager: Andrew Cox
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Stribling Ave
Description: Install new mid span pole to improve clearances
Location: Shoulder of road
Budget:
Start Date: 10/15/18
Project Manager: Carl Pilat
Status: Archived Closure
Comments: One day of work

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sunrise Park Ln
Description:
Location: Between Carl Smith St and Rives St
Budget:
Start Date: 04/15/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sunrise Park Ln
Description:
Location: Between Carl Smith St and Nassau St - Digs, Inc
Budget:
Start Date: 06/30/21
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sunrise Park Ln
Description:
Location: Sunrise Park Ln - Marion
Budget:
Start Date: 02/23/21
Project Manager: David Michaelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Swanson Drive
Description: Water Main Installation for City
Location:
Budget:
Start Date: 08/27/18
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Sycamore St
Description:
Location: 1200 Sycamore St - SBH
Budget:
Start Date: 10/29/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Tarleton Drive - SL Williamson
Description:
Location:
Budget:
Start Date: 06/04/21
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Test
Description: Test
Location: Test
Budget:
Start Date: 10/31/22
Project Manager: Test
Status: Archived Closure
Comments: Test

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Thomas Dr
Description:
Location: Shamrock Rd to cul-de-sac - Handley Excavating
Budget:
Start Date: 08/30/21
Project Manager: Taylor Easter
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Thomas Drive - Handley
Description:
Location:
Budget:
Start Date: 02/07/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Thomas Drive - Linco
Description:
Location: Thomas Drive
Budget:
Start Date: 03/03/23
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Todd Ave
Description:
Location:
Budget:
Start Date: 11/12/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Trailridge Rd
Description: Replacing storm drain drop inlet (DI)
Location: Trailridge Rd from Shamrock to Shamrock
Budget:
Start Date: 02/14/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Trailridge Rd
Description:
Location: Trailridge Rd - Monarch Concrete
Budget:
Start Date: 03/23/20
Project Manager: Vanessa Altman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Troost Ct
Description:
Location: Troost Ct - Linco
Budget:
Start Date: 05/03/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Tufton Ave (1115 Monticello Rd) - Van Yahres Tree
Description: Tree Removal
Location:
Budget:
Start Date: 01/19/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Tufton Avenue - Parks and Rec
Description:
Location:
Budget:
Start Date: 04/05/23
Project Manager: Steven Gaines
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Rehab work on Starbucks
Location: Univeristy Ave at Starbucks - Piece Management
Budget:
Start Date: 12/16/20
Project Manager: John Davis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Parking spot closures for seating on Friday, Saturday, and Sunday only.
Location: 1500 University Ave
Budget:
Start Date: 11/06/20
Project Manager: The Virginian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description:
Location: Between Culbreth Rd and Newcomb Rd N - Faulconer
Budget:
Start Date: 04/20/20
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description:
Location: Between Culbreth Rd and Newcomb Rd - Faulconer
Budget:
Start Date: 03/16/20
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: This is a sidewalk closure not in excess of 48 hours.
Location: McCormick Rd to Newcomb Rd - Faulconer
Budget:
Start Date: 04/02/20
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description:
Location: Between Chancellor St and Elliewood Ave
Budget:
Start Date: 04/06/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description:
Location: Between Rugby Rd and Culbreth Rd - Shentel
Budget:
Start Date: 04/06/20
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description:
Location: Between Culbreth Rd and Newcomb Rd - Faulconer
Budget:
Start Date: 02/18/20
Project Manager: Bryan Rieckman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description:
Location: Between Elliewood Ave and Chancellor St
Budget:
Start Date: 03/09/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Bloomberg campaign truck.
Location: In front of Bodo's
Budget:
Start Date: 02/29/20
Project Manager: Royal Yates
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description:
Location: University Ave - Skanska
Budget:
Start Date: 02/18/20
Project Manager: Shane Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description:
Location: Between Chancellor St and Hospital Dr - Linco
Budget:
Start Date: 01/06/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Pole replacement. Flagging operation and sidewalk closure not in excess of 48 hours.
Location: Between Culbreth Rd and Newcomb Rd
Budget:
Start Date: 11/13/19
Project Manager: Carl Pilat
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Work inside of a manhole in the sidewalk.
Location: Sidewalk on the corner of Chancellor St and University Ave
Budget:
Start Date: 07/23/19
Project Manager: Theresa Bryant
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Installing water main.
Location: University Ave
Budget:
Start Date: 08/20/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Sidewalk repair.
Location: University Ave between Madison Ln and Chancellor St
Budget:
Start Date: 08/21/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Parking spot.
Location: 1619 University Ave
Budget:
Start Date: 09/20/19
Project Manager: Tyler Hinkle
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Parking space closures for UVA graduation ceremony.
Location: University Ave Parking Spaces
Budget:
Start Date: 05/18/19
Project Manager: Sara Sumner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Flagging operation for water main installation.
Location: University Ave
Budget:
Start Date: 06/12/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave
Description: Closure of parking spaces for (PARK)ing Day 2018
Location:
Budget:
Start Date: 09/21/18
Project Manager: Thomas Morley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave - Faulconer
Description:
Location:
Budget:
Start Date: 04/18/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave - Lumos
Description:
Location: University between Newcomb and Rugby
Budget:
Start Date: 01/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Ave, Rugby Ave, and Gordon Ave
Description: This is a lane closure operation which will occur intermittently during this week and each closure is scheduled to last less than 5 hours. The sidewalk closures will be less than 5 hours.
Location:
Budget:
Start Date: 06/01/20
Project Manager: Chris Strosnider
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Cir
Description:
Location: University Cir - Linco
Budget:
Start Date: 10/14/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Circle
Description:
Location: University Circle - Linco
Budget:
Start Date: 06/08/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Circle
Description:
Location: Rugby Rd at University Cir
Budget:
Start Date: 02/25/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Circle
Description: Allowing two way traffic
Location: University Way to 1824 University Cir
Budget:
Start Date: 07/17/18
Project Manager: Tyler Gifford - Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Circle
Description: POD
Location: 30 Block University Circle
Budget:
Start Date: 06/13/19
Project Manager: Gregory Thompson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Way
Description: Asphalt/sidewalk restoration associated with Jack Jouett project.
Location: 64 University Way
Budget:
Start Date: 08/07/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Way - Momentum Earthworks
Description: Sidewalk/Street resurfacing project.
Location:
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: University Way - Momentum Earthworks
Description: Sidewalk/Street resurfacing project.
Location:
Budget:
Start Date: 08/03/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: US 250
Description: Installation of 2 spans of aerial fiber optic cable along existing Dominion VA Power Distribution poles
Location:
Budget:
Start Date: 08/14/18
Project Manager: Shad Conrad - Sr. Network Engineer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: UVA Facilities - University Ave
Description:
Location:
Budget:
Start Date: 07/15/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Valley Road
Description: Story Drain Replacement M-F only
Location: 528 Valley Road
Budget:
Start Date: 05/10/21
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Valley View Cir
Description:
Location: 800 block of Valley View Cir - POD
Budget:
Start Date: 06/18/20
Project Manager: Terhi Hawkins
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Valley View Circle
Description:
Location: Valley View Circle at Hazel St.
Budget:
Start Date: 07/10/19
Project Manager: Renee Roberts
Status: Archived Closure
Comments: Sidewalk repairs.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Village Ct
Description: POD
Location: Village Ct - 100 block
Budget:
Start Date: 08/24/19
Project Manager: James Trone
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Village Road
Description: parking closure for moving truck
Location:
Budget:
Start Date: 10/01/18
Project Manager: Melissa Dunn
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description: New water meter for city
Location:
Budget:
Start Date: 08/29/18
Project Manager: Brian Estes -Project Manager
Status: Archived Closure
Comments: Work on right shoulder

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description:
Location: 1533 Virginia Ave - Harman Construction
Budget:
Start Date: 10/12/20
Project Manager: Gary McBride
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description: A road closure along VA Ave from 15th St NW to 17th St NW.
Location: 1533 Virginia Ave - Harman Construction
Budget:
Start Date: 11/30/20
Project Manager: Gary McBride
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description: Street closure with a detour.
Location: 1532 & 1534 Virginia Ave - Harman
Budget:
Start Date: 04/16/21
Project Manager: Gary McBride
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description:
Location: 1532 Virginia Ave - Harman
Budget:
Start Date: 04/30/21
Project Manager: Gary McBride
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description:
Location: VA Ave - Harman
Budget:
Start Date: 03/01/21
Project Manager: Gary McBride
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description: Emergency sewer repair. Residents in hotel.
Location: Virginia Ave - Scotts Backhoe
Budget:
Start Date: 02/24/21
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description: Monday through Firday only.
Location: VA Ave - Harman
Budget:
Start Date: 01/25/21
Project Manager: Gary McBride
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description:
Location: Virginia Ave - Harman
Budget:
Start Date: 01/04/21
Project Manager: Gary McBride
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description: The street will be closed to thru traffic on weekdays only.
Location: Between 17th St NW and 15th St NW - Harman Construction
Budget:
Start Date: 07/19/21
Project Manager: Gary McBride
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Virginia Ave
Description:
Location: 1532 Virginia Ave
Budget:
Start Date: 01/10/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 854 W Main St - Lumos
Budget:
Start Date: 11/10/21
Project Manager: Dean Scheidt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: Clark Park - UVA
Budget:
Start Date: 07/13/21
Project Manager: Sariota Herman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: From W Water St to Pedestrian Mall between CODE and Omni - Hourigan
Budget:
Start Date: 08/16/21
Project Manager: Matt Donaldson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 250 W Main St - Real Property
Budget:
Start Date: 10/18/21
Project Manager: RG Kitchen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 109 W Main St - Miller's
Budget:
Start Date: 01/03/21
Project Manager: Mike London
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 600 W Main St - Faulconer
Budget:
Start Date: 11/16/20
Project Manager: Brian Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Police flagging intersection for aerial work.
Location: 1106 W Main St at 11th St SW - Lumos
Budget:
Start Date: 11/30/20
Project Manager: Jared Morris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 100 Block of W Main St - Waco
Budget:
Start Date: 10/19/20
Project Manager: Jon Coon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Milling and paving operation.
Location: W Main St and Roosevelt Brown - SL Williamson
Budget:
Start Date: 10/14/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Crane operation.
Location: 600 W Main St - B&B Electric
Budget:
Start Date: 09/21/20
Project Manager: James Ott
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Lift operation for building repairs
Location:
Budget:
Start Date: 09/28/20
Project Manager: George Pfeiefer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 310 W Main St - Linco
Budget:
Start Date: 09/09/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: Between 11th St SW and Roosevelt Brown Blvd - Waco
Budget:
Start Date: 08/17/20
Project Manager: Jon Coon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: This is a street and sidewalk closure not in excess of 48 hours.
Location: 1204 W Main St - Dodson Glass
Budget:
Start Date: 08/18/20
Project Manager: Fontaine Halsey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 1018 W Main St - UVA
Budget:
Start Date: 06/01/20
Project Manager: Cameron Ratliff
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: Between 12 1/2 St NW and 13th St NW - Spectrum Paint
Budget:
Start Date: 04/27/20
Project Manager: Bill Kennedy
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: In front of Hamilton's at First St - Comfort Source
Budget:
Start Date: 04/29/20
Project Manager: Shannon Gibson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 425 W Main St - Martin Horn
Budget:
Start Date: 05/06/20
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: East and West side of Roosevelt Brown Blvd. - Linco
Budget:
Start Date: 05/18/20
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 109 W Main St - Miller's
Budget:
Start Date: 07/07/20
Project Manager: Michael London
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: This closure is not in excess of 48 hours.
Location: Between 13th St NW and 14th St NW - MVT
Budget:
Start Date: 07/16/20
Project Manager: Trevor Keller
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: Eastbound lane of W Main St at Ridge St - Linco
Budget:
Start Date: 07/29/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 617 W Main St - Digs, Inc
Budget:
Start Date: 07/17/20
Project Manager: Gretchen Wood
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Dominion is replacing the current pole with a taller one to accommodate a Verizon antenna.
Location: across from 1325 W Main St
Budget:
Start Date: 06/17/19
Project Manager: Carl Pilat
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Flagging operation.
Location: 510 -600 W Main St
Budget:
Start Date: 09/03/19
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Event
Location: 100 block of W Main St
Budget:
Start Date: 09/05/19
Project Manager: Shelby Edwards
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 510 - 600 W Main St
Budget:
Start Date: 09/09/19
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 600 W Main St
Budget:
Start Date: 07/23/19
Project Manager: Bob Baer
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main ST
Description:
Location: 600 W Main St
Budget:
Start Date: 10/28/19
Project Manager: Mark Richardson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Emergency sidewalk closure not in excess of 48 hours.
Location: W Main St and 4th St NW
Budget:
Start Date: 10/30/19
Project Manager: Curtis
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: This project is for the installation of a utility pole.
Location: 14th St NW and Jefferson Park Ave - Elliot
Budget:
Start Date: 12/17/19
Project Manager: Carl Pilat
Status: Archived Closure
Comments: This was not previously approved or rescheduled for this day. I found out because Mike Harlow with PW called me to ask me if they could shut down another intersection.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Moving.
Location: W Main St - Parking - Martin Horn
Budget:
Start Date: 02/22/20
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: This sidewalk will not be closed over the weekend.
Location: 425 W Main St - Martin Horn
Budget:
Start Date: 12/19/19
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Sidewalk repairs.
Location: W Main St - Quirk Hotel - Momentum Earthworks
Budget:
Start Date: 03/04/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: Market St Garage Elevator - PhotoWorksGroup
Budget:
Start Date: 03/02/20
Project Manager: Naomi Cobb
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main ST
Description: This is an emergency sidewalk closure at the pedestrian mall for a local restaurant. The closure will not exceed 48 hours.
Location: 2nd St SW/W Main St - Kama Restaurant
Budget:
Start Date: 01/27/20
Project Manager: Steve Dowd
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 425 W Main St
Budget:
Start Date: 01/28/20
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description: Installation of water main.
Location: W Main St at 10th St NW - Linco
Budget:
Start Date: 03/30/20
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St
Description:
Location: 501 W Main St
Budget:
Start Date: 03/09/20
Project Manager: Shawn Woody
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main St - Blue Moon
Description: Building construction and pedestrian detour.
Location: 510 -600 W Main St
Budget:
Start Date: 10/31/18
Project Manager: LJ Lopez
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W main St - Monarch
Description:
Location:
Budget:
Start Date: 04/11/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Main Street - Monarch
Description:
Location: 300 Main Street
Budget:
Start Date: 05/04/23
Project Manager: Michael Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W South St
Description:
Location: 226 W South St
Budget:
Start Date: 06/27/19
Project Manager: Mary Velez
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W South St
Description: Moving van.
Location: 214 W South St
Budget:
Start Date: 09/07/19
Project Manager: Lynn Mohr
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description: Moving truck
Location: 100 Block of W Water St
Budget:
Start Date: 06/09/19
Project Manager: Zachary Engelmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description: Moving
Location: 107 W Water St
Budget:
Start Date: 06/14/19
Project Manager: Meredith Bearden
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description: W Water St from 1st St SW to the W Main St pedestrian mall entrance will be closed to vehicles. Westbound vehicles will be detoured at 2nd St SE to Monticello Ave. Eastbound vehicles will be detoured to Monticello Ave and 2nd St NE to access W Water St. Waterhouse parking garage will remain open. CAT will detour the bus stop on W Water St near W Main St (Contact CAT at 434-970-3649 for further details).
Location: Adjacent to 219 W Water St
Budget:
Start Date: 07/15/19
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description: Crane.
Location: West of 2nd St SW
Budget:
Start Date: 07/14/19
Project Manager: Joe Riley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description:
Location: Between 2nd St SW and Ridge McIntire Rd
Budget:
Start Date: 12/20/19
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description: Moving Truck
Location: 100 Block of W Water St
Budget:
Start Date: 05/25/19
Project Manager: Walid El-Nahal
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description: Parking spot closure
Location: Live Arts Building W Water St
Budget:
Start Date: 05/20/19
Project Manager: Lou Haney
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description: 2 Parking Spot Closures
Location: 214 W Water St
Budget:
Start Date: 06/14/19
Project Manager: EJ Radford
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description: Street closure to affect WB travel lane for waterline tie ins. Flaggers will be on site to direct traffic.
Location: W Water St between Ridge St and 2nd St
Budget:
Start Date: 05/05/19
Project Manager: Andrew Cox
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description:
Location: CODE Bldg - Faulconer
Budget:
Start Date: 10/20/21
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description: Parking spot closure thru 12/31/2021.
Location: 200 W Water St - Dumpster
Budget:
Start Date:
Project Manager: Brent Richbourg
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description: One lane of Water Street will closed for concrete work at the CODE building between 2nd St SW and Ridge McIntire Rd. Traffic will not be allowed to travel east bound (toward Downtown) on this portion of Water St W.
Location: Between 2nd St SW and W Main St near Ridge St - Donley's
Budget:
Start Date: 07/28/20
Project Manager: Joshua Morris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description:
Location: W Water St - Parking Spot
Budget:
Start Date: 09/08/20
Project Manager: Mibus
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description:
Location: From 2nd St SW to W Main St - Hourigan
Budget:
Start Date: 01/06/21
Project Manager: Chris Lomaka
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description:
Location: Between Ridge McIntire and 2nd St SW - City
Budget:
Start Date: 02/08/21
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description:
Location: 200 W Water St - Moving Truck
Budget:
Start Date: 03/22/21
Project Manager: Mary Aungier
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St
Description:
Location: 219 W Water St - CODE - FCC
Budget:
Start Date: 08/22/21
Project Manager: Robin Moriarty
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St - Hourigan
Description:
Location: Water Street Between 5th Street and 2nd St
Budget:
Start Date: 05/17/21
Project Manager: Emily Lucas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St - Tri-State
Description: Storm Pipe replacement
Location: W Water St in between Main St & 2nd St SW
Budget:
Start Date: 02/20/24
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St 200 Block
Description: Paving and patching operations.
Location: Adjacent to 219 W Water St
Budget:
Start Date: 04/22/19
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water St at W Main St Ped Mall
Description:
Location: Pedestrian Mall Sidewalk - Hourigan
Budget:
Start Date: 09/07/21
Project Manager: Matt Donaldson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W Water Street - Tri-State Utilities
Description:
Location: 218 W Water Street
Budget:
Start Date: 04/06/23
Project Manager: Damon Dudley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Main
Description: Repaving in front of the standard
Location:
Budget:
Start Date: 11/20/18
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Main St
Description: Sanitary Sewer Utility Connection. 2 phase work
Location:
Budget:
Start Date: 10/08/18
Project Manager: Bryan Rieckmann
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Main St
Description: Sanitary Sewer Utility Connection.
Location: 510-600 W. Main
Budget:
Start Date: 08/27/18
Project Manager: Daniel Sheeran
Status: Archived Closure
Comments: Parking Closure: 8/27 - 9/28 Sidewalk and Street Closure: 8/27-10/1

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Main Street
Description: Sanitary Sewer Utility connection
Location:
Budget:
Start Date: 07/15/18
Project Manager: Daniel Sheeran
Status: Archived Closure
Comments: Work to be done at night in two phases extended to august 5-8

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Main Street
Description: Sidewalk and bike lane for construction
Location: 843-901 W. Main Street
Budget:
Start Date: 05/01/18
Project Manager: Walter Marley
Status: Archived Closure
Comments: Bike lane and sidewalk for construction - Sidewalk and Bike Lane Extended through August 12 West bound lane closure: August 6-8

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Market St
Description: 3 parking space closure for event set up
Location: 206
Budget:
Start Date: 02/02/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water
Description: storm CIPP rehab for city
Location:
Budget:
Start Date: 08/07/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water St
Description: loading zone closure - 2 spaces
Location:
Budget:
Start Date: 07/06/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: July 6-7 , 10-14, 17-21, 25-28, 31, August 1

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water ST
Description: Storm CIPP rehab for city
Location:
Budget:
Start Date: 08/06/18
Project Manager: Jonathan Thomas - Project Manager
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water St
Description: Sanitary and storm CIPP rehab for city
Location: 200 block
Budget:
Start Date: 07/31/18
Project Manager: Jonthan Thomas
Status: Archived Closure
Comments: July 31, 9pm to 6am August 1, 9pm to 6am

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water St
Description: Sanitary and Sewer CIPP rehab for city
Location: 100 block
Budget:
Start Date: 08/02/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water St
Description: 2 Parking Spot Closure
Location:
Budget:
Start Date: 08/01/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: August 1,3,9,11,13-18,23-24,30-31

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water St
Description: 2 parking closures
Location:
Budget:
Start Date: 08/05/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: September 5-14,18-19,21-22,25-29

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water St
Description: Parking space closure for box truck
Location:
Budget:
Start Date: 09/24/18
Project Manager: Jack Edwards
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water ST
Description: 2 parking space closures for moving truck
Location:
Budget:
Start Date: 11/16/18
Project Manager: Sanjay Krifalani
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water St
Description: The Southern April event parking
Location: 100 block W. Water
Budget:
Start Date: 04/04/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water St
Description: The Southern April event parking
Location: 100 block W. Water
Budget:
Start Date: 04/04/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water St
Description: The Southern April event parking
Location: 100 block W. Water
Budget:
Start Date: 04/04/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water Street
Description: New hydrant installation
Location: Adjacent to 219 West Water Street
Budget:
Start Date: 03/23/19
Project Manager: Faulconer Construction Company
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water Street
Description: 1 parking space closure for moving truck
Location: 100 block
Budget:
Start Date: 12/13/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water Street
Description: 4 parking space closure for equipment access
Location: 200 block
Budget:
Start Date: 12/28/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water Street
Description: The Southern Event Parking Closures
Location:
Budget:
Start Date: 10/04/18
Project Manager: Danny Shea
Status: Archived Closure
Comments: October 4-7,9-14,19-20,24,26-27,29,31

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water Street
Description: Moving truck. 2 parking space closure
Location:
Budget:
Start Date: 08/01/18
Project Manager: William Graham
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W. Water Street
Description: Storm and sanitary CIPP rehab for city
Location:
Budget:
Start Date: 08/23/18
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W.Main Street
Description: Milling and paving lane.
Location:
Budget:
Start Date: 10/23/18
Project Manager: Cynthia Fox
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: W.Main/ Pedestrian Mall
Description: Truck parking on pedestrian mall sidewalk for grease trap cleaning
Location: pedestrian mall sidewalk infront of 200 W.Main St
Budget:
Start Date: 01/31/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ware St
Description: Monday through Friday only.
Location: Ware St at Rayon St - Linco
Budget:
Start Date: 02/01/21
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Ware Street
Description: Manhole Repair
Location: From Elliot to Robinson Place
Budget:
Start Date: 12/06/18
Project Manager: NDS
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Warren Ln
Description:
Location: To Dead End - SL Williamson
Budget:
Start Date: 08/20/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Washington Ave
Description: Water Main replacement.
Location: Washington Ave
Budget:
Start Date: 06/17/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Washington Ave
Description:
Location: Between Stadium Rd and Jefferson Park Ave - Linco
Budget:
Start Date: 03/23/20
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description:
Location: Between 2nd St and Mcintire
Budget:
Start Date: 12/20/19
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description:
Location: Water St - Faulconer
Budget:
Start Date: 11/14/19
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description: POD
Location: 100 Block of Water St
Budget:
Start Date: 08/01/19
Project Manager: Willima Proffitt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description: W Water St from 1st St SW to the W Main St pedestrian mall entrance will be closed to vehicles. Westbound vehicles will be detoured at 2nd St SE to Monticello Ave. Eastbound vehicles will be detoured to Monticello Ave and 2nd St NE to access W Water St. Waterhouse parking garage will remain open. CAT will detour the bus stop on W Water St near W Main St (Contact CAT at 434-970-3649 for further details).
Location: Adjacent to 219 Water St between 1st St SW and the W Main pedestrian mall entrance.
Budget:
Start Date: 07/16/19
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description: Moving
Location: Water St between 2nd and 1st
Budget:
Start Date: 08/18/19
Project Manager: Jennifer mowad
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description: Bridge inspection.
Location: Water St below 9th St SE (Belmont bridge)
Budget:
Start Date: 09/24/19
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description: This is a parking spot closure permit. This is to enable the construction of a multi-use path along Water St. The existing sidewalk will remain opened during construction.
Location: Water St between 10th St NE and 9th St NE
Budget:
Start Date: 01/02/20
Project Manager: Renee Roberts
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description: Sprint Pavilion Event
Location:
Budget:
Start Date: 08/25/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description: Sprint Pavilion
Location:
Budget:
Start Date: 08/25/18
Project Manager: Broocks Meade
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water ST
Description: Event parking
Location:
Budget:
Start Date: 10/04/18
Project Manager: Brooks Wellmon
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description:
Location: Below Belmont Bridge
Budget:
Start Date: 09/16/20
Project Manager: Tom Vogt
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description:
Location: 100 Water St W - Eaton
Budget:
Start Date: 11/17/20
Project Manager: Genette Eaton
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description:
Location: Between 2nd St SW and Ridge St - Faulconer
Budget:
Start Date: 12/04/20
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description: Paving operation.
Location: Between Belmont Bridge and 10th St NE - SL Williamson
Budget:
Start Date: 07/07/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description: Full daytime closure to facilitate gas main installation to the CODE building.
Location: Between Ridge McIntire and 2nd St SW - City
Budget:
Start Date: 12/28/20
Project Manager: Chirico Christian
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St
Description:
Location: Between 2nd St SW and Ridge St - Dominion
Budget:
Start Date: 12/08/20
Project Manager: Kelly Maxwell
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St - Belmont Bridge
Description:
Location:
Budget:
Start Date: 02/08/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St - Faulconer
Description:
Location: Water Street between McIntire and 2nd
Budget:
Start Date: 06/07/21
Project Manager: Robin Moriarty
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St at W Main St
Description:
Location: Pedestrian Mall Sidewalk at the CODE building - FCC
Budget:
Start Date: 10/11/21
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St E
Description: Storage Container
Location: 120 Water St E
Budget:
Start Date: 05/28/19
Project Manager: Joan Fenton
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St E
Description: Repair gutters.
Location: 123 Water St E - Wallenborn Construction
Budget:
Start Date: 03/09/20
Project Manager: Charles Wallenborn
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St SW
Description: Material drop off for 230 W Main Construction Site
Location: 200 Block of Water St SW
Budget:
Start Date: 02/12/19
Project Manager: Hourigan Construction Corp.
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St W
Description:
Location: 2nd St SW to Ridge St - Donley's Concrete Group
Budget:
Start Date: 04/08/20
Project Manager: Joshua Morris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St W
Description: This street closure will have an impact on eastbound traffic on Water St W from Ridge St to 2nd St SW. Traffic will be detoured to South St W. The dates for this closure are: 11/16, 11/23, 12/7, and 12/21.
Location: 2nd St to Ridge St
Budget:
Start Date: 11/23/19
Project Manager: Joshua Morris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St W
Description: Utility inspections. Mobile Flagging Operations with no full closure.
Location: 219 Water St W
Budget:
Start Date: 09/17/19
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St W
Description: Moving
Location: 109 Water St W
Budget:
Start Date: 08/09/19
Project Manager: Patrick Goggin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St W
Description: Moving truck.
Location: 107-109 Water St W
Budget:
Start Date: 07/10/19
Project Manager: Drew Jensen
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St W
Description: Moving.
Location: 107 Water St W
Budget:
Start Date: 08/05/19
Project Manager: Jeaneete Andamasaris
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St W
Description: Mobile flagging operation for short duration, 1-2 hours.
Location: 219 Water St W
Budget:
Start Date: 07/25/19
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St W
Description: Moving
Location: 109 Water St W
Budget:
Start Date: 07/22/19
Project Manager: Gleason Wilson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St W
Description:
Location: Between W Main St and 2nd St SW - Faulconer
Budget:
Start Date: 06/29/20
Project Manager: Ryan Roman
Status: Archived Closure
Comments: This closure is only approved for weekdays.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water St W
Description: Single Lane Closure with Flagging Operation
Location: Between 2nd St SW and W Main St - Faulconer
Budget:
Start Date: 10/08/20
Project Manager: Ryan Roman
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water st-belmont
Description:
Location: Sidewalk under Belmont Bridge
Budget:
Start Date: 04/29/22
Project Manager: city of charlottesville
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street
Description: Construction access and safety
Location: From 10th Street to City Walk Way
Budget:
Start Date: 06/01/18
Project Manager: Joe Simpson - Construction Manager
Status: Archived Closure
Comments: North side sidewalk and West Bound lane of Water Street - Extended til end of November

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street - Faulconer
Description:
Location: 218 W Water Street
Budget:
Start Date: 06/13/23
Project Manager: Joseph Messere
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Water Street - Uhler
Description:
Location: 550 E Water Street, North Side
Budget:
Start Date: 03/13/23
Project Manager: Richard Uhler
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Watson Ave
Description:
Location: Shoulder on Watson Ave
Budget:
Start Date: 09/05/19
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Wayside Pl
Description:
Location: Wayside Pl
Budget:
Start Date: 10/04/19
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Wayside Place
Description: Storm drain replacement for the City of Charlottesville.
Location: Wayside Place
Budget:
Start Date: 06/10/19
Project Manager: Troy Wright
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Welford St - Ting Internet
Description: Fiber Installation
Location:
Budget:
Start Date: 04/10/24
Project Manager:
Status: Active Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Welk Pl
Description:
Location: Harris St to Dead End - SL WIlliamson
Budget:
Start Date: 06/25/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Wertland St
Description: This is a street and sidewalk closure not in excess of 48 hours for Verizon unit installation on utility pole.
Location: 1206 Wertland St - MVTS
Budget:
Start Date: 10/12/20
Project Manager: Marc Ray
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Wertland St
Description: Tree trimming for Dominion.
Location:
Budget:
Start Date: 12/10/20
Project Manager: Robert Horsley
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Wertland St
Description: POD
Location: Wertland St at 13th St NW
Budget:
Start Date: 08/08/19
Project Manager: Isabelle Moore
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Wertland St
Description: Water and sewer repairs. One lane will be closed on Wertland St between 10th St NW and 12th St NW. There will be a flagging operation in place.
Location: 1010 Wertland St
Budget:
Start Date: 08/20/19
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Wertland St - Scott's
Description: Potholing gas and water. Modified TTC-34.1 with detours
Location:
Budget:
Start Date: 09/18/23
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St
Description:
Location: West St at Dairy Central - KBS
Budget:
Start Date: 12/01/21
Project Manager: Jackson Spivey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St
Description:
Location: Between 10th St NW and 9th St NW - KBS
Budget:
Start Date: 10/19/20
Project Manager: Jackson Spivey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St
Description: Road closure with a detour in place.
Location: 10th St NW to 9th St NW - Momentum
Budget:
Start Date: 11/20/19
Project Manager: Mark Wagner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St
Description: Road closure with detour.
Location: Between 9th St NW and 10th St NW - Momentum
Budget:
Start Date: 11/25/19
Project Manager: Mark Wagner
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St
Description:
Location: Between 9th St NW and 10th St NW
Budget:
Start Date: 12/16/19
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St
Description: This is a sidewalk closure not in excess of 48 hours.
Location: Between 10th St NW and 9th St NW - Momentum
Budget:
Start Date: 03/19/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St
Description:
Location: Between 10th St NW and 9th St NW - KBS
Budget:
Start Date: 04/13/20
Project Manager: Jackson Spivey
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St
Description:
Location: 10th St NW to 9th St NW - Momentum
Budget:
Start Date: 01/17/20
Project Manager: Brice Nelson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St
Description: Water service disconnection from the water main, street and sidewalk closure. Flaggers will control traffic flow.
Location: 10th St NW to 9th St NW
Budget:
Start Date: 02/12/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St - Momentum
Description:
Location: West St. East of 10th
Budget:
Start Date: 02/07/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St - Momentum
Description:
Location: West - east of 10th Street
Budget:
Start Date: 03/03/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St - RSG
Description:
Location: West St east of 10th.
Budget:
Start Date: 02/08/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West St-Momentum
Description:
Location: 946 Grady Ave
Budget:
Start Date: 04/21/22
Project Manager:
Status: Archived Closure
Comments: Closure less than 48 hours.

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West Street
Description: water meter for city. minor encroachment
Location:
Budget:
Start Date: 09/19/18
Project Manager: Brian Estes
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: West Water Street
Description: Installation of new sanitary main in Eastbound Water Street. Detour through Ridge Street, Monticello Ave and 2nd St SE.
Location: 1st St S to Downtown Mall Access Entrance
Budget:
Start Date: 01/07/19
Project Manager:
Status: Archived Closure
Comments: extension til 3/8

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Westview Rd - SL Williamson
Description:
Location:
Budget:
Start Date: 06/10/21
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Westwood
Description: Dumpster
Location: 1442 Westwood
Budget:
Start Date: 07/09/19
Project Manager: Tom Donohue
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Wilder Dr - Dominion
Description:
Location:
Budget:
Start Date: 03/31/22
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Willow Dr
Description:
Location: High St to Riverdale Dr - SL WIlliamson
Budget:
Start Date: 06/24/20
Project Manager: Larry Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Willow Drive & Riverdale Drive
Description: Installment of new water main for the City
Location:
Budget:
Start Date: 03/18/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Wine St
Description: 1 parking space closure for POD placement
Location: 228
Budget:
Start Date: 02/26/19
Project Manager:
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Winston Rd
Description:
Location: 1855 to 1849 Winston Rd - Arborculture & Landscape Design
Budget:
Start Date: 11/14/19
Project Manager: Ben Davidson
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Winston Rd, Cottage Ln, Avon St, Monticello Ave, and Preston Ave
Description:
Location: Various points along the above mentioned roads for sewer inspections.
Budget:
Start Date: 08/05/19
Project Manager: Jonathan Thomas
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Winston Terr
Description:
Location:
Budget:
Start Date: 09/10/20
Project Manager: Junior Eppard
Status: Archived Closure
Comments:

Project Type: STREET OR SIDEWALK CLOSURE
Project Name: Yorktown Dr
Description:
Location: 1814 Yorktown Dr - Scotts Backhoe
Budget:
Start Date: 05/28/20
Project Manager: Durwin Corbin
Status: Archived Closure
Comments:

Project Type: STREET RESURFACING
Project Name: Street Paving (Citywide)
Description: Street Resurfacing
Location: Citywide
Budget: Paving CIP (P-00689)
Start Date: 07/01/18
Project Manager: Martin Silman
Status: Archived CIP
Comments: Street resurfacing projects for FY18 and FY19

Project Type: STREET RESURFACING
Project Name: Street Paving (Citywide)
Description: Milling and Resurfacing of Street Pavement from Annual Paving List
Location: University Ave from Rugby Rd to Emmet St
Budget: Paving CIP (SS009), Utility Fund
Start Date:
Project Manager: Stormwater Utility Administrator
Status: Archived CIP
Comments: Paving

Project Type: STREET RESURFACING
Project Name: Street Paving (Citywide)
Description: Milling and Resurfacing of Street Pavement from Annual Paving List
Location: Carter Ln
Budget: Paving CIP (SS009), Utility Fund
Start Date:
Project Manager: Stormwater Utility Administrator
Status: Archived CIP
Comments: Paving

Project Type: STREET RESURFACING
Project Name: Street Paving (Citywide)
Description: Milling and Resurfacing of Street Pavement from Annual Paving List
Location: Ivy Road
Budget: Paving CIP (SS009), Utility Fund
Start Date:
Project Manager: Stormwater Utility Administrator
Status: Archived CIP
Comments: Paving

Project Type: STREET RESURFACING
Project Name: Street Paving (Citywide)
Description: Milling and Resurfacing of Street Pavement from Annual Paving List
Location: E Jefferson St from Meade Ave to 2nd Street NW
Budget: Paving CIP (SS009), Utility Fund
Start Date:
Project Manager: Stormwater Utility Administrator
Status: Archived CIP
Comments: Paving

Project Type: STREET RESURFACING
Project Name: Street Paving (Citywide)
Description: Milling and Resurfacing of Street Pavement from Annual Paving List
Location: Carter Ln
Budget: Paving CIP (SS009), Utility Fund
Start Date:
Project Manager: Stormwater Utility Administrator
Status: Archived CIP
Comments: Paving

Project Type: STREET RESURFACING
Project Name: Street Paving (Citywide)
Description: Milling and Resurfacing of Street Pavement from Annual Paving List
Location: 1st Street N from W High St to Downtown Mall
Budget: Paving CIP (SS009), Utility Fund
Start Date:
Project Manager: Stormwater Utility Administrator
Status: Archived CIP
Comments: Paving

Project Type: STREET RESURFACING
Project Name: Street Paving (Citywide)
Description: Milling and Resurfacing of Street Pavement from Annual Paving List
Location: 14th Street NW from Grady Ave to Main St
Budget: Paving CIP (SS009), Utility Fund
Start Date:
Project Manager: Stormwater Utility Administrator
Status: Archived CIP
Comments: Paving

Project Type: TRANSPORTATION PROJECTS
Project Name: 10th St NW at Grady Ave - Jerry
Description: Install ADA compliant curb ramps, pedestrian refuge, and crosswalk markings to improve accessibility and safety at this site.
Location: 38°02'18.9"N 78°29'29.8"W
Budget: 0
Start Date: 10/03/22
Project Manager: Jerry Allen
Status: Active CIP
Comments: VDOT will have the Appendix A Project Agreement completed by the fall and the City will draft an RFP for consulting services at that time.

Project Type: TRANSPORTATION PROJECTS
Project Name: Barracks Road and Emmet Street Intersection Improvements - Tim
Description: Improvements to all phases and functionality of the intersection to include right turn lanes to northbound Emmet and Westbound Barracks. NDS is gathering proposals for design services.
Location: Barracks Road and Emmett Street
Budget: 8641000
Start Date: 11/01/18
Project Manager: Tim Motsch
Status: Archived CIP
Comments: RW Acquisitioning.

Project Type: TRANSPORTATION PROJECTS
Project Name: Belmont Bridge Replacement - Jeanette
Description: Replacement of structurally deficient bridge with new multi-modal design
Location: Avon St between Levy Avenue and East Market St.
Budget:
Start Date: 08/01/08
Project Manager: Jeanette Janiczek
Status: Archived CIP
Comments: Railroad agreement executed. Private utility plans for relocation being finalized. Dominion Energy complete - CenturyLink underway with Ting/Segra and Comcast to follow. Invitation for Bid advertised on January 15, 2021 with a bid opening on March 16, 2021. Bids under evaluation with Notice to Award pending. Construction to begin June 2021. www.belmontbridge.org

Project Type: TRANSPORTATION PROJECTS
Project Name: Cherry Ave Intersection Improvements
Description: Intersection streetscape tie-in. Part of corridor study for 5th/Ridge St.
Location: Intersection of Cherry Ave and Ridge St.
Budget: $7,682
Start Date: 02/10/14
Project Manager: Brennen Duncan
Status: Archived CIP
Comments: In preliminary design phase. Design Team will coordinate with Traffic Engineer.

Project Type: TRANSPORTATION PROJECTS
Project Name: Cherry Ave Intersection Improvements
Description: Intersection streetscape tie-in.
Location: Intersection of Cherry Ave and Roosevelt Brown Blvd.
Budget: $7,682
Start Date: 02/10/14
Project Manager: Brennen Duncan
Status: Archived CIP
Comments: In preliminary design phase. Design Team will coordinate with Traffic Engineer.

Project Type: TRANSPORTATION PROJECTS
Project Name: Cherry Ave Intersection Improvements
Description: Intersection streetscape tie-in.
Location: Cherry Ave at Roosevelt Brown Blvd and Ridge St.
Budget: $15,365
Start Date: 02/10/14
Project Manager: Brennen Duncan
Status: Archived CIP
Comments: In preliminary design phase. Design Team will coordinate with Traffic Engineer.

Project Type: TRANSPORTATION PROJECTS
Project Name: Dairy Rd Bridge - Tony and Jerry
Description: Remove and replace the Dairy Rd vehicular bridge utilizing the design-build delivery method.
Location: 38°03'20.7"N 78°29'03.5"W
Budget: 7210664
Start Date: 07/12/21
Project Manager: Project Manager
Status: Active CIP
Comments: The RFP for Design Build consulting services is with Procurement for final review and will be advertised by mid-August.

Project Type: TRANSPORTATION PROJECTS
Project Name: Dairy Road Bridge Repair
Description: Bridge repair. Repairs to existing bridge and replacement of pedestrian walkway.
Location: Dairy Rd and 250 Bypass.
Budget: $1,200,00
Start Date:
Project Manager: Marty Silman
Status: Archived CIP
Comments: Complete.

Project Type: TRANSPORTATION PROJECTS
Project Name: E High Streetscape - Tim
Description: Streetscape project.
Location: E High St from 10th St to Locust Ave.
Budget: 7
Start Date: 12/19/17
Project Manager: Tim Motsch
Status: Archived CIP
Comments: In Preliminary Engineering phase. ROW design in progress. 60% Design review complete. City Council meeting October 21, 2019.Construction Start late 2021. Completion late 2022.

Project Type: TRANSPORTATION PROJECTS
Project Name: Elliott Ave Streetscape, Design Phase
Description: Streetscape project with ped, bike, landscape, and drainage improvements.
Location: Elliott Ave from Ridge St to Ware St.
Budget: 1,300,000
Start Date: 01/06/20
Project Manager: Tony Edwards
Status: Archived CIP
Comments: Design Plans 95% State Revenue Sharing funds can also be used for these phases. Toole Design will be providing services for RW & CN phases of the project.

Project Type: TRANSPORTATION PROJECTS
Project Name: Emmet St Streetscape - Tim
Description: In Preliminary Engineering phase. Concepts being developed. Streetscape and intersections project.
Location: Emmet St N from Ivy Rd. to Arlington Blvd.
Budget: 12100000
Start Date: 01/30/18
Project Manager: Tim Motsch
Status: Archived CIP
Comments: 60% Design review complete; Review meeting held September 19, 2019. Next UVA coordination meeting October 16, 2019. First tunnel modeling sent August 30, 2019, response received September 27, 2019 consisting of technical questions. Responses being prepared. Construction start mid 2021. Complete early 2023.

Project Type: TRANSPORTATION PROJECTS
Project Name: Fontaine Ave Streetscape
Description: Improvements include a three lane roadway design with 10-12' median, dedicated turn lanes, expanded sidewalks and ADA improvements. Design work for the project started in September 2018.
Location: City Limits to JPA Intersection
Budget: 11700000
Start Date: 07/01/18
Project Manager: Kyle Kling
Status: Archived CIP
Comments: https://fontainestreetscape.com/ 30% Design completed. Detailed engineering ongoing.

Project Type: TRANSPORTATION PROJECTS
Project Name: Hillsdale Drive Extension
Description: New roadway with multi-modal design features. Joint City / Albemarle Co project.
Location: Parallel to Route 29 between Hydraulic Rd and Greenbrier Dr.
Budget: 29669984
Start Date: 07/01/05
Project Manager: Jeanette Janiczek
Status: Archived CIP
Comments: Roadway/bridge/shared use path/sidewalks opened to the public on December 22, 2018. 1 year warranty period closed with punchlist items addressed. Landscaping maintenance will continue until May 2021.

Project Type: TRANSPORTATION PROJECTS
Project Name: Rte 29 / Rte 250 Bypass Interchange
Description: Adding one lane on 29 South with pedestrian improvements.
Location: 29 South between Hydraulic Rd and Barracks Rd exit.
Budget:
Start Date: 12/01/06
Project Manager: Jeanette Janiczek
Status: Archived CIP
Comments: COMPLETE.

Project Type: TRANSPORTATION PROJECTS
Project Name: Stribling Ave - Tony, Tim, and Jerry
Description: Install a sidewalk along Stribling Ave from the City Limits to Jefferson Park Ave. This project's scope may include utility relocaiton, storm water management improvements, adjusting the exisitng R/W, driveway tie-ins, retaining wall installation, rapid flashing beacons installed, crosswalks, curb ramps, and the installation of a sidewalk facility one, both, or alternating sides of the roadway.
Location: City Limit to JPA
Budget: 7200000
Start Date: 01/01/23
Project Manager: Tony Edwards, Tim Motsch, Jerry Allen
Status: Active CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 1) Center Avenue Water Main Replacement
Description: Replacement of 1,580' of 6" cast iron pipe with 8" ductile iron pipe.
Location: Center Ave
Budget: 719558
Start Date: 05/24/21
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 1) Annual Large Water Meter Replacement Program
Description: Program to replace commercial meters 1.5" and larger in order to minimize water loss, as well as upgrade the services and meter setters for future maintenance and testing.
Location: Citywide
Budget: 750000
Start Date: 08/01/18
Project Manager: Department of Utilities
Status: Archived CIP
Comments: Contractor is currently working on meters in the Venable Neighborhood.

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 1) Brandywine Drive Water Main Replacement
Description: Replace waterline in Brandywine with 8in DIP
Location: Brandywine Dr from King Mountain Rd to Hydraulic Rd
Budget:
Start Date: 11/27/19
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 1) Greenleaf Lane Water Main Replacement
Description: Replace 1,520' of 6" cast iron main with 8" ductile iron main.
Location: Greenleaf Lane
Budget: 584930
Start Date: 01/05/22
Project Manager: Todd Morris
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 1.) Sawson Dr and Shelby Dr
Description: Installing new 6in DIP
Location: Swanson Dr and Shelby Dr
Budget:
Start Date: 08/27/18
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 11th St NW WL Replacement
Description: Install 322-feet of 8-inch DIP waterline to replace existing 2-inch galvanized waterlines and replace 8 water services.
Location: 11th St NW
Budget: 174448
Start Date: 09/05/23
Project Manager: Todd Morris
Status: Archived CIP
Comments: Todd Morris - 4344008313 - morrist@charlottesville.com

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 2) Page Street Water Main Replacement
Description: Replace 1,300' of 10" cast iron main with 12" and 8" ductile iron main.
Location: Page St
Budget: 640717
Start Date: 02/09/22
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 2) River Court Water Main Replacement
Description: Replacing 350' of problematic 2" HDPE water main with 6" ductile iron water main, and installing two new fire hydrants. The size increase will allow the Department to provide fire protection to the cul-de-sac.
Location: River Court
Budget: 148840
Start Date: 10/07/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 2) Swanson Drive Water Main Replacement
Description: Replace 850' of cast iron water main with ductile iron pipe
Location: Swanson Drive
Budget: 0
Start Date: 09/01/18
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 2) University Circle Water Main Replacement
Description: Replacing parallel 4" and 6" cast iron mains with one 6" ductile iron main.
Location: University Circle
Budget: 876150
Start Date: 06/01/20
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 2) University Circle Water Main Replacement
Description: Replacing existing water main with new 6" ductile iron pipe.
Location: University Circle
Budget: 876150
Start Date: 07/01/20
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 2.) Emmet/ Ivy Water Main Replacement
Description: Pipe bursting and open-trench methods are being used to replace two parallel 6" cast iron water mains with one 8" ductile iron water main.
Location: Emmet St and Ivy Rd
Budget: 1990000
Start Date: 10/01/18
Project Manager: Department of Utilities
Status: Archived CIP
Comments: The project is in the final stages- final tie-ins, final asphalt, and punch list.

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 250 Bypass/ Fire Station WL Replacement
Description: Install 1,700-feet of new 8-inch waterline and a new service line for the existing fire station.
Location: 250 Bypass
Budget: 345619
Start Date: 06/01/23
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester, 434-970-3908 or nesterr@charlottesville.gov

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 3) Emmet Street and Ivy Road Waterline Replacement
Description: Pipe Bursting and Open Cutting to install 8in waterline
Location: Emmet St from McCormick to Ivy Rd and Ivy Rd to STAB
Budget:
Start Date: 04/22/19
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 3) Leigh Place Water Main Replacement
Description: Replace 225' of 2" Galv with 2" Municipex and replace services.
Location: Leigh Place
Budget: 86440
Start Date: 05/06/22
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 3) Washington Ave Water Main Replacement
Description: Replacing 850' of 2" galvanized water main with 8" ductile iron pipe, allowing for fire hydrants along the street. Prior to this project, the street did not have fire protection.
Location: Washington Ave
Budget: 199600
Start Date: 06/17/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 3) Washington Park Water Main Installation
Description: Install 800' of 8" ductile iron main through the park to make a looped connection for better hydraulics.
Location: Washington Park
Budget: 187230
Start Date: 11/08/21
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 4) Bunker Hill Drive Water Main Replacement
Description: Replacement of 560' of 2" galvanized steel pipe with 6" ductile iron main.
Location: Bunker Hill Drive
Budget: 175670
Start Date: 05/17/21
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 4) Rugby Road Services
Description: Switch over five water services to a 12" water main from a parallel 6" water main in order to abandon the redundant 6" main. Two additional water main tie-ins at the intersections of Barracks Rd and Mason Ln will also occur.
Location: Rugby Rd
Budget: 77520
Start Date: 10/04/21
Project Manager: Todd Morris
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 4) 14th St NW Water Services
Description: Moving all services from a 4" water main to a 12" water main. This will allow for the abandonment of the parallel 4" main.
Location: 14th St NW
Budget: 185888
Start Date: 06/15/20
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 4) 15th St NW Water Main Replacement
Description: Replacing 150' of water main with new 2" Municipex.
Location: 15th St NW
Budget: 35950
Start Date: 11/13/20
Project Manager: Todd Morris
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 4) Barracks Rd Water Main Installation
Description: Install New 960ft of 6" and 8" Ductile Iron Pipe
Location: Barracks Rd between Hessian Rd and Blue Ridge Rd
Budget: 304331
Start Date: 06/16/22
Project Manager: Roy Nester
Status: Archived CIP
Comments: Install water main for better system looping

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 4) Large Meter Replacements- Ridge Street Group
Description: Evaluate and replace water meters 1.5" and larger
Location: Ridge Street Neighborhood
Budget: 0
Start Date: 12/01/18
Project Manager: Anthony Allard
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 4) Large Meter Replacements- Ridge Street Group
Description: Evaluate and replace water meters 1.5" and larger
Location: Ridge Street Neighborhood
Budget: 0
Start Date: 12/01/18
Project Manager: Anthony Allard
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 4) Piedmont Ave S Water Main Replacement
Description: Replacing 600' of 2" galvanized steel pipe with 6" and 8" ductile iron pipe.
Location: Piedmont Ave S
Budget: 159730
Start Date: 11/02/20
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 4th Street SW WL Replacement
Description: Install 970 feet of 8-inch DIP to replace 2-inch galvanized and 6-inch cast Iron waterline. Replace 8 water services.
Location: 4th St Sw
Budget: 294300
Start Date: 12/19/22
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester, 434-970-3908 or nesterr@charlottesville.gov

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 5) 14th Street Water Main Replacement
Description: Replace 526' of 6" main with 12" ductile iron main and relocated services
Location: 14th Street NW from W Main to John St
Budget: 341306
Start Date: 05/16/22
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 5) Marie Place Water Main Replacement
Description: Replacing 200' of 2" galvanized steel with 2" municipex.
Location: Marie Place
Budget: 62695
Start Date: 12/14/20
Project Manager: Todd Morris
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 5) Rose Hill Group Large Meter Replacement
Description: Replace meters above 1in in size
Location: Rose Hill Dr Area
Budget:
Start Date: 09/17/18
Project Manager: Anthony Allard
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 5) West Main 18" Water Main Replacement
Description: Install approximately 1,000' of 18" ductile iron water main on Roosevelt Brown from Grove Rd to West Main St, then turn east on West Main and extend pipe to the intersection of 9th St NW. This project will eliminate a problematic railroad crossing on 9th St NW, as well as improve the connectivity to the Rivanna Water and Sewer Authority's Urban Water Line at the intersection of 9th St NW.
Location: Roosevelt Brown and West Main
Budget: 1159410
Start Date: 10/14/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 6) Stonefield Lane Water Main Replacement
Description: Replace 460' of existing 2" galvanized steel water main with 6" ductile iron pipe.
Location: Stonefield Ln
Budget: 143700
Start Date: 09/27/21
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 6) Kent Terrace Water Main Replacement
Description: Replacing 350' of 2" galvanized steel water main with 6" ductile iron pipe.
Location: Kent Terrace
Budget: 112840
Start Date: 11/30/20
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: 7) Kent Road Water Main Replacement
Description: Replace 925' of 6" cast iron water main with 8" ductile iron pipe.
Location: Kent Rd
Budget: 383860
Start Date: 08/23/21
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Amherst St Main Replacement
Description: Replacing section of main on Amherst St from Greenway to Amherst Commons.
Location: Amherst St between Greenway Rd and Amhest Commons
Budget: 325000
Start Date: 04/01/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments: Project replacing existing 6" cast iron main with 8" ductile iron main.

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Bolling Ave Water Main Replacement
Description: Replacement of 2200 linear feet of 6" cast iron with 6" ductile iron water main.
Location: Bolling Ave
Budget: 725500
Start Date: 03/02/20
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: David Terrace WL Replacement
Description: Install 310 feet of 6-inch DIP to replace existing 2-inch galvanized water main. Replace 10 water services and install 1 fire hydrant.
Location: David Terrace
Budget: 177400
Start Date: 10/20/22
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Druid Ave Survey Work
Description: Surveying the area to gather information for upcoming public utility projects
Location: Druid Ave
Budget: 0
Start Date: 08/04/23
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester, 434-970-3908 or nesterr@charlottesville.gov

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Elliot Avenue WL Replacement
Description: Install 705 feet of 8-inch DIP to replace 2-inch galvanized waterline. Replace 17 water services and install 1 fire hydrant.
Location: Waterline Replacement
Budget: 311050
Start Date: 10/03/22
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester, 434-970-3908 or nesterr@charlottesville.gov

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Fendall Terrace Water Main Replacement
Description: Replacing 360' of 6" cast iron with 6" ductile iron pipe and 200' of 2" galvanized steel with 2" Municipex (PEXa) pipe.
Location: Fendall Terrace
Budget: 140820
Start Date: 02/22/21
Project Manager: Todd Morris
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Forest Hills Ave Survey Work
Description: Surveying the area to gather information for upcoming public utility projects
Location: Forest Hills
Budget: 0
Start Date: 08/04/23
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester, 434-970-3908 or nesterr@charlottesville.gov

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Grimes Pl WL Replacement
Description: Install 200-feet of 2-inch Municipex waterline to replace existing 2-inch galvanized waterlines and replace 5 water services and 1 fire hydrant.
Location: Grimes Pl
Budget: 104685
Start Date: 01/22/24
Project Manager: Todd Morris
Status: Completed CIP
Comments: Todd Morris - (434)-400-8313 - morrist@charlottesville.com

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Lewis Mountain Circle WL Replacement
Description: Install 290 feet of 6-inch DIP to replace 2-inch galvanized waterline. Replace 185 water services and install 1 fire hydrant.
Location: Lewis Mountain Cit
Budget: 132100
Start Date: 10/24/22
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester, 434-970-3908 or nesterr@charlottesville.gov

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Marion Ct WL Replacement
Description: Install 200-feet of 6-inch DIP waterline to replace existing 2-inch galvanized waterline. Replace 3 water services.
Location: Marion Ct
Budget: 80218
Start Date: 04/03/23
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester, 434-970-3908 or nesterr@charlottesville.gov

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Meadowbrook Court WL Replacement
Description: Install 330-feet of 6-inch DIP waterline to replace existing 2-inch galvanized waterlines and replace 5 water services and 1 fire hydrant.
Location: Meadowbrook Ct
Budget: 171202
Start Date: 11/27/23
Project Manager: Todd Morris
Status: Archived CIP
Comments: Todd Morris - (434)-400-8313 - morrist@charlottesville.com

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Meriwether St WL Replacement
Description: Install 86-feet of 6-inch DIP and 1756-feet of 8-inch DIP waterline to replace existing 2-inch and 6-inch galvanized waterlines. Replace 38 water services and 4 fire hydrants.
Location: Meriwether St
Budget: 748597
Start Date: 02/08/23
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester - nesterr@charlottesville.gov - (434)-970-3908

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Moore Ave WL Replacement
Description: Install 357-feet of 6-inch DIP waterline to replace existing 2-inch galvanized waterlines. Replace 5 water services.
Location: Moore Ave
Budget: 83259
Start Date: 04/26/23
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester, 434-970-3908 or nesterr@charlottesville.gov

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Perry St and Wine St WL Replacement
Description: Install 1421-feet of 8-inch DIP waterline and 135-feet of 6-inch DIP waterline to replace existing 2-inch galvanized waterlines and replace 29 water services.
Location: Perry St and Wine St
Budget: 731925
Start Date: 10/30/23
Project Manager: Todd Morris
Status: Active CIP
Comments: Todd Morris - 4344008313 - morrist@charlottesville.com

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Rothery Road Water Main Replacement
Description: Replacing two dead-end 2" galvanized steel mains with one 810' looped 6" ductile iron main.
Location: Rothery Road
Budget: 228330
Start Date: 05/17/21
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Sheridan Avenue - Phase 1
Description: Install 1315-feet of 8-inch DIP waterline to replace existing 6-inch water main and replace 23 water services and 1 fire hydrant.
Location: Sheridan Avenue
Budget: 567989
Start Date: 01/15/24
Project Manager: Todd Morris
Status: Active CIP
Comments: Todd Morris - (434)-400-8313 - morrist@charlottesville.com

Project Type: WATER UTILITY IMPROVEMENT
Project Name: St. Clair Avenue Service Replacement
Description: Replacing all services on St. Clair from 250 Bypass to Poplar St, switching onto a 12 inch main in street.
Location: Citywide
Budget: 175000
Start Date: 04/01/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments: Project includes switching services from an existing 6" cast iron main to a parallel 12" cast iron main in order to abandon the 6".

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Stratford Court WL Replacement
Description: Install 350 feet of 8-inch DIP and 320 feet of 6-inch DIP to replace 2-inch galvanized waterline. Replace 18 water services and install 2 fire hydrants.
Location: Stratford Court and Shamrock Rd
Budget: 328400
Start Date: 12/01/22
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester, 434-970-3908 or nesterr@charlottesville.gov

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Thomas Drive WL Replacement
Description: Install 10-feet of 12-inch DIP and 220-feet of 8-inch DIP waterline
Location: Thomas Dr
Budget: 80237
Start Date: 03/01/23
Project Manager: Roy Nester
Status: Archived CIP
Comments: Roy Nester, 434-970-3908 or nesterr@charlottesville.gov

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Troost Court/ McElroy Drive Water Main Replacement
Description: Replacement of 465' of 2" galvanized steel water main with 2" Municipex pipe.
Location: Troost Court and McElroy Drive
Budget: 150575
Start Date: 05/10/21
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Troost Court/ McElroy Drive Water Main Replacement
Description: Replacement of 465' of 2" galvanized steel water main with 2" Municipex pipe.
Location: Troost Court and McElroy Drive
Budget: 150575
Start Date: 05/10/21
Project Manager: Roy Nester
Status: Archived CIP
Comments:

Project Type: WATER UTILITY IMPROVEMENT
Project Name: University Avenue Main Replacement
Description:
Location: University Avenue between Elliewood Ave and Rugby Rd
Budget: 175000
Start Date: 04/01/19
Project Manager: Department of Utilities
Status: Archived CIP
Comments: Project includes installing an 8" ductile iron main in order to abandon a 10" cast iron main through UVA campus.

Project Type: WATER UTILITY IMPROVEMENT
Project Name: Ware Street Water Main Replacement
Description: Replace two dead-end 2" galvanized steel water mains with 550' of 6" ductile iron pipe. This will create a looped water system providing better water quality, water volume, and fire flow for the streets.
Location: Ware Street, Rayon Street, and Robinson Place
Budget: 199815
Start Date: 02/15/21
Project Manager: Roy Nester
Status: Archived CIP
Comments: